NPDES UTRH05851 · Clean Water Act
DESERT COLOR, PHASE 5, LOT 548, St. George, UT: NPDES UTRH05851 discharge permit, effluent exceedances, inspections, penalties
DESERT COLOR, PHASE 5, LOT 548, St. George, Utah: General permit coverage UTRH05851, held by Split Rock Construction; Construction stormwater; Effective; issued September 25, 2022, term to September 24, 2023, by UTDEQ.
Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 4,700 were issued before UTRH05851. Split Rock Construction holds 55 permits in Utah.
Other permits held by Split Rock Construction
- ABBERELY FARMS #4, St. George: UTRC05447, issued 2022-07-27
- ABBERLEY FARMS #7, St. George: UTRC05448, issued 2022-07-27
- ENTRADA AT SNOW CANYON CHACO WEST #9, St. George: UTRC10011, issued 2024-12-15
- SOUTH VILLAGE AT BLACK DESERT #11, Santa Clara: UTRC10150, issued 2025-01-21
- DESERT COLOR LOT 550, St. George: UTRH04704, issued 2022-02-17
- RESERVES AT ENTRADA PHASE D, LOT 156, Ivins: UTRH05248, issued 2022-05-12
- RESERVES AT ENTRADA PHASE C, LOT 37, Ivins: UTRH05318, issued 2023-06-27
- KAYENTA /TAVIAWK, PHASE 2, LOT 43, Ivins: UTRH05343, issued 2023-06-27
- THE RESERVES 23, Ivins: UTRH05469, issued 2022-06-26
- DESERT COLOR, PHASE 5, LOT 550, St. George: UTRH05575, issued 2022-07-27
Coverages issued nearest UTRH05851
- 2022-09-23: AUBURN HILLS CONDOS, St. George: UTRC01475, held by Visionary Homes
- 2022-09-23: BEACON POINT VILLAGE 2 - BECK RIDGE, Saratoga Springs: UTRC05869, held by Hadco Construction
- 2022-09-23: LONGVIEW MEADOWS, Elk Ridge: UTRC05870, held by Rino Excavating
- 2022-09-23: DESERT COLOR RESORT 130, St. George: UTRH05868, held by Cedar Pointe Homes, LLC
- 2022-09-25: MONTDELLA TOWNHOMES, Alpine: UTRC05874, held by Brayden Schultz
- 2022-09-26: BULINGTONS, Highland: UTRC05877, held by Doug Degelbeck
- 2022-09-26: LOGAN FIRE STATION #70, Logan: UTRC05880, held by Hogan Construction
- 2022-09-26: 3515 W 3400 S, Wellsville: UTRH05776, held by Darren and Cody Farar
- 2022-09-26: JACOBS RANCH S PHASE 2, Saratoga Springs: UTRH05872, held by Daniel Vazquez
- 2022-09-27: FJ GILLMOR SUBDIVISION, Park City: UTRC05882, held by Wardell Brothers Construction
DESERT COLOR, PHASE 5, LOT 548 among its neighbors
85 discharge permits are in the Workman Wash subwatershed (HUC 150100080907); UTRH05851 is one.
Other permits in the Workman Wash subwatershed (HUC 150100080907)
- 105 KNOLLS AT LITTLE VALLEY, St. George: UTRH01968, minor, term to 2022-01-04
- 1355 E PONY WAY WASHINGTON, UT 84780, Washington: UTRH07535, minor, term to 2026-01-31
- ARANCIO POINT, St. George: UTRC03399, minor, term to 2024-08-25
- BALANCE OF NATURE PHASE 1A1 AND 1A2, Hurricane: UTRC08463, minor, term to 2025-03-12
- BUTTERWORTH CUSTOM - VERTICAL, Hurricane: UTRH10788, minor, term to 2027-01-01
- CHACO SOUTH #78, St. George: UTRH07767, minor, term to 2025-03-19
- CLIFF DWELLERS RANCH PHASE 1 LOT 28, Hurricane: UTRC12604, minor, term to 2027-04-08
- COPPER MEADOWS PH 1, Hurricane: UTRC12864, minor, term to 2027-05-19
- COPPER MEADOWS/VISTA - ORCHARDS, Hurricane: UTRC11257, minor, term to 2026-07-14
- COPPER ROCK #5, Hurricane: UTRH03171, minor, term to 2022-06-02
What stands out
- Its term runs 364 days, September 25, 2022 to September 24, 2023; the term ended 1,087 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as effective.
- No dated event in the 365 days to September 15, 2026.
- It is one of 17,184 discharge permits on the register in Utah; 14,166 of them (82%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | DESERT COLOR, PHASE 5, LOT 548 |
|---|---|
| Permittee | Split Rock Construction |
| NPDES ID | UTRH05851 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | September 25, 2022 |
| Expires | September 24, 2023 |
| Agency | UTDEQ |
| Address | St. George, UT 84790 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Workman Wash (HUC 150100080907) |
NPDES UTRH05851: effluent limits and exceedances
DESERT COLOR, PHASE 5, LOT 548 (NPDES UTRH05851): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES UTRH05851: no pollutant row on file.
NPDES UTRH05851: inspections, violations and enforcement
NPDES UTRH05851 (DESERT COLOR, PHASE 5, LOT 548): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES UTRH05851
NPDES UTRH05851: one email when its EPA record changes — $99/month.
Permits near NPDES UTRH05851
NPDES UTRH05851: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.