NPDES UTRC10430 · Clean Water Act
AMERICAN FORK IHP, Salt Lake City, UT: NPDES UTRC10430 discharge permit, effluent exceedances, inspections, penalties
AMERICAN FORK IHP, Salt Lake City, Utah: General permit coverage UTRC10430, held by Questar Gas Company dba Enbridge Gas Utah; Construction stormwater; Administratively continued; issued March 7, 2025, term to March 6, 2026, by UTDEQ.
Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 8,772 were issued before UTRC10430. Questar Gas Company dba Enbridge Gas Utah holds 31 permits in Utah.
Other permits held by Questar Gas Company dba Enbridge Gas Utah
- 86865.23 FL 34 PIPELINE PROJECT, West Jordan: UTRC06300, issued 2025-01-09
- TOQUERVILLE IHP, Toquerville: UTRC07678, issued 2023-10-03
- SANTAQUIN MAIN STREET IHP REPLACEMENT, Santaquin: UTRC07754, issued 2023-10-16
- FL 34 PHASE 2A AND 2B, Salt Lake City: UTRC07868, issued 2024-10-21
- GENOLA IHP EXPANSION, Genola: UTRC08008, issued 2024-11-19
- 94852.85 FL22 RELOCATE 2600FT OF 20-IN HP, Roy: UTRC08189, issued 2024-01-22
- FL 148 REPLACEMENT PROJECT, North Salt Lake: UTRC08246, issued 2025-01-13
- FL007 PIPELINE RELOCATION PROJECT, Draper: UTRC08250, issued 2024-02-02
- FL052-ARCHEA ENERGY, Grantsville: UTRC08682, issued 2024-04-22
- VIVIAN ESTATES FL026 REPLACEMENT, Lehi: UTRC08831, issued 2025-05-06
Coverages issued nearest UTRC10430
- 2025-03-06: EL DORADO, Payson: UTRH09333, held by Praus, LLC
- 2025-03-07: HIDDEN VILLAGE PHASE 3, South Jordan: UTRC04771, held by CSM Construction Inc
- 2025-03-07: BASE45, Holladay: UTRC08406, held by J Fisher Companies
- 2025-03-07: 2122 BUILDING, Magna: UTRC08441, held by Holmes & Roberts Inc
- 2025-03-07: ALPINE AQUEDUCT REACH 1, Orem: UTRC10428, held by WW Clyde & Co
- 2025-03-07: SOUTH JORDAN RETAIL BUILDING, South Jordan: UTRC10433, held by K Barr Co.
- 2025-03-07: SHEERAN HOME, St. George: UTRH09337, held by Todd Sheeran
- 2025-03-10: SMITHFIELD UTAH TEMPLE, Smithfield: UTRC04736, held by Jacobsen Construction
- 2025-03-10: CLYDE REC CENTER PICKLEBALL COURT EXPANSION, Springville: UTRC10435, held by PCE - Pickleball Court Experts
- 2025-03-10: MEADOWS AT HYDE PARK, Hyde Park: UTRC10438, held by Champlin Homes
AMERICAN FORK IHP among its neighbors
332 discharge permits are in the Lower American Fork Canyon-Frontal Utah Lake subwatershed (HUC 160202010803); UTRC10430 is one.
Other permits in the Lower American Fork Canyon-Frontal Utah Lake subwatershed (HUC 160202010803)
- &00 N. WAREHOUSE, Lindon: UTR394939, minor, term to 2021-07-19
- 1273 N 380 E, Pleasant Grove: UTRH09742, minor, term to 2026-05-18
- 1299N. 380E. PLEASANT GROVE, Pleasant Grove: UTRH08257, minor, term to 2025-07-01
- 132 S, Pleasant Grove: UTRL00736
- 175 N 800 W LINDON, Lindon: UTRH04238, minor, term to 2022-11-16
- 1758 N 320 E PLEASANT GROVE, Pleasant Grove: UTRH00762, minor, term to 2021-07-07
- 190 E, Pleasant Grove: UTRL00735
- 304 N. 100 E. PLEASANT GROVE, UT. 84062, Pleasant Grove: UTRH01374, minor, term to 2021-09-24
- 36 CULINARY WATER LINE REPLACEMENT PROJECT, American Fork: UTRH01789, minor, term to 2021-11-24
- 43 NORTH APARTMENTS, American Fork: UTRC06632, minor, term to 2025-03-29
What stands out
- Its term runs 364 days, March 7, 2025 to March 6, 2026; the term ended 193 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to September 15, 2026.
- It is one of 17,184 discharge permits on the register in Utah; 14,166 of them (82%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | AMERICAN FORK IHP |
|---|---|
| Permittee | Questar Gas Company dba Enbridge Gas Utah |
| NPDES ID | UTRC10430 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | March 7, 2025 |
| Expires | March 6, 2026 |
| Agency | UTDEQ |
| Address | Salt Lake City, UT 84145 |
| Subwatershed | Lower American Fork Canyon-Frontal Utah Lake (HUC 160202010803) |
NPDES UTRC10430: effluent limits and exceedances
AMERICAN FORK IHP (NPDES UTRC10430): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES UTRC10430: no pollutant row on file.
NPDES UTRC10430: inspections, violations and enforcement
NPDES UTRC10430 (AMERICAN FORK IHP): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES UTRC10430
NPDES UTRC10430: one email when its EPA record changes — $99/month.
Permits near NPDES UTRC10430
NPDES UTRC10430: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.