NPDES UTRH09041 · Clean Water Act
RIVER HOLLOW LOT 58, St. George, UT: NPDES UTRH09041 discharge permit, effluent exceedances, inspections, penalties
RIVER HOLLOW LOT 58, St. George, Utah: General permit coverage UTRH09041, held by Michael & Staci Oliver; Construction stormwater; Administratively continued; issued January 4, 2025, term to January 3, 2026, by UTDEQ.
Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 8,321 were issued before UTRH09041.
Coverages issued nearest UTRH09041
- 2025-01-03: TAX HAWK, Provo: UTRC07975, held by Westland Construction
- 2025-01-03: ROCK CANYON AQUIFER BOOSTER STATION, Provo: UTRC08156, held by Whitaker Construction
- 2025-01-03: JSD LEARNING CENTER, South Jordan: UTRC10087, held by Engage Contracting
- 2025-01-03: JORDAN BLUFFS WEST SIDE, Midvale: UTRC10089, held by Siri Contracting, LLC
- 2025-01-04: LOT 61 HAPPY DAYS, Farr West: UTRH09040, held by Rasmussen Kitchen & Bath
- 2025-01-06: COWBOY ESTATES, Grantsville: UTRC06302, held by Grantsville New Team LLC
- 2025-01-06: MATTHEWS MEADOWS, Grantsville: UTRC06303, held by Grantsville New Team LLC
- 2025-01-06: WEST FIELDS SUBDIVISION, West Point: UTRC08108, held by Westates Construction
- 2025-01-06: PROVO RIVER WATER TREATMENT PLANT, Provo: UTRC08256, held by MGC Contractors
- 2025-01-06: PINE TOP, Park City: UTRC10093, held by Moncrief Construciton
RIVER HOLLOW LOT 58 among its neighbors
636 discharge permits are in the Middleton Wash-Virgin River subwatershed (HUC 150100080910); UTRH09041 is one.
Other permits in the Middleton Wash-Virgin River subwatershed (HUC 150100080910)
- 1103 ST GEORGE (SG-5-3-10-1103), St. George: UTRH06625, minor, term to 2024-05-17
- 123 CRIMSON VISTA, St. George: UTRH03262, minor, term to 2022-06-17
- 1236 S SIERRA VISTA CIRCLE, St. George: UTRL00265
- 1358 E PONY TRAIL WAY WASHINGTON, UTAH 84780, Washington: UTRH10276, minor, term to 2026-09-04
- 1450 EAST ROADWAY EXTENSION, St. George: UTRC03020, minor, term to 2022-06-20
- 1450 EAST ROADWAY EXTENSION, St. George: UTRC03088, minor, term to 2022-07-05
- 29 BOULDERS, St. George: UTRH03475, minor, term to 2022-07-26
- 30 GRAND HEIGHTS, St. George: UTRH03266, minor, term to 2022-06-17
- 34 WESTGATE HILLS, Washington: UTRH05029, minor, term to 2023-04-10
- 3430 E/EZRA LN IMPROVMENTS, St. George: UTRL00727
What stands out
- Its term runs 364 days, January 4, 2025 to January 3, 2026; the term ended 255 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to September 15, 2026.
- It is one of 17,184 discharge permits on the register in Utah; 14,166 of them (82%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | RIVER HOLLOW LOT 58 |
|---|---|
| Permittee | Michael & Staci Oliver |
| NPDES ID | UTRH09041 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | January 4, 2025 |
| Expires | January 3, 2026 |
| Agency | UTDEQ |
| Address | St. George, UT 84790 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Middleton Wash-Virgin River (HUC 150100080910) |
NPDES UTRH09041: effluent limits and exceedances
RIVER HOLLOW LOT 58 (NPDES UTRH09041): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES UTRH09041: no pollutant row on file.
NPDES UTRH09041: inspections, violations and enforcement
NPDES UTRH09041 (RIVER HOLLOW LOT 58): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES UTRH09041
NPDES UTRH09041: one email when its EPA record changes — $99/month.
Permits near NPDES UTRH09041
NPDES UTRH09041: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.