NPDES UTRH09905 · Clean Water Act
SUMMIT EDEN RIDGE NESTS LOT 7-POPE RESIDENCE, Eden, UT: NPDES UTRH09905 discharge permit, effluent exceedances, inspections, penalties
SUMMIT EDEN RIDGE NESTS LOT 7-POPE RESIDENCE, Eden, Utah: General permit coverage UTRH09905, held by Albert Pope; Construction stormwater; Administratively continued; issued June 24, 2025, term to June 23, 2026, by UTDEQ.
Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 9,679 were issued before UTRH09905.
Coverages issued nearest UTRH09905
- 2025-06-24: DAYBREAK, South Jordan: UTRC11131, held by Rainey Homes
- 2025-06-24: THE SHOPS ON MAIN, Herriman: UTRC11137, held by The Shops On Main LLC
- 2025-06-24: THE HIGHLANDS, Grantsville: UTRC11140, held by Updwell Homes
- 2025-06-24: OVERLOOK 3, Eden: UTRH03058, held by Blue Willow Builders
- 2025-06-24: GARRISON RESIDENCE- POWDER MOUNTAIN, Eden: UTRH09904, held by Blue Willow Builders
- 2025-06-24: SADDLEWOOD ESTATES LOT 21, West Haven: UTRH09907, held by chase stevenson construction
- 2025-06-24: SCENIC POINTE LOT 31, Hurricane: UTRH09909, held by Urban Desert Homes
- 2025-06-25: WPR LOT C14, Morgan: UTRC08851, held by Edge Builders
- 2025-06-25: TONAQUINT HEIGHTS 4 - 7, St. George: UTRC09021, held by Quality Excavation
- 2025-06-25: PRECISION MEDICAL BUILDING, Saratoga Springs: UTRC11094, held by K Barr Co
SUMMIT EDEN RIDGE NESTS LOT 7-POPE RESIDENCE among its neighbors
6 discharge permits are in the Davenport Creek subwatershed (HUC 160102030102); UTRH09905 is one.
Other permits in the Davenport Creek subwatershed (HUC 160102030102)
- DAVENPORT SKI TRAILS, Eden: UTRC11672, minor, term to 2026-09-25
- LOT 8 RIDGE NESTS POWDER MOUNTAIN, Eden: UTRH11435, minor, term to 2027-05-19
- POWDER MOUNTAIN LIFTS 2024, Eden: UTRC08881, minor, term to 2026-05-19
- POWDER MTN- FIRE STATION, Eden: UTRC13097, minor, term to 2027-06-25
- SUNDOWN PUMP STATION, Eden: UTRC13277, minor, term to 2027-07-26
What stands out
- Its term runs 364 days, June 24, 2025 to June 23, 2026; the term ended 84 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to September 15, 2026.
- It is one of 17,184 discharge permits on the register in Utah; 14,166 of them (82%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | SUMMIT EDEN RIDGE NESTS LOT 7-POPE RESIDENCE |
|---|---|
| Permittee | Albert Pope |
| NPDES ID | UTRH09905 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | June 24, 2025 |
| Expires | June 23, 2026 |
| Agency | UTDEQ |
| Address | Eden, UT 84310 |
| Subwatershed | Davenport Creek (HUC 160102030102) |
NPDES UTRH09905: effluent limits and exceedances
SUMMIT EDEN RIDGE NESTS LOT 7-POPE RESIDENCE (NPDES UTRH09905): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES UTRH09905: no pollutant row on file.
NPDES UTRH09905: inspections, violations and enforcement
NPDES UTRH09905 (SUMMIT EDEN RIDGE NESTS LOT 7-POPE RESIDENCE): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES UTRH09905
NPDES UTRH09905: one email when its EPA record changes — $99/month.
Permits near NPDES UTRH09905
NPDES UTRH09905: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.