NPDES UTRC12362 · Clean Water Act
9TH INDUSTRIAL, Salt Lake City, UT: NPDES UTRC12362 discharge permit, effluent exceedances, inspections, penalties
9TH INDUSTRIAL, Salt Lake City, Utah: General permit coverage UTRC12362, held by Campbell Construction; Construction stormwater; Effective; issued February 26, 2026, term to February 25, 2027, by UTDEQ.
Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 11,629 were issued before UTRC12362. Campbell Construction holds 3 permits in Utah.
Other permits held by Campbell Construction
- NORTHERN FRONTIER BUSINESS PARK LOT 4, Saratoga Springs: UTRC09336, issued 2024-08-06
- GRANITE FORTRESS LLC - JUAB DATA CENTER, Mona: UTRC12056, issued 2025-12-16
Coverages issued nearest UTRC12362
- 2026-02-25: HURRICANE VIEWS 75A, Hurricane: UTRH11054, held by Sandvik General Contracting
- 2026-02-26: ROCK HOLLOW PH 1-3, Hurricane: UTRC12357, held by Two Rivers GC
- 2026-02-26: IRONTON DEVELOPMENT, Provo: UTRC12358, held by Springville Rising LLC
- 2026-02-26: M722 DEMOLITION, Corinne: UTRC12359, held by Wollam Construction
- 2026-02-26: WINSTON PARK, Ogden: UTRC12360, held by Nilson Homes
- 2026-02-26: AUTUMN RIDGE DENTAL OFFICE, South Jordan: UTRC12363, held by Bangerter Homes LLC
- 2026-02-26: BLACK RIDGE TOWNHOMES, Hurricane: UTRC12365, held by Narwhal Homes
- 2026-02-26: FINLEY FARMS LOT 90, Washington: UTRH11027, held by Finley Farms Woodstock LLC/Novelty Homes
- 2026-02-26: HEIGHTS AT WASHINGTON BENCH LOT 118, Washington: UTRH11055, held by Johnathan Quinton
- 2026-02-26: PEACH SPRINGS #5, Hurricane: UTRH11056, held by Juston Palmer
9TH INDUSTRIAL among its neighbors
465 discharge permits are in the Outlet Jordan River-Frontal Great Salt Lake subwatershed (HUC 160202040405); UTRC12362 is one.
Other permits in the Outlet Jordan River-Frontal Great Salt Lake subwatershed (HUC 160202040405)
- 1100 WEST WATER LINE: 2100 SOUTH TO 2600 SOUTH, Woods Cross: UTRL00668
- 1800 N SEWER REALIGNMENT PHASE 1, Salt Lake City: UTRC04958, minor, term to 2023-05-01
- 1800 N SEWER REALIGNMENT PHASE 2, Salt Lake City: UTRC07580, minor, term to 2024-09-13
- 1800 N SEWER REALIGNMENT PHASE 3, Salt Lake City: UTRC11635, minor, term to 2026-09-21
- 1800 NORTH, Salt Lake City: UTRC05182, minor, term to 2023-06-01
- 1800 NORTH SEWER LINE REHAB PROJECT (SLRP), Salt Lake City: UT0026271, minor, term to 2028-10-31
- 200 NORTH APARTMENTS, Salt Lake City: UTRC04821, minor, term to 2024-04-13
- 200 SOUTH RECONSTRUCTION, PHASE 2, Salt Lake City: UTRC06478, minor, term to 2024-02-29
- 2025 STREET REBUILD PROJECTS, North Salt Lake: UTRL00624
- 2026 STREET REBUILD PROJECTS, North Salt Lake: UTRC12896, minor, term to 2027-05-26
What stands out
- Its term runs 364 days, February 26, 2026 to February 25, 2027.
- No dated event in the 365 days to September 15, 2026.
- It is one of 17,184 discharge permits on the register in Utah; 14,166 of them (82%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | 9TH INDUSTRIAL |
|---|---|
| Permittee | Campbell Construction |
| NPDES ID | UTRC12362 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | February 26, 2026 |
| Expires | February 25, 2027 |
| Agency | UTDEQ |
| Address | Salt Lake City, UT 84104 |
| Subwatershed | Outlet Jordan River-Frontal Great Salt Lake (HUC 160202040405) |
NPDES UTRC12362: effluent limits and exceedances
9TH INDUSTRIAL (NPDES UTRC12362): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES UTRC12362: no pollutant row on file.
NPDES UTRC12362: inspections, violations and enforcement
NPDES UTRC12362 (9TH INDUSTRIAL): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES UTRC12362
NPDES UTRC12362: one email when its EPA record changes — $99/month.
Permits near NPDES UTRC12362
NPDES UTRC12362: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.