Velarion Records
Free: one email when NPDES UTRC11625 changes. Unsubscribe any time.

NPDES UTRC11625 · Clean Water Act

HIDDEN LANDING PHASE 1, Saratoga Springs, UT: NPDES UTRC11625 discharge permit, effluent exceedances, inspections, penalties

HIDDEN LANDING PHASE 1, Saratoga Springs, Utah: General permit coverage UTRC11625, held by Blackbird Excavation; Construction stormwater; Effective; issued September 18, 2025, term to September 17, 2026, by UTDEQ.

Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 10,481 were issued before UTRC11625. Blackbird Excavation holds 2 permits in Utah.

Other permits held by Blackbird Excavation

Coverages issued nearest UTRC11625

HIDDEN LANDING PHASE 1 among its neighbors

588 discharge permits are in the Outlet Dry Creek-Jordan River subwatershed (HUC 160202011002); UTRC11625 is one.

Other permits in the Outlet Dry Creek-Jordan River subwatershed (HUC 160202011002)

Identity

FacilityHIDDEN LANDING PHASE 1
PermitteeBlackbird Excavation
NPDES IDUTRC11625
StatusEffective
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramConstruction stormwater
IssuedSeptember 18, 2025
ExpiresSeptember 17, 2026
AgencyUTDEQ
AddressSaratoga Springs, UT 84045
SubwatershedOutlet Dry Creek-Jordan River (HUC 160202011002)

NPDES UTRC11625: effluent limits and exceedances

HIDDEN LANDING PHASE 1 (NPDES UTRC11625): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.

NPDES UTRC11625: no pollutant row on file.

NPDES UTRC11625: inspections, violations and enforcement

NPDES UTRC11625 (HIDDEN LANDING PHASE 1): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.

Watch NPDES UTRC11625

NPDES UTRC11625: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES UTRC11625

NPDES UTRC11625: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.