NPDES UTRC13363 · Clean Water Act
HEARTWOOD FARM, Washington, UT: NPDES UTRC13363 discharge permit, effluent exceedances, inspections, penalties
HEARTWOOD FARM, Washington, Utah: General permit coverage UTRC13363, held by JP Excavating Inc; Construction stormwater; Effective; issued August 11, 2026, term to August 10, 2027, by UTDEQ.
Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 13,336 were issued before UTRC13363.
Coverages issued nearest UTRC13363
- 2026-08-10: GLENMAR RANCHES LOT 6 2233 FLAT TOP ROAD EAGLE MOUNTAIN, UTAH, Eagle Mountain: UTRH11845, held by Justin Faulkner
- 2026-08-10: SKYRIDGE LOT 50, Daniel: UTRH11846, held by Northstar Builders
- 2026-08-10: ZION SHORES LOT 33, Washington: UTRH11847, held by Becki Owens
- 2026-08-11: 300 W RECONSTRUCTION, Riverdale: UTRC13358, held by Skyview Excavation
- 2026-08-11: CLIFF LAKE BY LEISURE VILLAS - RENEWED, Saratoga Springs: UTRC13362, held by Cliff Lake LLC and Bannana Point LLC
- 2026-08-11: LA VERKIN POND AND PIPELINE PROJECT, La Verkin: UTRC13364, held by Whitaker Construction
- 2026-08-11: RAWSON RANCH SUBDIVISION PHASE 2, Hooper: UTRC13365, held by STEVE AUSTIN CONSTRUCTION
- 2026-08-11: WEST MEADOWS PHASE 1&2, West Point: UTRC13366, held by Nilson Homes
- 2026-08-11: TBID 2026 WATERLINE, Taylorsville: UTRC13367, held by RDJ Construction
- 2026-08-11: SOLACE PHASES, Santa Clara: UTRC13368, held by Solace SC LLC
HEARTWOOD FARM among its neighbors
636 discharge permits are in the Middleton Wash-Virgin River subwatershed (HUC 150100080910); UTRC13363 is one.
Other permits in the Middleton Wash-Virgin River subwatershed (HUC 150100080910)
- 1103 ST GEORGE (SG-5-3-10-1103), St. George: UTRH06625, minor, term to 2024-05-17
- 123 CRIMSON VISTA, St. George: UTRH03262, minor, term to 2022-06-17
- 1236 S SIERRA VISTA CIRCLE, St. George: UTRL00265
- 1358 E PONY TRAIL WAY WASHINGTON, UTAH 84780, Washington: UTRH10276, minor, term to 2026-09-04
- 1450 EAST ROADWAY EXTENSION, St. George: UTRC03020, minor, term to 2022-06-20
- 1450 EAST ROADWAY EXTENSION, St. George: UTRC03088, minor, term to 2022-07-05
- 29 BOULDERS, St. George: UTRH03475, minor, term to 2022-07-26
- 30 GRAND HEIGHTS, St. George: UTRH03266, minor, term to 2022-06-17
- 34 WESTGATE HILLS, Washington: UTRH05029, minor, term to 2023-04-10
- 3430 E/EZRA LN IMPROVMENTS, St. George: UTRL00727
What stands out
- Its term runs 364 days, August 11, 2026 to August 10, 2027.
- No dated event in the 365 days to September 15, 2026.
- It is one of 17,184 discharge permits on the register in Utah; 14,166 of them (82%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | HEARTWOOD FARM |
|---|---|
| Permittee | JP Excavating Inc |
| NPDES ID | UTRC13363 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | August 11, 2026 |
| Expires | August 10, 2027 |
| Agency | UTDEQ |
| Address | Washington, UT 84780 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Middleton Wash-Virgin River (HUC 150100080910) |
NPDES UTRC13363: effluent limits and exceedances
HEARTWOOD FARM (NPDES UTRC13363): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES UTRC13363: no pollutant row on file.
NPDES UTRC13363: inspections, violations and enforcement
NPDES UTRC13363 (HEARTWOOD FARM): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES UTRC13363
NPDES UTRC13363: one email when its EPA record changes — $99/month.
Permits near NPDES UTRC13363
NPDES UTRC13363: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.