NPDES UTRC11938 · Clean Water Act
COVE JUNCTION PHASE II, Richfield, UT: NPDES UTRC11938 discharge permit, effluent exceedances, inspections, penalties
COVE JUNCTION PHASE II, Richfield, Utah: General permit coverage UTRC11938, held by Classic Jack Construction; Construction stormwater; Effective; issued November 18, 2025, term to November 17, 2026, by UTDEQ.
Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 10,943 were issued before UTRC11938. Classic Jack Construction holds 4 permits in Utah.
Other permits held by Classic Jack Construction
- SUNRISE RANCH, Mapleton: UTRC10101, issued 2025-01-07
- CLEMENTS, Birdseye: UTRH08239, issued 2024-06-26
- THE HOLLOWS 44, Highland: UTRH08746, issued 2024-10-14
Coverages issued nearest UTRC11938
- 2025-11-17: FINLEY FARMS LOT 116, Washington: UTRH10645, held by Seabright Homes, LLC
- 2025-11-17: FUNK/DAVIES RESIDENCE, Farmington: UTRH10647, held by Havenhill Homes, LLC
- 2025-11-17: CAVINESS RESIDENCE, Sandy: UTRH10649, held by Havenhil Homes, LLC
- 2025-11-18: LANDMARK EXCAVATING ST. GEORGE, St. George: UTRC11936, held by Landmark Excavating
- 2025-11-18: THE POINT TANK, Draper: UTRC11937, held by FX Construction
- 2025-11-18: HIDEOUT LOT 12, Hideout: UTRC11939, held by Knowlton General
- 2025-11-18: PARCEL T-11-B TOQUERVILLE, Toquerville: UTRC11940, held by Grass Creek Construction
- 2025-11-18: BELMONT EAST, Orem: UTRC11941, held by SMM Excavation
- 2025-11-18: BELMONT WEST, Orem: UTRC11942, held by SMM Excavation
- 2025-11-18: KIOWA COURT, West Valley City: UTRC11943, held by Alpine Homes LLC
COVE JUNCTION PHASE II among its neighbors
27 discharge permits are in the Maple Creek-Sevier River subwatershed (HUC 160300030309); UTRC11938 is one.
Other permits in the Maple Creek-Sevier River subwatershed (HUC 160300030309)
- ALLEN COMMERCIAL BUILDING, Richfield: UTRC12832, minor, term to 2027-05-13
- COTTONWOOD CORNER SUBDIVISION, Richfield: UTRC10886, minor, term to 2026-05-14
- COVE MOUNTAIN VILLAGE PROJECT, Richfield: UTRC09490, minor, term to 2025-09-05
- CPF WATER IMPROVEMENTS, Richfield: UTRL00685
- CSS COMPOSITES - RICHFIELD, Richfield: UTRC02323, minor, term to 2022-03-14
- FISHLAKE NATIONAL FOREST, Richfield: UTG170081, minor, term to 2016-10-30
- HOLT OIL PRODUCTS CMPANY, Richfield: UTR000456, minor, term to 1998-12-31
- JDE OFFICE EXPANSION, Richfield: UTRC07420, minor, term to 2024-08-15
- NEWBY HOLT OIL CO INC, Richfield: UTR000387, minor, term to 1997-09-30
- OLD DOMINION FREIGHT LINE-RICHFIELD, Richfield: UTNX00141, minor, term to 2023-11-21
What stands out
- Its term runs 364 days, November 18, 2025 to November 17, 2026.
- No dated event in the 365 days to September 15, 2026.
- It is one of 17,184 discharge permits on the register in Utah; 14,166 of them (82%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | COVE JUNCTION PHASE II |
|---|---|
| Permittee | Classic Jack Construction |
| NPDES ID | UTRC11938 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | November 18, 2025 |
| Expires | November 17, 2026 |
| Agency | UTDEQ |
| Address | Richfield, UT 84701 |
| Subwatershed | Maple Creek-Sevier River (HUC 160300030309) |
NPDES UTRC11938: effluent limits and exceedances
COVE JUNCTION PHASE II (NPDES UTRC11938): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES UTRC11938: no pollutant row on file.
NPDES UTRC11938: inspections, violations and enforcement
NPDES UTRC11938 (COVE JUNCTION PHASE II): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES UTRC11938
NPDES UTRC11938: one email when its EPA record changes — $99/month.
Permits near NPDES UTRC11938
NPDES UTRC11938: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.