NPDES UTRC11983 · Clean Water Act
LAKEVIEW PHASE 1, Hurricane, UT: NPDES UTRC11983 discharge permit, effluent exceedances, inspections, penalties
LAKEVIEW PHASE 1, Hurricane, Utah: General permit coverage UTRC11983, held by Quality excavation; Construction stormwater; Effective; issued December 1, 2025, term to November 30, 2026, by UTDEQ.
Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 11,017 were issued before UTRC11983.
Coverages issued nearest UTRC11983
- 2025-11-27: CHAPARRAL HEIGHTS 3, Washington: UTRH10694, held by Willow Home- Colby Dalley
- 2025-11-30: FRANKLIN FIELDS #65, Washington: UTRH10696, held by Jonathan Christensen
- 2025-12-01: RIDER'S STATION, Saratoga Springs: UTRC11978, held by Brix Construction
- 2025-12-01: CULINARY VAULT REPLACEMENT - HILL FIELD VAULT, Clearfield: UTRC11979, held by WW Clyde & Co
- 2025-12-01: ALDORA RIDGE SUBDIVISION BY GREEN HAVEN HOMES, Herriman: UTRC11981, held by Green Haven Homes
- 2025-12-01: WASHINGTON FIELDS MEETINGHOUSE, Washington: UTRC11985, held by Grass Creek Construction
- 2025-12-01: SHS FARMINGTON, Farmington: UTRC11986, held by Zadok construction
- 2025-12-01: SKYRIDGE 204, Heber City: UTRH10697, held by Trek Construction
- 2025-12-01: SKYRIDGE 207, Heber City: UTRH10698, held by Trek Construction
- 2025-12-01: COUNTRY HAVEN LOT 163, Kamas: UTRH10699, held by Green Haven Homes
LAKEVIEW PHASE 1 among its neighbors
85 discharge permits are in the Workman Wash subwatershed (HUC 150100080907); UTRC11983 is one.
Other permits in the Workman Wash subwatershed (HUC 150100080907)
- 105 KNOLLS AT LITTLE VALLEY, St. George: UTRH01968, minor, term to 2022-01-04
- 1355 E PONY WAY WASHINGTON, UT 84780, Washington: UTRH07535, minor, term to 2026-01-31
- ARANCIO POINT, St. George: UTRC03399, minor, term to 2024-08-25
- BALANCE OF NATURE PHASE 1A1 AND 1A2, Hurricane: UTRC08463, minor, term to 2025-03-12
- BUTTERWORTH CUSTOM - VERTICAL, Hurricane: UTRH10788, minor, term to 2027-01-01
- CHACO SOUTH #78, St. George: UTRH07767, minor, term to 2025-03-19
- CLIFF DWELLERS RANCH PHASE 1 LOT 28, Hurricane: UTRC12604, minor, term to 2027-04-08
- COPPER MEADOWS PH 1, Hurricane: UTRC12864, minor, term to 2027-05-19
- COPPER MEADOWS/VISTA - ORCHARDS, Hurricane: UTRC11257, minor, term to 2026-07-14
- COPPER ROCK #5, Hurricane: UTRH03171, minor, term to 2022-06-02
What stands out
- Its term runs 364 days, December 1, 2025 to November 30, 2026.
- No dated event in the 365 days to October 14, 2026.
- It is one of 17,184 discharge permits on the register in Utah; 14,166 of them (82%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | LAKEVIEW PHASE 1 |
|---|---|
| Permittee | Quality excavation |
| NPDES ID | UTRC11983 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | December 1, 2025 |
| Expires | November 30, 2026 |
| Agency | UTDEQ |
| Address | Hurricane, UT 84737 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Workman Wash (HUC 150100080907) |
NPDES UTRC11983: effluent limits and exceedances
LAKEVIEW PHASE 1 (NPDES UTRC11983): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES UTRC11983: no pollutant row on file.
NPDES UTRC11983: inspections, violations and enforcement
NPDES UTRC11983 (LAKEVIEW PHASE 1): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES UTRC11983
NPDES UTRC11983: one email when its EPA record changes — $99/month.
Permits near NPDES UTRC11983
NPDES UTRC11983: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.