NPDES UTRH06129 · Clean Water Act
CLINTON MOB, Clinton, UT: NPDES UTRH06129 discharge permit, effluent exceedances, inspections, penalties
CLINTON MOB, Clinton, Utah: General permit coverage UTRH06129, held by Altus Development Group, LLC; Construction stormwater; Administratively continued; issued December 16, 2022, term to December 15, 2023, by UTDEQ.
Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 4,974 were issued before UTRH06129.
Coverages issued nearest UTRH06129
- 2022-12-15: VINEYARD GROVE STAKE CENTER, Vineyard: UTRC06171, held by WARNER & ASSOCIATES CONSTRUCTION INC.
- 2022-12-15: PAINE ADU, Park City: UTRH06127, held by Valley Design Build, LLC
- 2022-12-15: KACHINA CLIFFS LOT #12, St. George: UTRH06130, held by JS Custom Homes
- 2022-12-16: ALTITUDE, Salt Lake City: UTRC03953, held by BCC Group LLC
- 2022-12-16: VILLAGE AT NORTH STATION, Salt Lake City: UTRC04036, held by Headwaters Construction Company
- 2022-12-19: LAKESIDE 2 & 3, Hurricane: UTRC04011, held by Quality Excavation
- 2022-12-19: 91303.86 FL81 RELOC 2000FT, St. George: UTRC06179, held by Questar Gas Company dba Dominion Energy Utah
- 2022-12-19: CRIMSON TRAILS, Washington: UTRC06180, held by Quality Excavation
- 2022-12-20: IHC LAYTON AMBULATORY SURGICAL CENTER, Layton: UTRC06183, held by Big-D Construction
- 2022-12-20: SCARLET RIDGE ESTATES, Eagle Mountain: UTRC06184, held by Scarlet Ridge Partners LLC
CLINTON MOB among its neighbors
117 discharge permits are in the Howard Slough-Frontal Farmington Bay subwatershed (HUC 160201020506); UTRH06129 is one.
Other permits in the Howard Slough-Frontal Farmington Bay subwatershed (HUC 160201020506)
- 103 HARRISBURG COUNTRY ESTATES, Clinton: UTRH09416, minor, term to 2026-03-23
- 107 HARRISBURG COUNTRY ESTATES, Clinton: UTRH10083, minor, term to 2026-07-30
- 1300 NORTH - MAIN STREET TO 1285 WEST WATERLINE, Clinton: UTRC05467, minor, term to 2023-07-28
- 1681 N 3000 W, Clinton: UTRH01321, minor, term to 2021-09-16
- 1800 N GATE PACKAGE 1 & 2, Hill Afb: UTRC12986, minor, term to 2027-06-09
- 2093-3091 W 5600 S DEMO'S, Roy: UTRC06224, minor, term to 2025-01-05
- 4000 S SRTS RAIL CROSSING, Roy: UTRC12424, minor, term to 2027-03-09
- 44 RIVER CROSSINGS, Plain City: UTRH01041, minor, term to 2021-08-14
- 92-R HARRISBURG, Clinton: UTRH01576, minor, term to 2021-10-25
- 93-R HARRISBURG, Clinton: UTRH09020, minor, term to 2025-12-28
What stands out
- Its term runs 364 days, December 16, 2022 to December 15, 2023; the term ended 1,005 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to September 15, 2026.
- It is one of 17,184 discharge permits on the register in Utah; 14,166 of them (82%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | CLINTON MOB |
|---|---|
| Permittee | Altus Development Group, LLC |
| NPDES ID | UTRH06129 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | December 16, 2022 |
| Expires | December 15, 2023 |
| Agency | UTDEQ |
| Address | Clinton, UT 84015 |
| Subwatershed | Howard Slough-Frontal Farmington Bay (HUC 160201020506) |
NPDES UTRH06129: effluent limits and exceedances
CLINTON MOB (NPDES UTRH06129): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES UTRH06129: no pollutant row on file.
NPDES UTRH06129: inspections, violations and enforcement
NPDES UTRH06129 (CLINTON MOB): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES UTRH06129
NPDES UTRH06129: one email when its EPA record changes — $99/month.
Permits near NPDES UTRH06129
NPDES UTRH06129: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.