NPDES UTRC13485 · Clean Water Act
GATEWAY PEAKS, Parowan, UT: NPDES UTRC13485 discharge permit, effluent exceedances, inspections, penalties
GATEWAY PEAKS, Parowan, Utah: General permit coverage UTRC13485, held by RED HILLS CAPITAL L L C; Construction stormwater; Effective; issued August 31, 2026, term to August 30, 2027, by UTDEQ.
Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 13,546 were issued before UTRC13485.
Coverages issued nearest UTRC13485
- 2026-08-31: ARC LODGE, Eden: UTRC13480, held by Jacobsen
- 2026-08-31: SHELTER HILL- ENCLAVE PUMPHOUSE, POND AND HALF PINT LIFT, Eden: UTRC13481, held by Granite Construction
- 2026-08-31: JONES DAM, Heber City: UTRC13482, held by Whitaker Construction
- 2026-08-31: TIMBERLINE LODGE PARKING LOT, Eden: UTRC13483, held by Granite Construction
- 2026-08-31: SANDS COVE 18, Hurricane: UTRC13484, held by Rose Bradley Homes
- 2026-08-31: PG MIXED USE, Pleasant Grove: UTRC13488, held by Flagship Homes
- 2026-08-31: 7 BREW - LINDON (STATE ST) 01, Lindon: UTRH11954, held by Miguel Ortega
- 2026-08-31: LOT 6, Draper: UTRH11956, held by Clint Berhow
- 2026-08-31: BUTLER RESIDENCE, Eden: UTRH11957, held by Envision Homes, Inc
- 2026-08-31: THIBEAULT RESIDENCE, Sandy: UTRH11958, held by Steven Dailey Construction
Other permits in Parowan
- CEDAR RUNAWAY TRUCK RAMP, Parowan: UTR358311, minor, term to 2011-08-31
- PAROWAN AIRPORT, Parowan: UTR000193, minor, term to 1997-09-30
- PAROWAN BRIDGE REHABILITATION, Parowan: UTRC12644, minor, term to 2027-04-15
- PAROWAN CITY, Parowan: UT0026158, minor, term to 2025-07-31
- PAROWAN HIGH SCHOOL FIELDHOUSE, Parowan: UTRC08587, minor, term to 2025-04-04
- PAROWAN HOTEL, Parowan: UTRC08698, minor, term to 2025-04-22
- PAROWAN MUNICIPAL AIRPORT RUNWAY REHABILITATION, Parowan: UTRC07469, minor, term to 2024-08-22
- PAROWAN TO BRAIN HEAD 69KV, Parowan: UTRC10706, minor, term to 2026-04-16
- PAROWAN WATER CONVEYANCE, Parowan: UTRC11144, minor, term to 2026-06-24
- SR-143; SLOPE STABILIZATION & FLOOD REPAIR PHASE 1, Parowan: UTRC07830, minor, term to 2024-10-30
What stands out
- Its term runs 364 days, August 31, 2026 to August 30, 2027.
- No dated event in the 365 days to October 14, 2026.
- It is one of 17,184 discharge permits on the register in Utah; 14,166 of them (82%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | GATEWAY PEAKS |
|---|---|
| Permittee | RED HILLS CAPITAL L L C |
| NPDES ID | UTRC13485 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | August 31, 2026 |
| Expires | August 30, 2027 |
| Agency | UTDEQ |
| Address | Parowan, UT 84761 |
NPDES UTRC13485: effluent limits and exceedances
GATEWAY PEAKS (NPDES UTRC13485): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES UTRC13485: no pollutant row on file.
NPDES UTRC13485: inspections, violations and enforcement
NPDES UTRC13485 (GATEWAY PEAKS): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES UTRC13485
NPDES UTRC13485: one email when its EPA record changes — $99/month.
Permits near NPDES UTRC13485
NPDES UTRC13485: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.