NPDES UTRC12009 · Clean Water Act

RIDGELINE PARK PHASE 1, Nibley, UT: NPDES UTRC12009 discharge permit, effluent exceedances, inspections, penalties

RIDGELINE PARK PHASE 1, Nibley, Utah: General permit coverage UTRC12009, held by DWA Construction Inc.; Construction stormwater; Effective; issued December 4, 2025, term to December 3, 2026, by UTDEQ.

  • March 2, 2026: Evaluation (S).

Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 11,054 were issued before UTRC12009. DWA Construction Inc. holds 4 permits in Utah.

Other permits held by DWA Construction Inc.

Coverages issued nearest UTRC12009

RIDGELINE PARK PHASE 1 among its neighbors

72 discharge permits are in the Millville Canyon-Blacksmith Fork subwatershed (HUC 160102030209); UTRC12009 is one.

Other permits in the Millville Canyon-Blacksmith Fork subwatershed (HUC 160102030209)

What stands out

  • Its term runs 364 days, December 4, 2025 to December 3, 2026.
  • Its newest dated event on file is an inspection on March 2, 2026, 197 days before EPA's file was loaded.
  • In the 365 days to September 15, 2026, it was dated 1 inspection.
  • EPA's file dates 1 event for it, all in 2026.
  • It is one of 17,184 discharge permits on the register in Utah; 14,166 of them (82%) are in its program, Construction stormwater, and it is a minor discharger.

Identity

FacilityRIDGELINE PARK PHASE 1
PermitteeDWA Construction Inc.
NPDES IDUTRC12009
StatusEffective
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramConstruction stormwater
IssuedDecember 4, 2025
ExpiresDecember 3, 2026
AgencyUTDEQ
AddressNibley, UT 84321
Receiving water impaired303(D) Listed
SubwatershedMillville Canyon-Blacksmith Fork (HUC 160102030209)

NPDES UTRC12009: effluent limits and exceedances

RIDGELINE PARK PHASE 1 (NPDES UTRC12009): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.

NPDES UTRC12009: no pollutant row on file.

NPDES UTRC12009: inspections, violations and enforcement

NPDES UTRC12009: 1 inspection

DateWhat EPA recordedAgency
March 2, 2026EvaluationS

NPDES UTRC12009 (RIDGELINE PARK PHASE 1): no single-event violation, formal enforcement action and informal enforcement action on file.

Watch NPDES UTRC12009

NPDES UTRC12009: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES UTRC12009

NPDES UTRC12009: 0 pollutant rows, 1 dated events; ICIS-NPDES download, loaded September 15, 2026.