NPDES UTRH01834 · Clean Water Act
ROD WOOD, West Bountiful, UT: NPDES UTRH01834 discharge permit, effluent exceedances, inspections, penalties
ROD WOOD, West Bountiful, Utah: General permit coverage UTRH01834, held by Kim Dunn Construction; Construction stormwater; Administratively continued; issued December 4, 2020, term to December 3, 2021, by UTDEQ.
Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 1,224 were issued before UTRH01834.
Coverages issued nearest UTRH01834
- 2020-12-03: DOHERTY RESIDENCE, Park City: UTRC01724, held by Doug Jardine
- 2020-12-03: STONE CLIFF PH. 16A, LOT 1602, St. George: UTRH01831, held by K.H. Traveller Custom Homes
- 2020-12-04: HEIGHTS PARK, South Jordan: UTR390585, held by Sego Construction
- 2020-12-04: PENDLETON GROVE, Magna: UTRC01700, held by Strunk Construction
- 2020-12-04: J. J. J. HOME, LOT 205, Herriman: UTRH01806, held by Jose A. de la Cruz
- 2020-12-06: SOUTH RIM AT FOREMASTER RIDGE LOT 16, St. George: UTRH01841, held by Matt Fergusen/MLF construction
- 2020-12-07: URBAN TOWNHOMES, South Jordan: UTRC01729, held by Sego Homes
- 2020-12-07: LOT 116 CASTLE ROCK, St. George: UTRC01730, held by wandering river llc
- 2020-12-07: NORTHRIDGE ESTATES, Mapleton: UTRC01733, held by Arive Homes
- 2020-12-07: LOFTS AT FALCON HILL P.U.D., Sunset: UTRC01734, held by Liberty Associates
ROD WOOD among its neighbors
98 discharge permits are in the Mercer Canyon subwatershed (HUC 160202010405); UTRH01834 is one.
Other permits in the Mercer Canyon subwatershed (HUC 160202010405)
- 2853 E LIAM LANE, Eagle Mountain: UTRL00523
- 5029 N LAKE MOUNTAIN RD, Eagle Mountain: UTRH08672, minor, term to 2025-09-29
- AQUILA PIPELINE PROJECT, Eagle Mountain: UTRC13207, minor, term to 2027-07-13
- AQUILA POWER GENERATION STATION, Eagle Mountain: UTRC11991, minor, term to 2026-12-01
- AVAILABLE STORAGE, Eagle Mountain: UTRC01928, minor, term to 2022-03-08
- BRIA RESIDENCE, Eagle Mountain: UTRL00318
- BROWNS MEADOW LOT 101, Eagle Mountain: UTRH09847, minor, term to 2026-06-10
- BRYLEE FARMS, Eagle Mountain: UTR396439, minor, term to 2021-09-27
- CEDAR CORNERS, Eagle Mountain: UTR391103, minor, term to 2022-02-03
- CORY B. WRIDE MEMORIAL PARK, Eagle Mountain: UTRC01712, minor, term to 2021-11-30
What stands out
- Its term runs 364 days, December 4, 2020 to December 3, 2021; the term ended 1,747 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to September 15, 2026.
- It is one of 17,184 discharge permits on the register in Utah; 14,166 of them (82%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | ROD WOOD |
|---|---|
| Permittee | Kim Dunn Construction |
| NPDES ID | UTRH01834 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | December 4, 2020 |
| Expires | December 3, 2021 |
| Agency | UTDEQ |
| Address | West Bountiful, UT 84087 |
| Subwatershed | Mercer Canyon (HUC 160202010405) |
NPDES UTRH01834: effluent limits and exceedances
ROD WOOD (NPDES UTRH01834): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES UTRH01834: no pollutant row on file.
NPDES UTRH01834: inspections, violations and enforcement
NPDES UTRH01834 (ROD WOOD): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES UTRH01834
NPDES UTRH01834: one email when its EPA record changes — $99/month.
Permits near NPDES UTRH01834
NPDES UTRH01834: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.