NPDES UTRC12571 · Clean Water Act
SLCO DRAIN PUMP, Salt Lake City, UT: NPDES UTRC12571 discharge permit, effluent exceedances, inspections, penalties
SLCO DRAIN PUMP, Salt Lake City, Utah: General permit coverage UTRC12571, held by FX Construction; Construction stormwater; Effective; issued April 2, 2026, term to April 1, 2027, by UTDEQ.
Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 11,980 were issued before UTRC12571. FX Construction holds 12 permits in Utah.
Other permits held by FX Construction
- UVU SEWER LIFT STATION, Heber City: UTG072174, issued 2026-09-01
- EAGLE MOUNTAIN - 4 MG TANK, Eagle Mountain: UTRC06144, issued 2022-12-08
- MAYFLOWER MOUNTAIN RESORT TANKS, Park City: UTRC06196, issued 2022-12-28
- SUMMIT PARK TANK #1, Park City: UTRC06330, issued 2023-02-01
- CAMP WILLIAMS 1MGT, Bluffdale: UTRC07710, issued 2023-10-06
- STATE PARK SEWER LIFT STATION REPLACEMENT, Heber City: UTRC07802, issued 2023-10-26
- MAYFLOWER HAIL PEAK TANK #6, Park City: UTRC10956, issued 2025-05-27
- THE POINT TANK, Draper: UTRC11937, issued 2025-11-18
- HAIL PEAK PUMPSTATION 3, Park City: UTRC12660, issued 2026-04-20
- UVU SEWER LIFT STATION, Heber City: UTRC13489, issued 2026-09-01
Coverages issued nearest UTRC12571
- 2026-04-01: ZION SHORES LOT 31, Washington: UTRH11211, held by Immaculate Homes
- 2026-04-01: MOORLAND PARK 50, St. George: UTRH11212, held by Tim Kenney
- 2026-04-01: ESTATES AT OLD FARM 116, St. George: UTRH11213, held by Tim Kenney
- 2026-04-02: HOMES AT THE KNOLL PHASE II, Providence: UTRC12551, held by Kilgore Companies, LLC dba Kilgore Contracting
- 2026-04-02: PWTP OFFSITE TRANSMISSION, Provo: UTRC12570, held by M&T Enterprises
- 2026-04-02: SHADY CREEK, Mountain Green: UTRC12572, held by Kastlerock excavation
- 2026-04-02: BUDGE RESIDENCE, Providence: UTRC12574, held by Brio Home Builders
- 2026-04-02: MURDOCK PLAN, Salt Lake City: UTRH11214, held by Hyrum Murphy
- 2026-04-02: WOODHAVEN 12, St. George: UTRH11215, held by JW West Homes
- 2026-04-03: DAVIS FARMS SUBDIVISION LOTS 19 & 24, Salem: UTRC12573, held by Arrow Ridge Homes
SLCO DRAIN PUMP among its neighbors
465 discharge permits are in the Outlet Jordan River-Frontal Great Salt Lake subwatershed (HUC 160202040405); UTRC12571 is one.
Other permits in the Outlet Jordan River-Frontal Great Salt Lake subwatershed (HUC 160202040405)
- 1100 WEST WATER LINE: 2100 SOUTH TO 2600 SOUTH, Woods Cross: UTRL00668
- 1800 N SEWER REALIGNMENT PHASE 1, Salt Lake City: UTRC04958, minor, term to 2023-05-01
- 1800 N SEWER REALIGNMENT PHASE 2, Salt Lake City: UTRC07580, minor, term to 2024-09-13
- 1800 N SEWER REALIGNMENT PHASE 3, Salt Lake City: UTRC11635, minor, term to 2026-09-21
- 1800 NORTH, Salt Lake City: UTRC05182, minor, term to 2023-06-01
- 1800 NORTH SEWER LINE REHAB PROJECT (SLRP), Salt Lake City: UT0026271, minor, term to 2028-10-31
- 200 NORTH APARTMENTS, Salt Lake City: UTRC04821, minor, term to 2024-04-13
- 200 SOUTH RECONSTRUCTION, PHASE 2, Salt Lake City: UTRC06478, minor, term to 2024-02-29
- 2025 STREET REBUILD PROJECTS, North Salt Lake: UTRL00624
- 2026 STREET REBUILD PROJECTS, North Salt Lake: UTRC12896, minor, term to 2027-05-26
Identity
| Facility | SLCO DRAIN PUMP |
|---|---|
| Permittee | FX Construction |
| NPDES ID | UTRC12571 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | April 2, 2026 |
| Expires | April 1, 2027 |
| Agency | UTDEQ |
| Address | Salt Lake City, UT 84116 |
| Subwatershed | Outlet Jordan River-Frontal Great Salt Lake (HUC 160202040405) |
NPDES UTRC12571: effluent limits and exceedances
SLCO DRAIN PUMP (NPDES UTRC12571): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES UTRC12571: no pollutant row on file.
NPDES UTRC12571: inspections, violations and enforcement
NPDES UTRC12571 (SLCO DRAIN PUMP): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES UTRC12571
NPDES UTRC12571: one email when its EPA record changes — $99/month.
Permits near NPDES UTRC12571
NPDES UTRC12571: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.