NPDES UTRC07658 · Clean Water Act
TWIN LAKES PHASES 1-4, St. George, UT: NPDES UTRC07658 discharge permit, effluent exceedances, inspections, penalties
TWIN LAKES PHASES 1-4, St. George, Utah: General permit coverage UTRC07658, held by AJ Construction; Construction stormwater; Administratively continued; issued October 15, 2024, term to September 26, 2025, by UTDEQ.
Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 7,909 were issued before UTRC07658. AJ Construction holds 8 permits in Utah.
Other permits held by AJ Construction
- BRET CARTER RESIDENCE, Washington: UTRC01389, issued 2020-10-07
- HERITAGE POINT TOWNHOMES, Santa Clara: UTRC01436, issued 2020-10-14
- IPS PLANT, St. George: UTRC03540, issued 2021-09-22
- ENVIROGUARD, St. George: UTRC07750, issued 2023-10-16
- DIAMOND C OFFICE AND SHOP, Washington: UTRC11611, issued 2025-09-16
- FORT PIERCE WASH EROSION PROTECTION, St. George: UTRC11931, issued 2025-11-17
- PARAGON BUSINESS PARK, Hurricane: UTRC13117, issued 2026-06-30
Coverages issued nearest UTRC07658
- 2024-10-14: GORDON, Salem: UTRH08744, held by Bruce Farnsworth
- 2024-10-14: THE HOLLOWS 44, Highland: UTRH08746, held by Classic Jack Construction
- 2024-10-14: PARKSIDE #204, Toquerville: UTRH08747, held by Jake Hulet Construction
- 2024-10-14: SUNRISE VALLEY INDUSTRIAL #7, Washington: UTRH08749, held by Ransdell Trucking
- 2024-10-15: THE MILL, Midvale: UTRC03754, held by Garbett Construction, Inc.
- 2024-10-15: DESERT VISTA TOWNHOMES AT DESERT CANYONS, St. George: UTRC07767, held by Salisbury Homes
- 2024-10-15: NORTH FORK SSD WTF, Provo: UTRC09724, held by COP Construction
- 2024-10-15: PEACH SPRINGS ESTATES, Hurricane: UTRC09725, held by Smooth Stone Construction
- 2024-10-15: SH CROSSROADS WATERLINE, Hurricane: UTRC09727, held by Royal T
- 2024-10-15: COLEMAN VU, Riverdale: UTRC09729, held by Fieldstone Riverside Estates LLC
TWIN LAKES PHASES 1-4 among its neighbors
636 discharge permits are in the Middleton Wash-Virgin River subwatershed (HUC 150100080910); UTRC07658 is one.
Other permits in the Middleton Wash-Virgin River subwatershed (HUC 150100080910)
- 1103 ST GEORGE (SG-5-3-10-1103), St. George: UTRH06625, minor, term to 2024-05-17
- 123 CRIMSON VISTA, St. George: UTRH03262, minor, term to 2022-06-17
- 1236 S SIERRA VISTA CIRCLE, St. George: UTRL00265
- 1358 E PONY TRAIL WAY WASHINGTON, UTAH 84780, Washington: UTRH10276, minor, term to 2026-09-04
- 1450 EAST ROADWAY EXTENSION, St. George: UTRC03020, minor, term to 2022-06-20
- 1450 EAST ROADWAY EXTENSION, St. George: UTRC03088, minor, term to 2022-07-05
- 29 BOULDERS, St. George: UTRH03475, minor, term to 2022-07-26
- 30 GRAND HEIGHTS, St. George: UTRH03266, minor, term to 2022-06-17
- 34 WESTGATE HILLS, Washington: UTRH05029, minor, term to 2023-04-10
- 3430 E/EZRA LN IMPROVMENTS, St. George: UTRL00727
What stands out
- Its term runs 346 days, October 15, 2024 to September 26, 2025; the term ended 354 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to September 15, 2026.
- It is one of 17,184 discharge permits on the register in Utah; 14,166 of them (82%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | TWIN LAKES PHASES 1-4 |
|---|---|
| Permittee | AJ Construction |
| NPDES ID | UTRC07658 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | October 15, 2024 |
| Expires | September 26, 2025 |
| Agency | UTDEQ |
| Address | St. George, UT 84770 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Middleton Wash-Virgin River (HUC 150100080910) |
NPDES UTRC07658: effluent limits and exceedances
TWIN LAKES PHASES 1-4 (NPDES UTRC07658): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES UTRC07658: no pollutant row on file.
NPDES UTRC07658: inspections, violations and enforcement
NPDES UTRC07658 (TWIN LAKES PHASES 1-4): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES UTRC07658
NPDES UTRC07658: one email when its EPA record changes — $99/month.
Permits near NPDES UTRC07658
NPDES UTRC07658: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.