NPDES UTRC09589 · Clean Water Act
QUAIL CREEK PHASES 5-8, Hurricane, UT: NPDES UTRC09589 discharge permit, effluent exceedances, inspections, penalties
QUAIL CREEK PHASES 5-8, Hurricane, Utah: General permit coverage UTRC09589, held by Dennett Construction, Inc.; Construction stormwater; Administratively continued; issued September 20, 2024, term to September 19, 2025, by UTDEQ.
Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 7,745 were issued before UTRC09589. Dennett Construction, Inc. holds 5 permits in Utah.
Other permits held by Dennett Construction, Inc.
- QUEENSRIDGE PHASE 2 & 3, Washington: UTRC04295, issued 2022-01-30
- DENNETT EAST INDUSTRIAL PHASE 2, Washington: UTRC04406, issued 2025-03-13
- QUAIL CREEK PHASE 5 & 6, Hurricane: UTRC07075, issued 2023-06-14
- SHOOTING STAR PHASE 8, Washington: UTRC13077, issued 2026-06-23
Coverages issued nearest UTRC09589
- 2024-09-20: VALO ON VINE TOWNHOMES, Tooele: UTRC09580, held by AIM Construction, LLC
- 2024-09-20: LOT 15 THE PALISADES AT SNOW CANYON, Ivins: UTRC09582, held by Cool Homes, Inc.
- 2024-09-20: WALLSBURG 12 REBUILD, Provo: UTRC09583, held by Fibertel
- 2024-09-20: NORTH UTAH REDUNDANCY PROJECT, Brigham City: UTRC09585, held by Fibertel
- 2024-09-20: KIAHTIPES SOUTH STORAGE UNIT COMPLEX, Price: UTRC09586, held by Angelo Kiahtipes
- 2024-09-22: CHACO SOUTH #74, St. George: UTRH08622, held by Split Rock Construction
- 2024-09-22: THE RESERVES #65, Ivins: UTRH08625, held by Split Rock Construction
- 2024-09-23: WILDFIRE ESTATES, West Point: UTRC07666, held by MS Architecture
- 2024-09-23: PANGUITCH MUNICIPAL AIRPORT RUNWAY REHABILITATION, Panguitch: UTRC09594, held by Sunroc Corporation
- 2024-09-23: SAGEWOOD RANCH RECEPTION, Salt Lake City: UTRC09597, held by Craig Bonham
QUAIL CREEK PHASES 5-8 among its neighbors
214 discharge permits are in the Cottonwood Wash-Virgin River subwatershed (HUC 150100080909); UTRC09589 is one.
Other permits in the Cottonwood Wash-Virgin River subwatershed (HUC 150100080909)
- 1837 E SCENIC VIEW CIRCLE, WASHINGTON UTAH 84780, Washington: UTRH01574, minor, term to 2021-10-23
- 1840 E SCENIC VIEW CIRCLE WASHINGTON UT 84780, Washington: UTRC01480, minor, term to 2021-10-21
- 2645 EAST WASHINGTON DAM ROAD, St. George: UTRC00868, minor, term to 2021-07-21
- 321 N OLD HWY 91, Hurricane: UTRI00229, minor, term to 2023-12-31
- 5 PAINTED HILLS @ RLINGTON HEIGHTS, Hurricane: UTRH04046, minor, term to 2022-10-13
- 90TH NORTH ROADWAY, Hurricane: UTRC12859, minor, term to 2027-05-19
- AMARA AT CORAL CANYON, Washington: UTRC12979, minor, term to 2027-06-08
- ARROYO AT SIENNA HILLS PHASE 4&5, Washington: UTR392695, minor, term to 2021-04-18
- ARROYO AT SIENNA HILLS PHASE 7, Washington: UTR396861, minor, term to 2020-10-17
- ARROYO PHASE 6 (LOTS 96-114 & 123-166), ARROYO PHASE 8 (196-223), Washington: UTR392267, minor, term to 2021-03-29
What stands out
- Its term runs 364 days, September 20, 2024 to September 19, 2025; the term ended 390 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to October 14, 2026.
- It is one of 17,184 discharge permits on the register in Utah; 14,166 of them (82%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | QUAIL CREEK PHASES 5-8 |
|---|---|
| Permittee | Dennett Construction, Inc. |
| NPDES ID | UTRC09589 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | September 20, 2024 |
| Expires | September 19, 2025 |
| Agency | UTDEQ |
| Address | Hurricane, UT 84737 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Cottonwood Wash-Virgin River (HUC 150100080909) |
NPDES UTRC09589: effluent limits and exceedances
QUAIL CREEK PHASES 5-8 (NPDES UTRC09589): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES UTRC09589: no pollutant row on file.
NPDES UTRC09589: inspections, violations and enforcement
NPDES UTRC09589 (QUAIL CREEK PHASES 5-8): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES UTRC09589
NPDES UTRC09589: one email when its EPA record changes — $99/month.
Permits near NPDES UTRC09589
NPDES UTRC09589: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.