NPDES UTRC10128 · Clean Water Act
ASCESA COURT, St. George, UT: NPDES UTRC10128 discharge permit, effluent exceedances, inspections, penalties
ASCESA COURT, St. George, Utah: General permit coverage UTRC10128, held by Brix Construction; Construction stormwater; Administratively continued; issued January 14, 2025, term to January 13, 2026, by UTDEQ.
Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 8,378 were issued before UTRC10128. Brix Construction holds 5 permits in Utah.
Other permits held by Brix Construction
- PROMINENCE POINT, North Ogden: UTRC06308, issued 2025-03-27
- ASCESA COURT BUILDING #8, St. George: UTRC07181, issued 2023-07-05
- TOOELE FIRE STATION, Stockton: UTRC07768, issued 2023-10-18
- RIDER'S STATION, Saratoga Springs: UTRC11978, issued 2025-12-01
Coverages issued nearest UTRC10128
- 2025-01-14: CASCATA AT DIVARIO, St. George: UTRC02091, held by S & S Construction
- 2025-01-14: HARRISBURG COUNTRY ESTATES PHASE 7, Clinton: UTRC04211, held by Craythorne Inc
- 2025-01-14: SMITHFIELD CULTIVATION LEVELING, Smithfield: UTRC06225, held by Shawn Cronquist
- 2025-01-14: VINEYARD BLOCK 5 & 6, Vineyard: UTRC08039, held by Rimrock Construction
- 2025-01-14: TRAIL RIDGE SUBDIVISION, Coalville: UTRC08195, held by Tycon Construction LLC
- 2025-01-14: NORTHROP GRUMMAN, Magna: UTRC10132, held by Trent Dantz
- 2025-01-14: HERRIMAN OLD TOWN WATERLINE, Herriman: UTRC10133, held by Tempest Enterprises
- 2025-01-14: SIENNA PARK CONDOS, St. George: UTRC10134, held by Zela Construction
- 2025-01-14: WEST VALLEY CITY INDUSTRIAL - PHASE 1, West Valley City: UTRC10135, held by Big-D Construction
- 2025-01-14: BYERS RESIDENCE, St. George: UTRH01971, held by Greg Byers
ASCESA COURT among its neighbors
115 discharge permits are in the Cove Wash-Santa Clara River subwatershed (HUC 150100080809); UTRC10128 is one.
Other permits in the Cove Wash-Santa Clara River subwatershed (HUC 150100080809)
- 1240 VALLEY PARK DR, Santa Clara: UTRH10728, minor, term to 2026-12-07
- 698 ST GEORGE, St. George: UTRC04863, minor, term to 2023-04-18
- 7 BREW ST. GEORGE (SUNSET), St. George: UTRC12985, minor, term to 2027-06-14
- ASCESA, St. George: UTRC07298, minor, term to 2024-07-24
- ASCESA AT DIVARIO, St. George: UTRC04973, minor, term to 2023-05-03
- ASCESA COURT BUILDING #8, St. George: UTRC07181, minor, term to 2024-07-04
- BECCO CREEK, St. George: UTRC06814, minor, term to 2026-05-02
- BEEBE SOUTHGATE HILLS DR, St. George: UTRH00945, minor, term to 2021-08-03
- BLACK HILL TRAIL, St. George: UTRL00600
- BLACK RIDGE COVE, St. George: UTRC03943, minor, term to 2024-12-02
What stands out
- Its term runs 364 days, January 14, 2025 to January 13, 2026; the term ended 245 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to September 15, 2026.
- It is one of 17,184 discharge permits on the register in Utah; 14,166 of them (82%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | ASCESA COURT |
|---|---|
| Permittee | Brix Construction |
| NPDES ID | UTRC10128 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | January 14, 2025 |
| Expires | January 13, 2026 |
| Agency | UTDEQ |
| Address | St. George, UT 84770 |
| Subwatershed | Cove Wash-Santa Clara River (HUC 150100080809) |
NPDES UTRC10128: effluent limits and exceedances
ASCESA COURT (NPDES UTRC10128): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES UTRC10128: no pollutant row on file.
NPDES UTRC10128: inspections, violations and enforcement
NPDES UTRC10128 (ASCESA COURT): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES UTRC10128
NPDES UTRC10128: one email when its EPA record changes — $99/month.
Permits near NPDES UTRC10128
NPDES UTRC10128: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.