Velarion Records
Free: one email when NPDES UTRH05787 changes. Unsubscribe any time.

NPDES UTRH05787 · Clean Water Act

BAXTER FARM LOT 4, Orem, UT: NPDES UTRH05787 discharge permit, effluent exceedances, inspections, penalties

BAXTER FARM LOT 4, Orem, Utah: General permit coverage UTRH05787, held by Blake Hendry; Construction stormwater; Administratively continued; issued September 5, 2022, term to September 4, 2023, by UTDEQ.

Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 4,585 were issued before UTRH05787. Blake Hendry holds 3 permits in Utah.

Other permits held by Blake Hendry

Coverages issued nearest UTRH05787

BAXTER FARM LOT 4 among its neighbors

332 discharge permits are in the Lower American Fork Canyon-Frontal Utah Lake subwatershed (HUC 160202010803); UTRH05787 is one.

Other permits in the Lower American Fork Canyon-Frontal Utah Lake subwatershed (HUC 160202010803)

Identity

FacilityBAXTER FARM LOT 4
PermitteeBlake Hendry
NPDES IDUTRH05787
StatusAdministratively continued
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramConstruction stormwater
IssuedSeptember 5, 2022
ExpiresSeptember 4, 2023
AgencyUTDEQ
AddressOrem, UT 84057
SubwatershedLower American Fork Canyon-Frontal Utah Lake (HUC 160202010803)

NPDES UTRH05787: effluent limits and exceedances

BAXTER FARM LOT 4 (NPDES UTRH05787): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.

NPDES UTRH05787: no pollutant row on file.

NPDES UTRH05787: inspections, violations and enforcement

NPDES UTRH05787 (BAXTER FARM LOT 4): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.

Watch NPDES UTRH05787

NPDES UTRH05787: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES UTRH05787

NPDES UTRH05787: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.