NPDES UTRC10799 · Clean Water Act
TCSSD WATER SYSTEM IMPROVEMENT PROJECT PHASE 2, Heber City, UT: NPDES UTRC10799 discharge permit, effluent exceedances, inspections, penalties
TCSSD WATER SYSTEM IMPROVEMENT PROJECT PHASE 2, Heber City, Utah: General permit coverage UTRC10799, held by K. W. Robinson Construction, Inc.; Construction stormwater; Administratively continued; issued May 1, 2025, term to April 30, 2026, by UTDEQ.
- October 27, 2026: Reconnaissance without Sampling (S).
Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 9,218 were issued before UTRC10799. K. W. Robinson Construction, Inc. holds 3 permits in Utah.
Other permits held by K. W. Robinson Construction, Inc.
- 2024 HANNA WATER SYSTEM EXPANSION PROJECT - PHASE 1 AND 2, Tabiona: UTRC09990, issued 2024-12-06
- 2024 HANNA WATER SYSTEM EXPANSION PROJECT - PHASE 1 AND 2, Tabiona: UTRC11856, issued 2025-10-28
Coverages issued nearest UTRC10799
- 2025-05-01: SKIP DUNN INVESTMENTS LOT 6, Lindon: UTRC06967, held by Skip Dunn Investments
- 2025-05-01: ANTHEM COMMERCIAL 11TH PHASE IMPROVEMENTS, Herriman: UTRC08435, held by Noland and Son Construction
- 2025-05-01: L2 MANUFACTURING, St. George: UTRC08554, held by B Baker Enterprises LLC
- 2025-05-01: SIENA HEIGHTS, Pleasant Grove: UTRC08924, held by Castlewood Siena Heights LLC
- 2025-05-01: BONEYARD ROAD, Bluffdale: UTRC10711, held by Miles McCoy-Sulentic
- 2025-05-01: TOLL BROTHERS AT ELK RIDGE, Elk Ridge: UTRC10800, held by Toll Brothers
- 2025-05-01: KALEB CHEEK AND LAUREN BLAIR RESIDENCE, Mapleton: UTRH09647, held by Blair Construction and Design
- 2025-05-01: JACE ANDERSON RESIDENCE, Orem: UTRH09650, held by Artisan Construction LLC
- 2025-05-01: SAYLIN RES, North Salt Lake: UTRH09651, held by Beard Construction
- 2025-05-01: 95 HART, Farr West: UTRH09652, held by Gray Stone Development Inc
TCSSD WATER SYSTEM IMPROVEMENT PROJECT PHASE 2 among its neighbors
28 discharge permits are in the Lake Creek subwatershed (HUC 160202030302); UTRC10799 is one.
Other permits in the Lake Creek subwatershed (HUC 160202030302)
- CASSITY RESIDENCE, Heber City: UTRC08985, minor, term to 2025-06-09
- CLYDE ARENA, Heber City: UTRC10304, minor, term to 2026-02-15
- CLYDE SUBDIVISION, Heber City: UTRL00617
- CLYDE SUBDIVISION, Heber City: UTRL00700
- CLYDESEWER, Heber City: UTRL00397
- COOK RESIDENCE, Heber City: UTRH06449, minor, term to 2024-04-04
- COOK RESIDENCE, Heber City: UTRH08350, minor, term to 2025-07-24
- CROSSINGS AT LAKE CREEK, Heber City: UTRC00697, minor, term to 2021-06-22
- FLOOD RESIDENCE, Heber City: UTRC07662, minor, term to 2024-09-27
- HEBER CITY WATER/SEWER REPLACEMENT PROGRAM, Heber City: UTG071530, minor, term to 2023-07-06
What stands out
- Its term runs 364 days, May 1, 2025 to April 30, 2026; the term ended 167 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as administratively continued.
- Its newest dated event on file is an inspection on October 27, 2026.
- No dated event in the 365 days to October 14, 2026.
- EPA's file dates 1 event for it, all in 2026.
- It is one of 17,184 discharge permits on the register in Utah; 14,166 of them (82%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | TCSSD WATER SYSTEM IMPROVEMENT PROJECT PHASE 2 |
|---|---|
| Permittee | K. W. Robinson Construction, Inc. |
| NPDES ID | UTRC10799 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | May 1, 2025 |
| Expires | April 30, 2026 |
| Agency | UTDEQ |
| Address | Heber City, UT 84032 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Lake Creek (HUC 160202030302) |
NPDES UTRC10799: effluent limits and exceedances
TCSSD WATER SYSTEM IMPROVEMENT PROJECT PHASE 2 (NPDES UTRC10799): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES UTRC10799: no pollutant row on file.
NPDES UTRC10799: inspections, violations and enforcement
NPDES UTRC10799: 1 inspection
| Date | What EPA recorded | Agency |
|---|---|---|
| October 27, 2026 | Reconnaissance without Sampling | S |
NPDES UTRC10799 (TCSSD WATER SYSTEM IMPROVEMENT PROJECT PHASE 2): no single-event violation, formal enforcement action and informal enforcement action on file.
Watch NPDES UTRC10799
NPDES UTRC10799: one email when its EPA record changes — $99/month.
Permits near NPDES UTRC10799
NPDES UTRC10799: 0 pollutant rows, 1 dated events; ICIS-NPDES download, loaded October 14, 2026.