Clean Water Act discharge permit · NPDES UTRC11689

BFP: SALT LAKE CITY BRIDGE REPLACEMENTS (2) - 200 S, Salt Lake City, UT: NPDES UTRC11689 discharge permit, effluent exceedances, inspections, penalties

BFP: SALT LAKE CITY BRIDGE REPLACEMENTS (2) - 200 S, held by Wadsworth Brothers Construction, holds NPDES permit UTRC11689. EPA’s file records it issued September 30, 2025 and expiring September 29, 2026. The status and dates are as EPA’s permit file stood when Velarion loaded it (September 15, 2026); EPA’s free Detailed Facility Report on ECHO carries the permit’s current standing.

What the register holds for BFP: SALT LAKE CITY BRIDGE REPLACEMENTS (2) - 200 S: its NPDES ID, its permit type and status, its dates, its address in Salt Lake City, Utah. EPA’s effluent violation file and its single-event violation file hold no violation for NPDES UTRC11689.

What stands out

  • Its term runs 364 days, September 30, 2025 to September 29, 2026.
  • No dated event in the 365 days to September 15, 2026.
  • It is one of 17,184 discharge permits on the register in Utah; 14,166 of them (82%) are in its program, Construction stormwater, and it is a minor discharger.

Identity

Facility as filedBFP: SALT LAKE CITY BRIDGE REPLACEMENTS (2) - 200 S
Permittee as filedWadsworth Brothers Construction
NPDES IDUTRC11689
Permit statusEffective
Permit typeCoverage under a general permit
Discharger classMinor discharger
Facility typeNot a publicly owned treatment works
ProgramConstruction stormwater
IssuedSeptember 30, 2025
Expiration dateSeptember 29, 2026
Issuing agencyUTDEQ
AddressSalt Lake City, UT 84102
Receiving water impaired303(D) Listed
SubwatershedOutlet Jordan River-Frontal Great Salt Lake (HUC 160202040405)

Cited to the EPA ICIS-NPDES permit file (ECHO download).

Effluent limits and exceedances

EPA’s limits and effluent violation files hold no pollutant row for NPDES UTRC11689.

Cited to the EPA ICIS-NPDES limits and effluent violations files (ECHO download); up to 60 rows shown, most exceedances first.

Inspections, violations and enforcement

EPA’s single-event violation file, as loaded, holds no violation for NPDES UTRC11689.

Inspections

EPA’s inspection file holds no inspection for NPDES UTRC11689.

Formal enforcement and penalties

0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.

Informal enforcement

EPA’s informal enforcement file holds no action for NPDES UTRC11689.

Cited to the EPA ICIS-NPDES violation, inspection and enforcement files (ECHO download); up to 50 rows of each shown, newest first.

Watch this permit

One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, UTRC11689.

Start the watch

How often?
  • One permit holder — $99/month
  • One watershed — $2,990/year
  • One state — $4,990/year
  • The whole register — $18,000/year

How we handle your data → Privacy

EPA publishes a free Detailed Facility Report for every permit on ECHO: its compliance status quarter by quarter, its inspections, and its enforcement actions and penalties. EPA also sends free notices of new inspections and enforcement actions through ECHO Notify; enter NPDES ID UTRC11689 there.

BFP: SALT LAKE CITY BRIDGE REPLACEMENTS (2) - 200 S, Salt Lake City, Utah: Coverage under a general permit UTRC11689, held by Wadsworth Brothers Construction; Construction stormwater; Effective; issued September 30, 2025, term to September 29, 2026, by UTDEQ.

Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 10,576 were issued before UTRC11689. Wadsworth Brothers Construction holds 21 permits in Utah.

Other permits held by Wadsworth Brothers Construction

Coverages issued nearest UTRC11689

BFP: SALT LAKE CITY BRIDGE REPLACEMENTS (2) - 200 S among its neighbors

465 discharge permits are in the Outlet Jordan River-Frontal Great Salt Lake subwatershed (HUC 160202040405); UTRC11689 is one.

Other permits in the Outlet Jordan River-Frontal Great Salt Lake subwatershed (HUC 160202040405)

Nearby on the register

Figures from EPA’s ICIS-NPDES download, loaded September 15, 2026.

What this page shows

Among 572 storm water construction permits in Salt Lake City, 0.0% carry a violation on file. The Outlet Jordan River-Frontal Great Salt Lake subwatershed (HUC 160202040405) holds 464 NPDES permits, BFP: SALT LAKE CITY BRIDGE REPLACEMENTS (2) - 200 S among them, and 82.8% of the 541 storm water construction permits in the city, counting this permit, were issued before it.