Velarion Records
Free: one email when NPDES UTRC08627 changes. Unsubscribe any time.

NPDES UTRC08627 · Clean Water Act

TRAILSIDE PHASE 3, Cedar City, UT: NPDES UTRC08627 discharge permit, effluent exceedances, inspections, penalties

TRAILSIDE PHASE 3, Cedar City, Utah: General permit coverage UTRC08627, held by Luminary Trailside, LLC; Construction stormwater; Administratively continued; issued April 11, 2024, term to April 10, 2025, by UTDEQ.

Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 6,935 were issued before UTRC08627. Luminary Trailside, LLC holds 2 permits in Utah.

Other permits held by Luminary Trailside, LLC

Coverages issued nearest UTRC08627

Other permits in Cedar City

Identity

FacilityTRAILSIDE PHASE 3
PermitteeLuminary Trailside, LLC
NPDES IDUTRC08627
StatusAdministratively continued
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramConstruction stormwater
IssuedApril 11, 2024
ExpiresApril 10, 2025
AgencyUTDEQ
AddressCedar City, UT 84721

NPDES UTRC08627: effluent limits and exceedances

TRAILSIDE PHASE 3 (NPDES UTRC08627): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.

NPDES UTRC08627: no pollutant row on file.

NPDES UTRC08627: inspections, violations and enforcement

NPDES UTRC08627 (TRAILSIDE PHASE 3): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.

Watch NPDES UTRC08627

NPDES UTRC08627: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES UTRC08627

NPDES UTRC08627: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.