NPDES UTRH05233 · Clean Water Act
SC 1341, Santa Clara, UT: NPDES UTRH05233 discharge permit, effluent exceedances, inspections, penalties
SC 1341, Santa Clara, Utah: General permit coverage UTRH05233, held by Nechako Capital; Construction stormwater; Effective; issued May 10, 2022, term to May 9, 2023, by UTDEQ.
Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 3,940 were issued before UTRH05233.
Coverages issued nearest UTRH05233
- 2022-05-10: EAGLE TOWN CENTER PHASE II, Eagle Mountain: UTRC05026, held by KNP Construction Inc
- 2022-05-10: LAKESHORE LANDING, American Fork: UTRC05029, held by Keystone Construction
- 2022-05-10: 1245 CANYON GATE ROAD, Park City: UTRH02860, held by Scott & Kelly Schofield
- 2022-05-10: MADISON MEADOWS LOT 205, Lehi: UTRH05225, held by SALTRIVER HOMES LLC
- 2022-05-10: DESERT RESERVE 108, St. George: UTRH05231, held by JW West Homes
- 2022-05-10: DESERT RESERVE 118, St. George: UTRH05238, held by JW West Homes
- 2022-05-10: DESERT RESERVE 202, St. George: UTRH05239, held by JW West Homes
- 2022-05-10: FERMELIA RESIDENCE, Sandy: UTRH05241, held by Heritage custom homes
- 2022-05-11: CITY CREEK RESERVE SITES A, Salt Lake City: UTRC02943, held by Stout Building Contractors
- 2022-05-11: RUSTED HILLS, Washington: UTRC05038, held by TC Custom Home & Design LLC
SC 1341 among its neighbors
313 discharge permits are in the Wittwer Canyon-Santa Clara River subwatershed (HUC 150100080808); UTRH05233 is one.
Other permits in the Wittwer Canyon-Santa Clara River subwatershed (HUC 150100080808)
- 167 W IVINS RESIDENCE, Ivins: UTRH09631, minor, term to 2026-04-28
- 316 HILLS @ SANTA CLARA, Santa Clara: UTRH11107, minor, term to 2027-03-09
- 3173 SWISS, Santa Clara: UTRH09155, minor, term to 2026-01-29
- 322 HILLS @ SANTA CLARA, Santa Clara: UTRH06720, minor, term to 2024-06-12
- 850 RIVERWOOD LANE SANTA CLARA, UTAH 84765, Santa Clara: UTRH02882, minor, term to 2022-04-21
- ABBOTT, Ivins: UTRH08626, minor, term to 2025-09-18
- ALTURA LOT 48, Ivins: UTRH08949, minor, term to 2025-12-05
- ALTURA PHASE 2, Ivins: UTRC01931, minor, term to 2022-01-18
- ANASAZI VISTA, Ivins: UTRC00822, minor, term to 2024-07-14
- ARCADIA, Santa Clara: UTR380669, minor, term to 2022-08-06
What stands out
- Its term runs 364 days, May 10, 2022 to May 9, 2023; the term ended 1,225 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as effective.
- No dated event in the 365 days to September 15, 2026.
- It is one of 17,184 discharge permits on the register in Utah; 14,166 of them (82%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | SC 1341 |
|---|---|
| Permittee | Nechako Capital |
| NPDES ID | UTRH05233 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | May 10, 2022 |
| Expires | May 9, 2023 |
| Agency | UTDEQ |
| Address | Santa Clara, UT 84765 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Wittwer Canyon-Santa Clara River (HUC 150100080808) |
NPDES UTRH05233: effluent limits and exceedances
SC 1341 (NPDES UTRH05233): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES UTRH05233: no pollutant row on file.
NPDES UTRH05233: inspections, violations and enforcement
NPDES UTRH05233 (SC 1341): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES UTRH05233
NPDES UTRH05233: one email when its EPA record changes — $99/month.
Permits near NPDES UTRH05233
NPDES UTRH05233: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.