NPDES UTRC09795 · Clean Water Act
FINLEY FARMS PHASE 3, Washington, UT: NPDES UTRC09795 discharge permit, effluent exceedances, inspections, penalties
FINLEY FARMS PHASE 3, Washington, Utah: General permit coverage UTRC09795, held by Richmond American Homes of Utah, Inc.; Construction stormwater; Administratively continued; issued October 28, 2024, term to October 27, 2025, by UTDEQ.
Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 7,980 were issued before UTRC09795. Richmond American Homes of Utah, Inc. holds 13 permits in Utah.
Other permits held by Richmond American Homes of Utah, Inc.
- SOUTH HILLS POD 4, Herriman: UTR382149, issued 2019-08-21
- SIMPSON SPRINGS, Syracuse: UTR382595, issued 2019-09-19
- FOX HOLLOW N10, Saratoga Springs: UTR383524, issued 2019-11-27
- RAWLINGS MEADOWS, Orem: UTR385029, issued 2020-02-29
- MIRA BELLA, Herriman: UTR390741, issued 2020-01-10
- SPRINGS VILLAGE AT WANDER, Saratoga Springs: UTRC05204, issued 2024-05-15
- CANYON VIEW MEADOWS, Spanish Fork: UTRC08185, issued 2025-01-28
- DESERT COVE, Ivins: UTRC08884, issued 2025-05-09
- VISTA ESTATES, Ivins: UTRC08998, issued 2024-06-12
- CORDERO PHASE 1, Hurricane: UTRC09834, issued 2024-11-04
Coverages issued nearest UTRC09795
- 2024-10-28: NORTH TEMPLE LANDFILL/AIRPORT WEST VOLUNTARY CLEANUP PROGRAM SITE, Salt Lake City: UTRC05998, held by NT Development
- 2024-10-28: THE VILLAS @ LAVA KNOLLS BLDG 1, 2, 7 & 8, Hurricane: UTRC06096, held by Interstate Homes, LLC
- 2024-10-28: THE IVY, Millcreek: UTRC09788, held by Cole West North
- 2024-10-28: WASATCH PAIN SOLUTIONS, Sandy: UTRC09793, held by CRC Construction
- 2024-10-28: RESIDENCE AT MILLCREEK, Washington: UTRC09794, held by Rimrock Construction
- 2024-10-28: MAVERIK UT-0552, Kanab: UTRC09796, held by Maverick Inc
- 2024-10-28: SYCAMORE GLEN TOWNHOMES, Riverton: UTRC09797, held by BridgeCo Builders
- 2024-10-28: ASPEN CAMP 13, South Jordan: UTRH08771, held by Aecum Development
- 2024-10-28: DAVIS FARMS LOT 21, Salem: UTRH08807, held by Austin Richards
- 2024-10-28: GIBBONS HOME, Pleasant View: UTRH08809, held by Northern Builders
FINLEY FARMS PHASE 3 among its neighbors
636 discharge permits are in the Middleton Wash-Virgin River subwatershed (HUC 150100080910); UTRC09795 is one.
Other permits in the Middleton Wash-Virgin River subwatershed (HUC 150100080910)
- 1103 ST GEORGE (SG-5-3-10-1103), St. George: UTRH06625, minor, term to 2024-05-17
- 123 CRIMSON VISTA, St. George: UTRH03262, minor, term to 2022-06-17
- 1236 S SIERRA VISTA CIRCLE, St. George: UTRL00265
- 1358 E PONY TRAIL WAY WASHINGTON, UTAH 84780, Washington: UTRH10276, minor, term to 2026-09-04
- 1450 EAST ROADWAY EXTENSION, St. George: UTRC03020, minor, term to 2022-06-20
- 1450 EAST ROADWAY EXTENSION, St. George: UTRC03088, minor, term to 2022-07-05
- 29 BOULDERS, St. George: UTRH03475, minor, term to 2022-07-26
- 30 GRAND HEIGHTS, St. George: UTRH03266, minor, term to 2022-06-17
- 34 WESTGATE HILLS, Washington: UTRH05029, minor, term to 2023-04-10
- 3430 E/EZRA LN IMPROVMENTS, St. George: UTRL00727
What stands out
- Its term runs 364 days, October 28, 2024 to October 27, 2025; the term ended 323 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to September 15, 2026.
- It is one of 17,184 discharge permits on the register in Utah; 14,166 of them (82%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | FINLEY FARMS PHASE 3 |
|---|---|
| Permittee | Richmond American Homes of Utah, Inc. |
| NPDES ID | UTRC09795 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | October 28, 2024 |
| Expires | October 27, 2025 |
| Agency | UTDEQ |
| Address | Washington, UT 84780 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Middleton Wash-Virgin River (HUC 150100080910) |
NPDES UTRC09795: effluent limits and exceedances
FINLEY FARMS PHASE 3 (NPDES UTRC09795): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES UTRC09795: no pollutant row on file.
NPDES UTRC09795: inspections, violations and enforcement
NPDES UTRC09795 (FINLEY FARMS PHASE 3): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES UTRC09795
NPDES UTRC09795: one email when its EPA record changes — $99/month.
Permits near NPDES UTRC09795
NPDES UTRC09795: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.