NPDES UTRC09145 · Clean Water Act
RCI COMMERCIAL, St. George, UT: NPDES UTRC09145 discharge permit, effluent exceedances, inspections, penalties
RCI COMMERCIAL, St. George, Utah: General permit coverage UTRC09145, held by KRB Development, Inc.; Construction stormwater; Administratively continued; issued July 3, 2024, term to July 2, 2025, by UTDEQ.
Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 7,352 were issued before UTRC09145.
Coverages issued nearest UTRC09145
- 2024-07-02: LOT 307 SUNSET RIDGE, Ogden: UTRH08262, held by CK Construction & Roofing, Inc.
- 2024-07-03: US-6 MP 70 TO 73.5 SHOULDERING, MILLARD COUNTY, Delta: UTRC07160, held by Utah Department of Transportation, Region 4
- 2024-07-03: DAVIS AQUEDUCT REACH 1, Ogden: UTRC07194, held by Whitaker Construction Co., Inc.
- 2024-07-03: TILIA COURT, Lindon: UTRC07204, held by MK Excavating
- 2024-07-03: CJM APARTMENTS, Price: UTRC09126, held by National Salvage
- 2024-07-03: LOT 87 RIDGE VIEW ESTATES, Salem: UTRH08265, held by Gordon Milar Construction LLC
- 2024-07-03: MARCELLA LOT 6, Heber City: UTRH08268, held by McNulty Construction
- 2024-07-03: MARCELLA LOT 7, Heber City: UTRH08269, held by McNulty Construction
- 2024-07-03: MARCELLA LOT 8, Heber City: UTRH08270, held by McNulty Construction
- 2024-07-05: BUTTERFEILD HOLLOW, Herriman: UTRC02844, held by Hallmark Homes and Development Inc
RCI COMMERCIAL among its neighbors
636 discharge permits are in the Middleton Wash-Virgin River subwatershed (HUC 150100080910); UTRC09145 is one.
Other permits in the Middleton Wash-Virgin River subwatershed (HUC 150100080910)
- 1103 ST GEORGE (SG-5-3-10-1103), St. George: UTRH06625, minor, term to 2024-05-17
- 123 CRIMSON VISTA, St. George: UTRH03262, minor, term to 2022-06-17
- 1236 S SIERRA VISTA CIRCLE, St. George: UTRL00265
- 1358 E PONY TRAIL WAY WASHINGTON, UTAH 84780, Washington: UTRH10276, minor, term to 2026-09-04
- 1450 EAST ROADWAY EXTENSION, St. George: UTRC03020, minor, term to 2022-06-20
- 1450 EAST ROADWAY EXTENSION, St. George: UTRC03088, minor, term to 2022-07-05
- 29 BOULDERS, St. George: UTRH03475, minor, term to 2022-07-26
- 30 GRAND HEIGHTS, St. George: UTRH03266, minor, term to 2022-06-17
- 34 WESTGATE HILLS, Washington: UTRH05029, minor, term to 2023-04-10
- 3430 E/EZRA LN IMPROVMENTS, St. George: UTRL00727
What stands out
- Its term runs 364 days, July 3, 2024 to July 2, 2025; the term ended 469 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to October 14, 2026.
- It is one of 17,184 discharge permits on the register in Utah; 14,166 of them (82%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | RCI COMMERCIAL |
|---|---|
| Permittee | KRB Development, Inc. |
| NPDES ID | UTRC09145 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | July 3, 2024 |
| Expires | July 2, 2025 |
| Agency | UTDEQ |
| Address | St. George, UT 84770 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Middleton Wash-Virgin River (HUC 150100080910) |
NPDES UTRC09145: effluent limits and exceedances
RCI COMMERCIAL (NPDES UTRC09145): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES UTRC09145: no pollutant row on file.
NPDES UTRC09145: inspections, violations and enforcement
NPDES UTRC09145 (RCI COMMERCIAL): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES UTRC09145
NPDES UTRC09145: one email when its EPA record changes — $99/month.
Permits near NPDES UTRC09145
NPDES UTRC09145: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.