NPDES UTRH10281 · Clean Water Act
SKIBIDI RIZ, Riverton, UT: NPDES UTRH10281 discharge permit, effluent exceedances, inspections, penalties
SKIBIDI RIZ, Riverton, Utah: General permit coverage UTRH10281, held by Chris Dugan; Construction stormwater; Administratively continued; issued September 8, 2025, term to September 7, 2026, by UTDEQ.
Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 10,363 were issued before UTRH10281.
Coverages issued nearest UTRH10281
- 2025-09-08: THE MEADOWS AT SKY VIEW, Smithfield: UTRC11571, held by Visionary Homes
- 2025-09-08: TUFFLI COMMERCIAL, Spanish Fork: UTRC11572, held by M K Excavating Inc
- 2025-09-08: ALPINE HOLLOW SUBDIVISION, Draper: UTRC11573, held by Hadco Construction
- 2025-09-08: SKYRIDGE, Heber City: UTRC11574, held by Jordan Clyde
- 2025-09-08: MOLLINET CABIN, Woodland: UTRH10230, held by Mike Mollinet
- 2025-09-08: TONAQUINT RIDGE #402, St. George: UTRH10282, held by Sullivan Homes
- 2025-09-08: BUHKSHTABER, Park City: UTRH10283, held by Chatwin Homes
- 2025-09-08: HUNTER RESIDENCE - DRAPER, Draper: UTRH10284, held by Zach Hunter
- 2025-09-08: SANDS COVE 19, Hurricane: UTRH10285, held by Robin Vaughn
- 2025-09-08: WILLOW LAKES, LOT 68, Logan: UTRH10287, held by Neil Sessions (Sessions Corporation)
SKIBIDI RIZ among its neighbors
100 discharge permits are in the Butterfield Creek subwatershed (HUC 160202040103); UTRH10281 is one.
Other permits in the Butterfield Creek subwatershed (HUC 160202040103)
- 13000 S MVC CRUSHING SITE, Herriman: UTRC08254, minor, term to 2025-02-04
- 8172 W DRY CANYON CIRCLE, HERRIMAN, Herriman: UTRH05515, minor, term to 2023-07-04
- ALDORA RIDGE SUBDIVISION BY GREEN HAVEN HOMES, Herriman: UTRC11981, minor, term to 2026-11-30
- APEX INSURANCE, Riverton: UTRC01609, minor, term to 2021-11-09
- BALDAUF SUBDIVISION 2, Herriman: UTRC06464, minor, term to 2025-02-27
- BANGERTER SOUTH INTERCHANGES -13400 SOUTH, Riverton: UTRC07451, minor, term to 2025-08-23
- BANGERTER SOUTH INTERCHANGES-13400 SOUTH, Riverton: UTRC09313, minor, term to 2025-07-31
- BECKSTEAD/BUTTERFIELD OFFICE CONVERSION, Riverton: UTR391917, minor, term to 2020-03-15
- BECKSTROM RESIDENCE, Riverton: UTRH07088, minor, term to 2024-09-17
- BOWDEN RESIDENCE, Herriman: UTRC13049, minor, term to 2027-06-17
What stands out
- Its term runs 364 days, September 8, 2025 to September 7, 2026; the term ended 8 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to September 15, 2026.
- It is one of 17,184 discharge permits on the register in Utah; 14,166 of them (82%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | SKIBIDI RIZ |
|---|---|
| Permittee | Chris Dugan |
| NPDES ID | UTRH10281 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | September 8, 2025 |
| Expires | September 7, 2026 |
| Agency | UTDEQ |
| Address | Riverton, UT 84065 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Butterfield Creek (HUC 160202040103) |
NPDES UTRH10281: effluent limits and exceedances
SKIBIDI RIZ (NPDES UTRH10281): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES UTRH10281: no pollutant row on file.
NPDES UTRH10281: inspections, violations and enforcement
NPDES UTRH10281 (SKIBIDI RIZ): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES UTRH10281
NPDES UTRH10281: one email when its EPA record changes — $99/month.
Permits near NPDES UTRH10281
NPDES UTRH10281: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.