NPDES UTRC12077 · Clean Water Act
425 W FRONTAGE, Springville, UT: NPDES UTRC12077 discharge permit, effluent exceedances, inspections, penalties
425 W FRONTAGE, Springville, Utah: General permit coverage UTRC12077, held by M K Excavating, Inc.; Construction stormwater; Effective; issued December 29, 2025, term to December 28, 2026, by UTDEQ.
Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 11,185 were issued before UTRC12077.
Coverages issued nearest UTRC12077
- 2025-12-24: CANYONS INNOVATION CENTER, Draper: UTRC12087, held by Hughes General Contractors
- 2025-12-26: HERITAGE PARK WAY - VERTICAL, Nibley: UTRC12088, held by Sierra HomeBuilders, LLC
- 2025-12-26: CHRISTENSEN HOME, Fruit Heights: UTRH10779, held by Kastlerock Excavattion
- 2025-12-26: LOFTHOUSE CASITA ADU, Ivins: UTRH10780, held by Matt Lofthouse
- 2025-12-27: ROBB 62 W 1700 S FARMINGTON, Farmington: UTRH10781, held by Dalton Construction Inc.
- 2025-12-29: SUNTRAN FLEET BUILDING, St. George: UTRC12090, held by Bonneville Builders
- 2025-12-29: WEST VILLAGE APARTMENTS, Salt Lake City: UTRC12091, held by Zwick Construction Company
- 2025-12-29: PARCEL #SG-6-2-23-34001, St. George: UTRC12092, held by Jeff Chapman
- 2025-12-30: WEBER INSTITUTE OF RELIGION, Ogden: UTRC12094, held by R&O Construction Company
- 2025-12-30: SNOW CANYON PARKWAY & HAMBLIN PARKWAY ROUNDABOUT, Ivins: UTRC12095, held by Progressive Contracting Inc.
425 W FRONTAGE among its neighbors
130 discharge permits are in the Outlet Hobble Creek subwatershed (HUC 160202020405); UTRC12077 is one.
Other permits in the Outlet Hobble Creek subwatershed (HUC 160202020405)
- 200 NORTH, Springville: UTRH09161, minor, term to 2026-02-02
- 247 NORTH 650 EAST, Springville: UTRH11112, minor, term to 2027-03-10
- 2499 POOL, Springville: UTRL00627
- 288 E CENTER (TRAVELLER), Springville: UTRH05840, minor, term to 2023-09-18
- 499 W STETSON AV SARATOGA SPRINGS, Saratoga Springs: UTRH07177, minor, term to 2024-10-03
- 53 SOUTH 950 EAST, Springville: UTRH06303, minor, term to 2024-02-20
- 8 SPRING CANYON, Springville: UTRH11443, minor, term to 2027-05-20
- 927 WILLOW BROOK, Springville: UTRC11700, minor, term to 2026-09-30
- ALLRED RESIDENCE - CHERRINGTON HEIGHTS LOT 1, Springville: UTRH11824, minor, term to 2027-08-04
- ALPINE SCHOOL DISTRICT NEW ELEMENTARY #101, Saratoga Springs: UTRC00711, minor, term to 2021-06-24
What stands out
- Its term runs 364 days, December 29, 2025 to December 28, 2026.
- No dated event in the 365 days to September 15, 2026.
- It is one of 17,184 discharge permits on the register in Utah; 14,166 of them (82%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | 425 W FRONTAGE |
|---|---|
| Permittee | M K Excavating, Inc. |
| NPDES ID | UTRC12077 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | December 29, 2025 |
| Expires | December 28, 2026 |
| Agency | UTDEQ |
| Address | Springville, UT 84663 |
| Subwatershed | Outlet Hobble Creek (HUC 160202020405) |
NPDES UTRC12077: effluent limits and exceedances
425 W FRONTAGE (NPDES UTRC12077): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES UTRC12077: no pollutant row on file.
NPDES UTRC12077: inspections, violations and enforcement
NPDES UTRC12077 (425 W FRONTAGE): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES UTRC12077
NPDES UTRC12077: one email when its EPA record changes — $99/month.
Permits near NPDES UTRC12077
NPDES UTRC12077: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.