NPDES UTRC09795 · Clean Water Act

FINLEY FARMS PHASE 3, Washington, UT: NPDES UTRC09795 discharge permit, effluent exceedances, inspections, penalties

FINLEY FARMS PHASE 3, Washington, Utah: General permit coverage UTRC09795, held by Richmond American Homes of Utah, Inc.; Construction stormwater; Administratively continued; issued October 28, 2024, term to October 27, 2025, by UTDEQ.

Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 7,980 were issued before UTRC09795. Richmond American Homes of Utah, Inc. holds 13 permits in Utah.

Other permits held by Richmond American Homes of Utah, Inc.

Coverages issued nearest UTRC09795

FINLEY FARMS PHASE 3 among its neighbors

636 discharge permits are in the Middleton Wash-Virgin River subwatershed (HUC 150100080910); UTRC09795 is one.

Other permits in the Middleton Wash-Virgin River subwatershed (HUC 150100080910)

What stands out

  • Its term runs 364 days, October 28, 2024 to October 27, 2025; the term ended 323 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
  • No dated event in the 365 days to September 15, 2026.
  • It is one of 17,184 discharge permits on the register in Utah; 14,166 of them (82%) are in its program, Construction stormwater, and it is a minor discharger.

Identity

FacilityFINLEY FARMS PHASE 3
PermitteeRichmond American Homes of Utah, Inc.
NPDES IDUTRC09795
StatusAdministratively continued
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramConstruction stormwater
IssuedOctober 28, 2024
ExpiresOctober 27, 2025
AgencyUTDEQ
AddressWashington, UT 84780
Receiving water impaired303(D) Listed
SubwatershedMiddleton Wash-Virgin River (HUC 150100080910)

NPDES UTRC09795: effluent limits and exceedances

FINLEY FARMS PHASE 3 (NPDES UTRC09795): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.

NPDES UTRC09795: no pollutant row on file.

NPDES UTRC09795: inspections, violations and enforcement

NPDES UTRC09795 (FINLEY FARMS PHASE 3): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.

Watch NPDES UTRC09795

NPDES UTRC09795: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES UTRC09795

NPDES UTRC09795: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.