NPDES UTRH10501 · Clean Water Act
SUMMIT CREEK, Woodland Hills, UT: NPDES UTRH10501 discharge permit, effluent exceedances, inspections, penalties
SUMMIT CREEK, Woodland Hills, Utah: General permit coverage UTRH10501, held by Trevi Homes; Construction stormwater; Effective; issued October 16, 2025, term to October 15, 2026, by UTDEQ.
Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 10,711 were issued before UTRH10501. Trevi Homes holds 4 permits in Utah.
Other permits held by Trevi Homes
- SUMMIT CREEK LOT 211, Woodland Hills: UTRH10604, issued 2025-11-10
- SUMMIT CREEK LOT 204, Woodland Hills: UTRH11907, issued 2026-08-20
- SUMMIT CREEK LOT 219, Woodland Hills: UTRH11996, issued 2026-09-08
Coverages issued nearest UTRH10501
- 2025-10-16: RED WASH FEEDER CANAL, Lapoint: UTRC11788, held by BHI
- 2025-10-16: LEDGES JOHNSONS ARCH 206, St. George: UTRH10235, held by JMR Design and Construction
- 2025-10-16: 347 W QUAIL FLIGHT RD, Farmington: UTRH10498, held by Douglas Kirkham
- 2025-10-16: ESSES RESIDENCE, Eden: UTRH10499, held by PureHaven Homes
- 2025-10-16: GILBERT RESIDENCE, Mapleton: UTRH10500, held by Brian Mortenson
- 2025-10-16: 2519 DECKER RESIDENCE, Heber City: UTRH10504, held by Jonathan Adams
- 2025-10-16: 2521 GINGRAS RESIDENCE, Heber City: UTRH10505, held by Jonathan Adams
- 2025-10-17: 14600 SOUTH STORM DRAIN OUTFALL TO JORDAN RIVER, Bluffdale: UTRC11789, held by RLW/SWI Joint Venture Team
- 2025-10-17: HALL TREE, North Ogden: UTRC11790, held by Northshore Excavation
- 2025-10-17: MARCELLA LOT 2, Heber City: UTRC11792, held by Midway Construction Co.
SUMMIT CREEK among its neighbors
400 discharge permits are in the Beer Creek subwatershed (HUC 160202020603); UTRH10501 is one.
Other permits in the Beer Creek subwatershed (HUC 160202020603)
- 1102 SOUTH 670 WEST, Salem: UTRH06814, minor, term to 2024-07-06
- 1115 EAGLENEST DR, Woodland Hills: UTRH07467, minor, term to 2025-01-15
- 2130 JOHNSON RESIDENCE, Woodland Hills: UTRH02303, minor, term to 2024-02-15
- 24 LEGACY HILLS, Salem: UTRH07843, minor, term to 2025-04-02
- 25 QUAIL MOUNTAIN, Payson: UTRH10982, minor, term to 2027-02-10
- 254 WEST OLYMPIC LANE, Elk Ridge: UTRH03071, minor, term to 2022-05-18
- 259 EAST 100 NORTH BUTIKOFER RESIDENCE, Salem: UTRH04300, minor, term to 2022-11-25
- 337 W 100 S PAYSON, UTAH 84651, Payson: UTRC11415, minor, term to 2026-08-07
- 472 E SELMAN RIDGE, Salem: UTRH01788, minor, term to 2021-11-24
- 516 N ELK RIDGE, Elk Ridge: UTRH03069, minor, term to 2022-05-18
What stands out
- Its term runs 364 days, October 16, 2025 to October 15, 2026.
- No dated event in the 365 days to September 15, 2026.
- It is one of 17,184 discharge permits on the register in Utah; 14,166 of them (82%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | SUMMIT CREEK |
|---|---|
| Permittee | Trevi Homes |
| NPDES ID | UTRH10501 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | October 16, 2025 |
| Expires | October 15, 2026 |
| Agency | UTDEQ |
| Address | Woodland Hills, UT 84653 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Beer Creek (HUC 160202020603) |
NPDES UTRH10501: effluent limits and exceedances
SUMMIT CREEK (NPDES UTRH10501): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES UTRH10501: no pollutant row on file.
NPDES UTRH10501: inspections, violations and enforcement
NPDES UTRH10501 (SUMMIT CREEK): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES UTRH10501
NPDES UTRH10501: one email when its EPA record changes — $99/month.
Permits near NPDES UTRH10501
NPDES UTRH10501: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.