NPDES UTRC07597 · Clean Water Act
FRONTIER SUBDIVISION #1-21, Washington, UT: NPDES UTRC07597 discharge permit, effluent exceedances, inspections, penalties
FRONTIER SUBDIVISION #1-21, Washington, Utah: General permit coverage UTRC07597, held by HLH Frontier LLC; Construction stormwater; Administratively continued; issued October 1, 2024, term to September 17, 2025, by UTDEQ.
Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 7,808 were issued before UTRC07597.
Coverages issued nearest UTRC07597
- 2024-09-30: REEDY RESIDENCE, Park City: UTRH03991, held by Highland Custom Homes
- 2024-09-30: BYBEE RESIDENCE, Park City: UTRH08667, held by Highland Custom Homes
- 2024-09-30: 5029 N LAKE MOUNTAIN RD, Eagle Mountain: UTRH08672, held by Jessica Carothers
- 2024-10-01: JEFFERSON PARK, Murray: UTRC03594, held by Next Level Homes
- 2024-10-01: COTTAM COVE, St. George: UTRC06010, held by Wright Homes
- 2024-10-01: MOUNTAIN VIEW FLEX, West Valley City: UTRC07640, held by Affinity Construction
- 2024-10-01: LIMITLESS POOL, Farmington: UTRC09649, held by Green Shield Landscaping LLC
- 2024-10-01: ROLLINS RANCH, Mountain Green: UTRC09650, held by Scott Carter Construction and Custom Homes
- 2024-10-01: MADIGAN RESIDENCE BY DEUSHANE PROPERTIES, Salem: UTRH08677, held by Mike Deushane
- 2024-10-01: BRIXTON PARK, Saratoga Springs: UTRH08681, held by Desert West Homes, Inc
FRONTIER SUBDIVISION #1-21 among its neighbors
214 discharge permits are in the Cottonwood Wash-Virgin River subwatershed (HUC 150100080909); UTRC07597 is one.
Other permits in the Cottonwood Wash-Virgin River subwatershed (HUC 150100080909)
- 1837 E SCENIC VIEW CIRCLE, WASHINGTON UTAH 84780, Washington: UTRH01574, minor, term to 2021-10-23
- 1840 E SCENIC VIEW CIRCLE WASHINGTON UT 84780, Washington: UTRC01480, minor, term to 2021-10-21
- 2645 EAST WASHINGTON DAM ROAD, St. George: UTRC00868, minor, term to 2021-07-21
- 321 N OLD HWY 91, Hurricane: UTRI00229, minor, term to 2023-12-31
- 5 PAINTED HILLS @ RLINGTON HEIGHTS, Hurricane: UTRH04046, minor, term to 2022-10-13
- 90TH NORTH ROADWAY, Hurricane: UTRC12859, minor, term to 2027-05-19
- AMARA AT CORAL CANYON, Washington: UTRC12979, minor, term to 2027-06-08
- ARROYO AT SIENNA HILLS PHASE 4&5, Washington: UTR392695, minor, term to 2021-04-18
- ARROYO AT SIENNA HILLS PHASE 7, Washington: UTR396861, minor, term to 2020-10-17
- ARROYO PHASE 6 (LOTS 96-114 & 123-166), ARROYO PHASE 8 (196-223), Washington: UTR392267, minor, term to 2021-03-29
What stands out
- Its term runs 351 days, October 1, 2024 to September 17, 2025; the term ended 392 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to October 14, 2026.
- It is one of 17,184 discharge permits on the register in Utah; 14,166 of them (82%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | FRONTIER SUBDIVISION #1-21 |
|---|---|
| Permittee | HLH Frontier LLC |
| NPDES ID | UTRC07597 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | October 1, 2024 |
| Expires | September 17, 2025 |
| Agency | UTDEQ |
| Address | Washington, UT 84780 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Cottonwood Wash-Virgin River (HUC 150100080909) |
NPDES UTRC07597: effluent limits and exceedances
FRONTIER SUBDIVISION #1-21 (NPDES UTRC07597): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES UTRC07597: no pollutant row on file.
NPDES UTRC07597: inspections, violations and enforcement
NPDES UTRC07597 (FRONTIER SUBDIVISION #1-21): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES UTRC07597
NPDES UTRC07597: one email when its EPA record changes — $99/month.
Permits near NPDES UTRC07597
NPDES UTRC07597: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.