WILLIAMS PROJECT, Payson, Utah: General permit coverage UTRH09492, held by ASB Construction; Construction stormwater; Administratively continued; issued April 2, 2025, term to April 1, 2026, by UTDEQ.
Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 8,981 were issued before UTRH09492.
Coverages issued nearest UTRH09492
- 2025-04-02: DEE RESIDENCE, Sandy: UTRH08264, held by Rhett Dee
- 2025-04-02: ESTATES @ OLD FARM #13, St. George: UTRH09486, held by Christensen Homes
- 2025-04-02: 4B RANCH #10, Cedar City: UTRH09488, held by Peak Construction
- 2025-04-02: 2623 S COLT DR, SARATOGA SPRINGS, Saratoga Springs: UTRH09489, held by Adam Alsuri
- 2025-04-02: SUMMIT VIEW 3, St. George: UTRH09491, held by Cedar Pointe Homes, LLC
- 2025-04-02: WILSON FARMS, Brigham City: UTRH09494, held by Evan and Hayley Shakespear
- 2025-04-03: BNR WASTEWATER TREATMENT PLANT, Morgan: UTRC06824, held by COP Construction LLC
- 2025-04-03: 346 CLEGG CANYON, Mapleton: UTRC10603, held by Brandon Read
- 2025-04-03: JUMBERS SUBSTATION, Saratoga Springs: UTRC10604, held by Cache Valley Electric
- 2025-04-03: OLD FARM PHASES 2 - 4, Cedar City: UTRC10606, held by Juniper Development
WILLIAMS PROJECT among its neighbors
10 discharge permits are in the Peteetneet Creek subwatershed (HUC 160202020601); UTRH09492 is one.
Other permits in the Peteetneet Creek subwatershed (HUC 160202020601)
- BELLE HOLLOW SUBDIVISION, Payson: UTRC10108, minor, term to 2026-01-06
- GENEVA ROCK PRODUCTS: PAYSON, Payson: UTR268053, minor, term to 2023-12-31
- NEBO LOOP ROAD REALIGNMENT, Payson: UTRL00355
- PAYSON 2, 3 WARDS, Payson: UTR310606, minor, term to 2010-03-20
- PAYSON CITY WELL #2 REHABILITATION PROJECT, Payson: UTRC08215, minor, term to 2025-01-24
- PAYSON LOTS, Payson: UTRH06842, minor, term to 2024-07-16
- PAYSON TECH BUILDINGS 3&4, Payson: UTRC10222, minor, term to 2026-02-04
- UTAH COUNTY EWP DSR, Payson: UTRC01437, minor, term to 2021-10-13
- WALGREENS #13011, Payson: UTR307753, minor, term to 2010-02-04
Identity
| Facility | WILLIAMS PROJECT |
|---|---|
| Permittee | ASB Construction |
| NPDES ID | UTRH09492 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | April 2, 2025 |
| Expires | April 1, 2026 |
| Agency | UTDEQ |
| Address | Payson, UT 84651 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Peteetneet Creek (HUC 160202020601) |
NPDES UTRH09492: effluent limits and exceedances
WILLIAMS PROJECT (NPDES UTRH09492): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES UTRH09492: no pollutant row on file.
NPDES UTRH09492: inspections, violations and enforcement
NPDES UTRH09492 (WILLIAMS PROJECT): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES UTRH09492
NPDES UTRH09492: one email when its EPA record changes — $99/month.
Permits near NPDES UTRH09492
NPDES UTRH09492: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.