NPDES UTRC09742 · Clean Water Act
STONE CLIFFS PHASES 18 & 19, St. George, UT: NPDES UTRC09742 discharge permit, effluent exceedances, inspections, penalties
STONE CLIFFS PHASES 18 & 19, St. George, Utah: General permit coverage UTRC09742, held by Traveller Development; Construction stormwater; Effective; issued October 17, 2024, term to October 16, 2025, by UTDEQ.
Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 7,927 were issued before UTRC09742. Traveller Development holds 2 permits in Utah.
Other permits held by Traveller Development
- STONE CLIFF PHASES 18 & 19, St. George: UTRC05018, issued 2022-05-10
Coverages issued nearest UTRC09742
- 2024-10-16: HAWKEYE POINTE #105, Washington: UTRH08755, held by Kyle Boyer
- 2024-10-16: SILVER SKY LOFTS, North Salt Lake: UTRH08757, held by Foresight Development
- 2024-10-16: RICHINS RESIDENCE, Henefer: UTRH08758, held by Matthew King
- 2024-10-17: MORGAN HIGH SHOP ADDITION, Morgan: UTRC09735, held by Hogan & Associates
- 2024-10-17: V4LIP3 DESIGNER SERIES, South Jordan: UTRC09739, held by Destination Homes
- 2024-10-17: WCWCD - APPLE VALLEY EMERGENCY WORK PH. 1&2, Hurricane: UTRC09743, held by Interstate Rock Products
- 2024-10-17: SILVER OAKS, Santaquin: UTRC09744, held by Lennar Homes of Utah, LLC
- 2024-10-17: HOMESTEADS #42, Washington: UTRH08761, held by ZJ Builders, Inc
- 2024-10-17: LOT 49, Eden: UTRH08764, held by Pamela Russell
- 2024-10-17: CHAPARRAL HEIGHTS LOT 1, Washington: UTRH08768, held by RL WYMAN DESIGN CREATE
STONE CLIFFS PHASES 18 & 19 among its neighbors
636 discharge permits are in the Middleton Wash-Virgin River subwatershed (HUC 150100080910); UTRC09742 is one.
Other permits in the Middleton Wash-Virgin River subwatershed (HUC 150100080910)
- 1103 ST GEORGE (SG-5-3-10-1103), St. George: UTRH06625, minor, term to 2024-05-17
- 123 CRIMSON VISTA, St. George: UTRH03262, minor, term to 2022-06-17
- 1236 S SIERRA VISTA CIRCLE, St. George: UTRL00265
- 1358 E PONY TRAIL WAY WASHINGTON, UTAH 84780, Washington: UTRH10276, minor, term to 2026-09-04
- 1450 EAST ROADWAY EXTENSION, St. George: UTRC03020, minor, term to 2022-06-20
- 1450 EAST ROADWAY EXTENSION, St. George: UTRC03088, minor, term to 2022-07-05
- 29 BOULDERS, St. George: UTRH03475, minor, term to 2022-07-26
- 30 GRAND HEIGHTS, St. George: UTRH03266, minor, term to 2022-06-17
- 34 WESTGATE HILLS, Washington: UTRH05029, minor, term to 2023-04-10
- 3430 E/EZRA LN IMPROVMENTS, St. George: UTRL00727
What stands out
- Its term runs 364 days, October 17, 2024 to October 16, 2025; the term ended 334 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as effective.
- No dated event in the 365 days to September 15, 2026.
- It is one of 17,184 discharge permits on the register in Utah; 14,166 of them (82%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | STONE CLIFFS PHASES 18 & 19 |
|---|---|
| Permittee | Traveller Development |
| NPDES ID | UTRC09742 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | October 17, 2024 |
| Expires | October 16, 2025 |
| Agency | UTDEQ |
| Address | St. George, UT 84790 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Middleton Wash-Virgin River (HUC 150100080910) |
NPDES UTRC09742: effluent limits and exceedances
STONE CLIFFS PHASES 18 & 19 (NPDES UTRC09742): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES UTRC09742: no pollutant row on file.
NPDES UTRC09742: inspections, violations and enforcement
NPDES UTRC09742 (STONE CLIFFS PHASES 18 & 19): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES UTRC09742
NPDES UTRC09742: one email when its EPA record changes — $99/month.
Permits near NPDES UTRC09742
NPDES UTRC09742: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.