NPDES UTRH06734 · Clean Water Act
1185 E 2560 N, North Logan, UT: NPDES UTRH06734 discharge permit, effluent exceedances, inspections, penalties
1185 E 2560 N, North Logan, Utah: General permit coverage UTRH06734, held by Rick Champlin; Construction stormwater; Administratively continued; issued June 15, 2023, term to June 14, 2024, by UTDEQ.
Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 5,699 were issued before UTRH06734.
Coverages issued nearest UTRH06734
- 2023-06-14: BULOSKI RESIDENCE, Draper: UTRH06727, held by BLJ Construction Inc
- 2023-06-15: HARWARD SUBDIVISION, Syracuse: UTRC04995, held by Kanyon Construction
- 2023-06-15: TOOELE HEADWORKS BUILDING, Tooele: UTRC07079, held by Tooele City
- 2023-06-15: HQF CAMPUS CONCRETE REPLACEMENT, Salt Lake City: UTRC07081, held by The Church of Jesus Christ of Latter Day Saints
- 2023-06-15: JVWCD - 3300 SOUTH PIPELINE PHASE 2 (B&C), Salt Lake City: UTRC07086, held by Beck Construction and Excavation, Inc.
- 2023-06-16: MEADOWS ON 32ND, West Valley City: UTRC05352, held by Brad Reynolds Construction
- 2023-06-16: NORTH OGDEN 2.0 MG RANDALL RESERVOIR NO. 2, North Ogden: UTRC07088, held by Patriot Construction, LLC
- 2023-06-16: ARROWHEAD RANCH, Payson: UTRC07089, held by Kilgore Contracting
- 2023-06-16: BOUNTIFUL HIGH STADIUM, Bountiful: UTRC07091, held by Hughes General Contractors
- 2023-06-16: MERRILL RESIDENCE, Eden: UTRH06737, held by Hawthorn Homes
1185 E 2560 N among its neighbors
185 discharge permits are in the Hopkins Slough subwatershed (HUC 160102020702); UTRH06734 is one.
Other permits in the Hopkins Slough subwatershed (HUC 160102020702)
- 101 MTN GATE, Hyde Park: UTRH04429, minor, term to 2022-12-26
- 1030 EAST 612 SOUTH, Smithfield: UTRH06622, minor, term to 2024-05-16
- 1200 EAST ROADWAY AND UTILITY IMPROVEMENTS, North Logan: UTRC09446, minor, term to 2025-08-25
- 2600 N EXTENSION, North Logan: UTRL00556
- 2850 NORTH LOGAN, North Logan: UTRC13138, minor, term to 2027-07-01
- 2850 NORTH ROADWAY AND UTILITY IMPROVEMENTS, North Logan: UTRC09380, minor, term to 2025-08-12
- 3100 NORTH ROADWAY, Hyde Park: UTRC00148, minor, term to 2021-03-17
- 3100 NORTH ROADWAY 1200 EAST TO 1600 EAST, North Logan: UTRC00813, minor, term to 2021-07-13
- 3300 HYDE PARK, Hyde Park: UTRC05622, minor, term to 2026-08-14
- 3776 TRISTAR RANCH, Benson: UTRC13252, minor, term to 2027-07-21
Identity
| Facility | 1185 E 2560 N |
|---|---|
| Permittee | Rick Champlin |
| NPDES ID | UTRH06734 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | June 15, 2023 |
| Expires | June 14, 2024 |
| Agency | UTDEQ |
| Address | North Logan, UT 84341 |
| Subwatershed | Hopkins Slough (HUC 160102020702) |
NPDES UTRH06734: effluent limits and exceedances
1185 E 2560 N (NPDES UTRH06734): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES UTRH06734: no pollutant row on file.
NPDES UTRH06734: inspections, violations and enforcement
NPDES UTRH06734 (1185 E 2560 N): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES UTRH06734
NPDES UTRH06734: one email when its EPA record changes — $99/month.
Permits near NPDES UTRH06734
NPDES UTRH06734: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.