NPDES UTRH11101 · Clean Water Act
8 SHELTER HILL, Eden, UT: NPDES UTRH11101 discharge permit, effluent exceedances, inspections, penalties
8 SHELTER HILL, Eden, Utah: General permit coverage UTRH11101, held by EDGE Builders; Construction stormwater; Effective; issued May 18, 2026, term to May 17, 2027, by UTDEQ.
Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 12,435 were issued before UTRH11101. EDGE Builders holds 5 permits in Utah.
Other permits held by EDGE Builders
- WPR LOT D17, Morgan: UTRC12796, issued 2026-05-07
- WEHRLY RESIDENCE, Cottonwood Heights: UTRH09752, issued 2025-05-23
- PIERCE HOME, Park City: UTRH10188, issued 2025-08-19
- 110 SHELTER HILL, Eden: UTRH11025, issued 2026-05-18
Coverages issued nearest UTRH11101
- 2026-05-18: CHRISTOFFERSON RANCH, Pleasant View: UTRC12849, held by Kastlerock Excavation
- 2026-05-18: MIDA PROJECT AREA LOT 11 INFRASTRUCTURE, Heber City: UTRC12850, held by Clawson General Contracting, LLC
- 2026-05-18: HILLIN RESIDENCE, Park City: UTRC12851, held by PC Development Group LLC
- 2026-05-18: WEST POINT STORM DRAIN TRUNK LINE, West Point: UTRC12852, held by Thurgood Excavating Inc
- 2026-05-18: 110 SHELTER HILL, Eden: UTRH11025, held by EDGE Builders
- 2026-05-18: SULLIVAN RESIDENCE BY SLATE CONSTRUCTION, Draper: UTRH11424, held by Slate Building Company
- 2026-05-18: HUNTER Z COTTAGE, Draper: UTRH11425, held by Zach Hunter
- 2026-05-18: RICHINS RESIDENCE, Henefer: UTRH11426, held by Johnathan Richins
- 2026-05-19: PIONEER PARK PHASE 1 IMPROVEMENTS PROJECT, Salt Lake City: UTRC11244, held by Salt Lake City Coperation
- 2026-05-19: HILLCREST AT THE LEDGES, St. George: UTRC12853, held by Sagestone Development
8 SHELTER HILL among its neighbors
128 discharge permits are in the Pineview Reservoir-Middle Fork Ogden River subwatershed (HUC 160201020303); UTRH11101 is one.
Other permits in the Pineview Reservoir-Middle Fork Ogden River subwatershed (HUC 160201020303)
- 1 WESTWOOD, Eden: UTRC04096, minor, term to 2022-12-29
- 11 HIDDEN HAVEN ESTATES, Eden: UTRC03189, minor, term to 2022-07-20
- 110 SHELTER HILL, Eden: UTRH11025, minor, term to 2027-05-17
- 114 SHELTER HILL, Eden: UTRH11352, minor, term to 2027-05-03
- 181S 9200E, Huntsville: UTRH11568, minor, term to 2027-06-14
- 2 WESTWOOD, Eden: UTRH04509, minor, term to 2023-01-13
- 2395 NORTH SIERRA DRIVE, Eden: UTRH05962, minor, term to 2023-10-18
- 3 WESTWOOD, Eden: UTRC04097, minor, term to 2022-12-29
- 4 WESTWOOD, Eden: UTRH04863, minor, term to 2023-03-15
- 411 S 7900 E - LOT #10, Huntsville: UTRC11391, minor, term to 2026-08-04
What stands out
- Its term runs 364 days, May 18, 2026 to May 17, 2027.
- No dated event in the 365 days to September 15, 2026.
- It is one of 17,184 discharge permits on the register in Utah; 14,166 of them (82%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | 8 SHELTER HILL |
|---|---|
| Permittee | EDGE Builders |
| NPDES ID | UTRH11101 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | May 18, 2026 |
| Expires | May 17, 2027 |
| Agency | UTDEQ |
| Address | Eden, UT 84310 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Pineview Reservoir-Middle Fork Ogden River (HUC 160201020303) |
NPDES UTRH11101: effluent limits and exceedances
8 SHELTER HILL (NPDES UTRH11101): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES UTRH11101: no pollutant row on file.
NPDES UTRH11101: inspections, violations and enforcement
NPDES UTRH11101 (8 SHELTER HILL): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES UTRH11101
NPDES UTRH11101: one email when its EPA record changes — $99/month.
Permits near NPDES UTRH11101
NPDES UTRH11101: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.