NPDES UTRH03523 · Clean Water Act
NORTH POINT LOT 1, Alpine, UT: NPDES UTRH03523 discharge permit, effluent exceedances, inspections, penalties
NORTH POINT LOT 1, Alpine, Utah: General permit coverage UTRH03523, held by North Valley Builders Cory Banks; Construction stormwater; Administratively continued; issued August 3, 2021, term to August 2, 2022, by UTDEQ.
Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 2,441 were issued before UTRH03523.
Coverages issued nearest UTRH03523
- 2021-08-03: BROOKSIDE HEBER, Heber City: UTRC01167, held by Hamlet Homes
- 2021-08-03: CRAIG CIRCLE, Millcreek: UTRC03253, held by RMTR Investments LLC
- 2021-08-03: DRAPER WAREHOUSE, Draper: UTRC03257, held by Shelby Homes
- 2021-08-03: MOORE HOME, Park City: UTRH03521, held by Taylor Summerhays
- 2021-08-03: BAILEY'S POINTE, Lehi: UTRH03522, held by Shamrock Homes
- 2021-08-03: STONE CLIFFS LOT 1609, St. George: UTRH03524, held by Jenson Construction
- 2021-08-03: WATTERSON NEW HOME, Providence: UTRH03525, held by StoneHaven Construction
- 2021-08-03: ROCKY CHRISTENSON COTTAGE, Oakley: UTRH03526, held by Iron Rock Customs
- 2021-08-04: WHEELER MACHINERY 'WASP' BUILDING, West Valley City: UTRC03262, held by Hughes General Contractors
- 2021-08-04: WOLF BARN POND, Eden: UTRC03263, held by Summit Mountain Holding Group
NORTH POINT LOT 1 among its neighbors
277 discharge permits are in the Headwaters Dry Creek subwatershed (HUC 160202011001); UTRH03523 is one.
Other permits in the Headwaters Dry Creek subwatershed (HUC 160202011001)
- 103 W CASCADE AVE. ALPINE, Alpine: UTRH04721, minor, term to 2026-02-20
- 11 ALPINE COVE, Alpine: UTRC11403, minor, term to 2026-08-06
- 115 EAGLE CHASE DR, Draper: UTRH10615, minor, term to 2026-11-09
- 13083 N PROSPECTOR WAY ALPINE LOT 49, Alpine: UTRC00310, minor, term to 2021-04-13
- 13189 N OAK HILL DR, ALPINE. LOT 15, Alpine: UTRC00309, minor, term to 2021-04-13
- 14617 S CANYON END DR, Draper: UTRH11387, minor, term to 2027-05-10
- 19 BEACON HILLS, Highland: UTRH10208, minor, term to 2026-08-20
- 21107 THREE FALLS 47, Alpine: UTRC01223, minor, term to 2023-09-11
- 409 SKYE ESTATES, Highland: UTRH09399, minor, term to 2026-03-19
- 435 SOUTH SILVER LANE, Alpine: UTRC05594, minor, term to 2023-08-07
What stands out
- Its term runs 364 days, August 3, 2021 to August 2, 2022; the term ended 1,505 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to September 15, 2026.
- It is one of 17,184 discharge permits on the register in Utah; 14,166 of them (82%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | NORTH POINT LOT 1 |
|---|---|
| Permittee | North Valley Builders Cory Banks |
| NPDES ID | UTRH03523 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | August 3, 2021 |
| Expires | August 2, 2022 |
| Agency | UTDEQ |
| Address | Alpine, UT 84004 |
| Subwatershed | Headwaters Dry Creek (HUC 160202011001) |
NPDES UTRH03523: effluent limits and exceedances
NORTH POINT LOT 1 (NPDES UTRH03523): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES UTRH03523: no pollutant row on file.
NPDES UTRH03523: inspections, violations and enforcement
NPDES UTRH03523 (NORTH POINT LOT 1): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES UTRH03523
NPDES UTRH03523: one email when its EPA record changes — $99/month.
Permits near NPDES UTRH03523
NPDES UTRH03523: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.