Clean Water Act discharge permit · NPDES UTRH06158
267 WHITE PINE CANYON ROAD, Park City, UT: NPDES UTRH06158 discharge permit, effluent exceedances, inspections, penalties
- Administratively continuedPermit status
- MinorDischarger class
- 0Pollutants under a numeric limit
- 0Pollutants with an effluent exceedance
- 0Inspections on file
- 0Formal enforcement actions
267 WHITE PINE CANYON ROAD, held by David Leiman, holds NPDES permit UTRH06158. EPA’s file records it issued December 29, 2022 and expiring December 28, 2023. The status and dates are as EPA’s permit file stood when Velarion loaded it (October 14, 2026); EPA’s free Detailed Facility Report on ECHO carries the permit’s current standing.
What the register holds for 267 WHITE PINE CANYON ROAD: its NPDES ID, its permit type and status, its dates, its address in Park City, Utah. EPA’s effluent violation file and its single-event violation file hold no violation for NPDES UTRH06158.
What stands out
- Its term runs 364 days, December 29, 2022 to December 28, 2023; the term ended 1,021 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to October 14, 2026.
- It is one of 17,184 discharge permits on the register in Utah; 14,166 of them (82%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility as filed | 267 WHITE PINE CANYON ROAD |
|---|---|
| Permittee as filed | David Leiman |
| NPDES ID | UTRH06158 |
| Permit status | Administratively continued (past its expiration date and still in force until reissued) |
| Permit type | Coverage under a general permit |
| Discharger class | Minor discharger |
| Facility type | Not a publicly owned treatment works |
| Program | Construction stormwater |
| Issued | December 29, 2022 |
| Expiration date | December 28, 2023 |
| Issuing agency | UTDEQ |
| Address | Park City, UT 84060 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Kimball Creek (HUC 160201020101) |
Cited to the EPA ICIS-NPDES permit file (ECHO download).
Effluent limits and exceedances
- 0Pollutants on file
- 0Under a numeric limit
- 0With a violation of any kind
- 0With an effluent exceedance
EPA’s limits and effluent violation files hold no pollutant row for NPDES UTRH06158.
Cited to the EPA ICIS-NPDES limits and effluent violations files (ECHO download); up to 60 rows shown, most exceedances first.
Inspections, violations and enforcement
- 0Single-event violations
EPA’s single-event violation file, as loaded, holds no violation for NPDES UTRH06158.
Inspections
EPA’s inspection file holds no inspection for NPDES UTRH06158.
Formal enforcement and penalties
0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.
Informal enforcement
EPA’s informal enforcement file holds no action for NPDES UTRH06158.
Cited to the EPA ICIS-NPDES violation, inspection and enforcement files (ECHO download); up to 50 rows of each shown, newest first.
Watch this permit
One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, UTRH06158.
Start the watch
- One permit holder — $99/month
- One watershed — $2,990/year
- One state — $4,990/year
- The whole register — $18,000/year
How we handle your data → Privacy
EPA publishes a free Detailed Facility Report for every permit on ECHO: its compliance status quarter by quarter, its inspections, and its enforcement actions and penalties. EPA also sends free notices of new inspections and enforcement actions through ECHO Notify; enter NPDES ID UTRH06158 there.
267 WHITE PINE CANYON ROAD, Park City, Utah: Coverage under a general permit UTRH06158, held by David Leiman; Construction stormwater; Administratively continued (past its expiration date and still in force until reissued); issued December 29, 2022, term to December 28, 2023, by UTDEQ.
Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 4,999 were issued before UTRH06158. David Leiman holds 3 permits in Utah.
Other permits held by David Leiman
- 267 WHITE PINE CANYON ROAD, Park City: UTRC10963, issued 2025-05-27
- 267 WHITE PINE CANYON ROAD, Park City: UTRH03478, issued 2021-07-27
Coverages issued nearest UTRH06158
- 2022-12-27: ZAVALA RESIDENCE, West Valley City: UTRH06155, held by Elevated Masonry And Construction
- 2022-12-28: TAYLOR LANDING - VERTICAL, Ogden: UTRC04167, held by Sierra Home Builders LLC
- 2022-12-28: MAYFLOWER MOUNTAIN RESORT TANKS, Park City: UTRC06196, held by FX Construction
- 2022-12-29: TAKE 5 OIL CHANGE - LAYTON, Layton: UTRC06199, held by Dreamworks Contractors
- 2022-12-29: GIVERNY, Cottonwood Heights: UTRH01997, held by MARK HASLAM
- 2022-12-30: BAY VIEW, Provo: UTRC01838, held by Jimmy Zufelt
- 2022-12-30: 160 E. 200 N., Smithfield: UTRH06159, held by Brian Carlson
- 2023-01-01: ROCKY POINT, Willard: UTR259889, held by Staker Parson Companies
- 2023-01-02: DYNO NOBEL TOOELE COUNTY R&D SITE, Tooele: UTRC06202, held by Hadco Construction and Michael baker International
- 2023-01-03: LOT 103 SILVER HILL LODGE, Brighton: UTRC06205, held by Alair Homes
267 WHITE PINE CANYON ROAD among its neighbors
132 discharge permits are in the Kimball Creek subwatershed (HUC 160201020101); UTRH06158 is one.
Other permits in the Kimball Creek subwatershed (HUC 160201020101)
- 14 IRON CANYON, Park City: UTRH06261, minor, term to 2024-02-07
- 201 WPC, Park City: UTRC01914, minor, term to 2023-01-13
- 2021 SHULER RESIDENCE, Park City: UTRH01889, minor, term to 2021-12-14
- 227 WHITE PINE CANYON ROAD, Park City: UTRH10438, minor, term to 2026-10-01
- 227_WPC_LAYTON_BARN, Park City: UTRH08158, minor, term to 2025-06-05
- 238 WHITE PINE CANYON ROAD, Park City: UTRC08282, minor, term to 2025-02-07
- 258 WHITE PINE CANYON, Park City: UTRH08022, minor, term to 2025-05-07
- 2668 ASPEN SPRINGS DR., Park City: UTRC10566, minor, term to 2026-03-30
- 267 WHITE PINE CANYON ROAD, Park City: UTRC10963, minor, term to 2026-05-26
- 267 WHITE PINE CANYON ROAD, Park City: UTRH03478, minor, term to 2022-07-26
Nearby on the register
- Discharge permits in Park City
- Every permit record in Park City, A to Z
- Discharge permits in Utah
- Every permit record in Utah, A to Z
Figures from EPA’s ICIS-NPDES download, loaded October 14, 2026.
What this page shows
The permit filed as 267 WHITE PINE CANYON ROAD, a storm water construction coverage in Park City, Utah, sits among 868 such permits in that city on EPA's NPDES register, and only 0.1% of those carry a violation on file. It is one of 132 NPDES permits in the Kimball Creek subwatershed, and 38.6% of the 849 storm water construction permits in Park City, this one included, were issued earlier than it. The permit records zero pollutants under a numeric limit and zero pollutants with an effluent exceedance.