Clean Water Act discharge permit · NPDES UTRC11780
ROCKY POINT ESTATES SUBDIVISION PHASE 2, Gunnison, UT: NPDES UTRC11780 discharge permit, effluent exceedances, inspections, penalties
- EffectivePermit status
- MinorDischarger class
- 0Pollutants under a numeric limit
- 0Pollutants with an effluent exceedance
- 1Inspections on file
- 0Formal enforcement actions
ROCKY POINT ESTATES SUBDIVISION PHASE 2, held by JL Construction, holds NPDES permit UTRC11780. EPA’s file records it issued October 16, 2025 and expiring October 15, 2026. The status and dates are as EPA’s permit file stood when Velarion loaded it (September 15, 2026); EPA’s free Detailed Facility Report on ECHO carries the permit’s current standing.
What stands out
- Its term runs 364 days, October 16, 2025 to October 15, 2026.
- Its newest dated event on file is an inspection on March 17, 2026, 182 days before EPA's file was loaded.
- In the 365 days to September 15, 2026, it was dated 1 inspection.
- EPA's file dates 1 event for it, all in 2026.
- It is one of 17,184 discharge permits on the register in Utah; 14,166 of them (82%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility as filed | ROCKY POINT ESTATES SUBDIVISION PHASE 2 |
|---|---|
| Permittee as filed | JL Construction |
| NPDES ID | UTRC11780 |
| Permit status | Effective |
| Permit type | Coverage under a general permit |
| Discharger class | Minor discharger |
| Facility type | Not a publicly owned treatment works |
| Program | Construction stormwater |
| Issued | October 16, 2025 |
| Expiration date | October 15, 2026 |
| Issuing agency | UTDEQ |
| Address | Gunnison, UT 84634 |
| Subwatershed | Outlet San Pitch River (HUC 160300040505) |
Cited to the EPA ICIS-NPDES permit file (ECHO download).
Effluent limits and exceedances
- 0Pollutants on file
- 0Under a numeric limit
- 0With a violation of any kind
- 0With an effluent exceedance
EPA’s limits and effluent violation files hold no pollutant row for NPDES UTRC11780.
Cited to the EPA ICIS-NPDES limits and effluent violations files (ECHO download); up to 60 rows shown, most exceedances first.
Inspections, violations and enforcement
- 0Single-event violations
EPA’s single-event violation file, as loaded, holds no violation for NPDES UTRC11780.
Inspections
| Date | What EPA recorded | Agency |
|---|---|---|
| March 17, 2026 | Evaluation | S |
Formal enforcement and penalties
0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.
Informal enforcement
EPA’s informal enforcement file holds no action for NPDES UTRC11780.
Cited to the EPA ICIS-NPDES violation, inspection and enforcement files (ECHO download); up to 50 rows of each shown, newest first.
Watch this permit
One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, UTRC11780.
Start the watch
- One permit holder — $99/month
- One watershed — $2,990/year
- One state — $4,990/year
- The whole register — $18,000/year
How we handle your data → Privacy
EPA publishes a free Detailed Facility Report for every permit on ECHO: its compliance status quarter by quarter, its inspections, and its enforcement actions and penalties. EPA also sends free notices of new inspections and enforcement actions through ECHO Notify; enter NPDES ID UTRC11780 there.
ROCKY POINT ESTATES SUBDIVISION PHASE 2, Gunnison, Utah: Coverage under a general permit UTRC11780, held by JL Construction; Construction stormwater; Effective; issued October 16, 2025, term to October 15, 2026, by UTDEQ.
- March 17, 2026: Evaluation (S).
Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 10,711 were issued before UTRC11780.
Coverages issued nearest UTRC11780
- 2025-10-15: ST-1-2, Woodland: UTRH10493, held by Roderick Builders
- 2025-10-15: RESERVES AT OLD FARM #23, Washington: UTRH10494, held by Modern Edge Design + Build
- 2025-10-15: NEPHI, Nephi: UTRH10495, held by Kelly Staheli
- 2025-10-16: WEST HIGH SCHOOL, Salt Lake City: UTRC11773, held by Hughes General Contractors
- 2025-10-16: PRINCE RESIDENCE, Fruit Heights: UTRC11779, held by RW Custom
- 2025-10-16: PROVO RIVER BRIDGE AND TRAIL AT 820 NORTH, Provo: UTRC11781, held by Wadsworth Brothers Construction
- 2025-10-16: CALVARY CHAPEL, Hurricane: UTRC11782, held by Chapman Construction
- 2025-10-16: PETERSON RESIDENCE, Providence: UTRC11783, held by Spencer Johnson
- 2025-10-16: NORTH POINT INNOVATION PARK BY OCC INDUSTRIAL, Salt Lake City: UTRC11784, held by OCC Industrial
- 2025-10-16: 681 SLANT, Mapleton: UTRC11786, held by Tylek Bradley
ROCKY POINT ESTATES SUBDIVISION PHASE 2 among its neighbors
5 discharge permits are in the Outlet San Pitch River subwatershed (HUC 160300040505); UTRC11780 is one.
Other permits in the Outlet San Pitch River subwatershed (HUC 160300040505)
- 394 GRANITE OAKS, Cottonwood Heights: UTRH03819, minor, term to 2022-09-08
- ACT GUNNISON SOLAR, Gunnison: UTRC00236, minor, term to 2021-03-31
- CSS FUTURE COMP BUILDING, Gunnison: UTRC02079, minor, term to 2022-02-09
- GUNNISON VALLEY HOSPITAL EXPANSION, Gunnison: UTRC13177, minor, term to 2027-07-08
Nearby on the register
- Discharge permits in Gunnison
- Every permit record in Gunnison, A to Z
- Discharge permits in Utah
- Every permit record in Utah, A to Z
Figures from EPA’s ICIS-NPDES download, loaded September 15, 2026.
What this page shows
Gunnison has 4 storm water construction permits on EPA's NPDES register, including ROCKY POINT ESTATES SUBDIVISION PHASE 2. The Outlet San Pitch River subwatershed contains 5 NPDES permits, including this permit.