Clean Water Act discharge permit · NPDES UTRH08538
478 MAPLE LAKES DRIVE, Mapleton, UT: NPDES UTRH08538 discharge permit, effluent exceedances, inspections, penalties
- Administratively continuedPermit status
- MinorDischarger class
- 0Pollutants under a numeric limit
- 0Pollutants with an effluent exceedance
- 0Inspections on file
- 0Formal enforcement actions
478 MAPLE LAKES DRIVE, held by Tod Kirton, holds NPDES permit UTRH08538. EPA’s file records it issued August 28, 2024 and expiring August 27, 2025. The status and dates are as EPA’s permit file stood when Velarion loaded it (September 15, 2026); EPA’s free Detailed Facility Report on ECHO carries the permit’s current standing.
What the register holds for 478 MAPLE LAKES DRIVE: its NPDES ID, its permit type and status, its dates, its address in Mapleton, Utah. EPA’s effluent violation file and its single-event violation file hold no violation for NPDES UTRH08538.
What stands out
- Its term runs 364 days, August 28, 2024 to August 27, 2025; the term ended 384 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to September 15, 2026.
- It is one of 17,184 discharge permits on the register in Utah; 14,166 of them (82%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility as filed | 478 MAPLE LAKES DRIVE |
|---|---|
| Permittee as filed | Tod Kirton |
| NPDES ID | UTRH08538 |
| Permit status | Administratively continued (past its expiration date and still in force until reissued) |
| Permit type | Coverage under a general permit |
| Discharger class | Minor discharger |
| Facility type | Not a publicly owned treatment works |
| Program | Construction stormwater |
| Issued | August 28, 2024 |
| Expiration date | August 27, 2025 |
| Issuing agency | UTDEQ |
| Address | Mapleton, UT 84664 |
| Subwatershed | Middle Spanish Fork Creek (HUC 160202020502) |
Cited to the EPA ICIS-NPDES permit file (ECHO download).
Effluent limits and exceedances
- 0Pollutants on file
- 0Under a numeric limit
- 0With a violation of any kind
- 0With an effluent exceedance
EPA’s limits and effluent violation files hold no pollutant row for NPDES UTRH08538.
Cited to the EPA ICIS-NPDES limits and effluent violations files (ECHO download); up to 60 rows shown, most exceedances first.
Inspections, violations and enforcement
- 0Single-event violations
EPA’s single-event violation file, as loaded, holds no violation for NPDES UTRH08538.
Inspections
EPA’s inspection file holds no inspection for NPDES UTRH08538.
Formal enforcement and penalties
0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.
Informal enforcement
EPA’s informal enforcement file holds no action for NPDES UTRH08538.
Cited to the EPA ICIS-NPDES violation, inspection and enforcement files (ECHO download); up to 50 rows of each shown, newest first.
Watch this permit
One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, UTRH08538.
Start the watch
- One permit holder — $99/month
- One watershed — $2,990/year
- One state — $4,990/year
- The whole register — $18,000/year
How we handle your data → Privacy
EPA publishes a free Detailed Facility Report for every permit on ECHO: its compliance status quarter by quarter, its inspections, and its enforcement actions and penalties. EPA also sends free notices of new inspections and enforcement actions through ECHO Notify; enter NPDES ID UTRH08538 there.
478 MAPLE LAKES DRIVE, Mapleton, Utah: Coverage under a general permit UTRH08538, held by Tod Kirton; Construction stormwater; Administratively continued (past its expiration date and still in force until reissued); issued August 28, 2024, term to August 27, 2025, by UTDEQ.
Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 7,615 were issued before UTRH08538.
Coverages issued nearest UTRH08538
- 2024-08-28: MOODY SUBDIVISION, West Valley City: UTRC09465, held by ENTELEN Design Build
- 2024-08-28: STOKES NATURE CENTER, Nibley: UTRC09467, held by Next Construction
- 2024-08-28: CHOLLA CREEK #9, Toquerville: UTRH08531, held by Tim Spivey
- 2024-08-28: PATTERSON, Mapleton: UTRH08536, held by Mike Klauck Construction
- 2024-08-28: LUNDY RESIDENCE, Huntsville: UTRH08537, held by Karl Lundin
- 2024-08-29: TOSA SLC, Salt Lake City: UTRC09468, held by Bluroc Development
- 2024-08-29: WESTFEILD DEVELOPMENT, Springville: UTRC09469, held by red pine homes
- 2024-08-29: STONE CREEK LOT 301-HOLBROOK, Bountiful: UTRH08544, held by Jared Holbrook
- 2024-08-29: 2058 ROAN AVE, Saratoga Springs: UTRH08545, held by Dallin Stoddard
- 2024-08-29: LOT 5 HALL ORCHARDS, North Ogden: UTRH08548, held by Carson Jones
478 MAPLE LAKES DRIVE among its neighbors
163 discharge permits are in the Middle Spanish Fork Creek subwatershed (HUC 160202020502); UTRH08538 is one.
Other permits in the Middle Spanish Fork Creek subwatershed (HUC 160202020502)
- 346 CLEGG CANYON, Mapleton: UTRC10603, minor, term to 2026-04-02
- 3548 EAST 1800 SOUTH SPANISH FORK, Spanish Fork: UTRH07098, minor, term to 2024-09-19
- 509 W 350 S, Mapleton: UTRH11553, minor, term to 2027-06-09
- 53 E TWIN HOLLOW, Mapleton: UTRH11827, minor, term to 2027-08-04
- 582 WEST BRUSH CANYON DRIVE, Mapleton: UTRH01851, minor, term to 2021-12-07
- 681 SLANT, Mapleton: UTRC11786, minor, term to 2026-10-15
- 72 E 400 SOUTH MAPLETON, UTAH, Mapleton: UTRH00928, minor, term to 2021-07-30
- 72 EAST 400 SOUTH MAPLETON, Mapleton: UTRH10704, minor, term to 2026-12-01
- ALLEN MAPLETON RESIDENCE, Mapleton: UTRH09350, minor, term to 2026-03-11
- ALRIG - OIL CHANGERS - CANYON GATE, Spanish Fork: UTRC04478, minor, term to 2023-02-23
Nearby on the register
- Discharge permits in Mapleton
- Every permit record in Mapleton, A to Z
- Discharge permits in Utah
- Every permit record in Utah, A to Z
Figures from EPA’s ICIS-NPDES download, loaded September 15, 2026.
What this page shows
The permit filed as 478 MAPLE LAKES DRIVE, a Storm Water Construction general permit coverage in Mapleton, Utah (NPDES ID UTRH08538), is one of 169 storm water construction permits in Mapleton, and the register lists 0.0% of those as having a violation on file. It also sits among 163 NPDES permits in the Middle Spanish Fork Creek subwatershed, this one included. Of all 165 storm water construction permits in Mapleton, 35.2% were issued earlier than this one.