NPDES UTRC13054 · Clean Water Act
SIPPY - RIVERTON, Riverton, UT: NPDES UTRC13054 discharge permit, effluent exceedances, inspections, penalties
SIPPY - RIVERTON, Riverton, Utah: General permit coverage UTRC13054, held by High Pine Construction; Construction stormwater; Effective; issued June 19, 2026, term to June 18, 2027, by UTDEQ.
Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 12,801 were issued before UTRC13054. High Pine Construction holds 2 permits in Utah.
Other permits held by High Pine Construction
- SIPPY’S RIVERTON, Riverton: UTRC07485, issued 2023-08-25
Coverages issued nearest UTRC13054
- 2026-06-18: KOSH RESIDENCE, American Fork: UTRH11592, held by Arcadian Custom Homes
- 2026-06-18: 5448 WAPITI, Eden: UTRH11593, held by Elevation Builders
- 2026-06-18: BARRETT RESIDENCE, Ivins: UTRH11594, held by J2 Construction
- 2026-06-18: WARFEL, Park City: UTRH11595, held by PJ Builders Inc
- 2026-06-18: WESTON JONI HARDY RESIDENCE, Pleasant View: UTRH11596, held by Weston Hardy
- 2026-06-19: HAW-22, Nibley: UTRC13055, held by Kartchner Homes
- 2026-06-19: FIDDLERS PARK, Cedar City: UTRC13056, held by PRT Builders, LLC
- 2026-06-19: HAW-21, Nibley: UTRC13057, held by Kartchner Homes
- 2026-06-19: KERSHAW TILT, Ogden: UTRC13058, held by Wadman Corporation
- 2026-06-19: HARRISVILLE FIELDS, Harrisville: UTRC13059, held by Nilson Homes
SIPPY - RIVERTON among its neighbors
100 discharge permits are in the Butterfield Creek subwatershed (HUC 160202040103); UTRC13054 is one.
Other permits in the Butterfield Creek subwatershed (HUC 160202040103)
- 13000 S MVC CRUSHING SITE, Herriman: UTRC08254, minor, term to 2025-02-04
- 8172 W DRY CANYON CIRCLE, HERRIMAN, Herriman: UTRH05515, minor, term to 2023-07-04
- ALDORA RIDGE SUBDIVISION BY GREEN HAVEN HOMES, Herriman: UTRC11981, minor, term to 2026-11-30
- APEX INSURANCE, Riverton: UTRC01609, minor, term to 2021-11-09
- BALDAUF SUBDIVISION 2, Herriman: UTRC06464, minor, term to 2025-02-27
- BANGERTER SOUTH INTERCHANGES -13400 SOUTH, Riverton: UTRC07451, minor, term to 2025-08-23
- BANGERTER SOUTH INTERCHANGES-13400 SOUTH, Riverton: UTRC09313, minor, term to 2025-07-31
- BECKSTEAD/BUTTERFIELD OFFICE CONVERSION, Riverton: UTR391917, minor, term to 2020-03-15
- BECKSTROM RESIDENCE, Riverton: UTRH07088, minor, term to 2024-09-17
- BOWDEN RESIDENCE, Herriman: UTRC13049, minor, term to 2027-06-17
Identity
| Facility | SIPPY - RIVERTON |
|---|---|
| Permittee | High Pine Construction |
| NPDES ID | UTRC13054 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | June 19, 2026 |
| Expires | June 18, 2027 |
| Agency | UTDEQ |
| Address | Riverton, UT 84065 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Butterfield Creek (HUC 160202040103) |
NPDES UTRC13054: effluent limits and exceedances
SIPPY - RIVERTON (NPDES UTRC13054): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES UTRC13054: no pollutant row on file.
NPDES UTRC13054: inspections, violations and enforcement
NPDES UTRC13054 (SIPPY - RIVERTON): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES UTRC13054
NPDES UTRC13054: one email when its EPA record changes — $99/month.
Permits near NPDES UTRC13054
NPDES UTRC13054: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.