Velarion Records
Free: one email when NPDES UTRC11829 changes. Unsubscribe any time.

NPDES UTRC11829 · Clean Water Act

SCANNELL LOGISTICS CENTER PHASE 2, Salt Lake City, UT: NPDES UTRC11829 discharge permit, effluent exceedances, inspections, penalties

SCANNELL LOGISTICS CENTER PHASE 2, Salt Lake City, Utah: General permit coverage UTRC11829, held by Suncore Construction and Materials Inc.; Construction stormwater; Effective; issued October 23, 2025, term to October 22, 2026, by UTDEQ.

Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 10,774 were issued before UTRC11829. Suncore Construction and Materials Inc. holds 2 permits in Utah.

Other permits held by Suncore Construction and Materials Inc.

Coverages issued nearest UTRC11829

  • 2025-10-22: ASPEN RIDGES NORTH, Tremonton: UTRC11825, held by Dominique Rogers
  • 2025-10-22: ARROWHEAD, Ivins: UTRH10526, held by Bedrock Homes LLC
  • 2025-10-22: ZURITA'S HOME, Highland: UTRH10528, held by Edgar Zurita
  • 2025-10-22: BRASHER HOME, Heber City: UTRH10529, held by Timberline Construction
  • 2025-10-23: HWID PROJECT 194, West Point: UTRC11826, held by RJT Excavating
  • 2025-10-23: JR 84, Hyde Park: UTRC11830, held by Brio Home Builders
  • 2025-10-23: BECK'S LANDING, Lehi: UTRC11831, held by Home Sweet Home by Mitch
  • 2025-10-23: WINDSOR MILL, Draper: UTRC11832, held by Hygge Construction
  • 2025-10-23: BIELAS RESIDENCE LOT 49R, Eden: UTRH10531, held by PureHaven Homes
  • 2025-10-23: ALCIBIADES HOME, Saratoga Springs: UTRH10532, held by Geronimo Alcibiades Zurita-Ponce

SCANNELL LOGISTICS CENTER PHASE 2 among its neighbors

186 discharge permits are in the Crystal Creek-Frontal Great Salt Lake subwatershed (HUC 160202040404); UTRC11829 is one.

Other permits in the Crystal Creek-Frontal Great Salt Lake subwatershed (HUC 160202040404)

What stands out

  • Its term runs 364 days, October 23, 2025 to October 22, 2026.
  • No dated event in the 365 days to October 14, 2026.
  • It is one of 17,184 discharge permits on the register in Utah; 14,166 of them (82%) are in its program, Construction stormwater, and it is a minor discharger.

Identity

FacilitySCANNELL LOGISTICS CENTER PHASE 2
PermitteeSuncore Construction and Materials Inc.
NPDES IDUTRC11829
StatusEffective
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramConstruction stormwater
IssuedOctober 23, 2025
ExpiresOctober 22, 2026
AgencyUTDEQ
AddressSalt Lake City, UT 84116
SubwatershedCrystal Creek-Frontal Great Salt Lake (HUC 160202040404)

NPDES UTRC11829: effluent limits and exceedances

SCANNELL LOGISTICS CENTER PHASE 2 (NPDES UTRC11829): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.

NPDES UTRC11829: no pollutant row on file.

NPDES UTRC11829: inspections, violations and enforcement

NPDES UTRC11829 (SCANNELL LOGISTICS CENTER PHASE 2): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.

Watch NPDES UTRC11829

NPDES UTRC11829: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES UTRC11829

NPDES UTRC11829: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.