Velarion Records
Free: one email when NPDES UTRH11315 changes. Unsubscribe any time.

NPDES UTRH11315 · Clean Water Act

OLD FARM PHASE 3 LOT 27, Washington, UT: NPDES UTRH11315 discharge permit, effluent exceedances, inspections, penalties

OLD FARM PHASE 3 LOT 27, Washington, Utah: General permit coverage UTRH11315, held by Red Ridge Contracting LLC; Construction stormwater; Effective; issued April 27, 2026, term to April 26, 2027, by UTDEQ.

Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 12,200 were issued before UTRH11315.

Coverages issued nearest UTRH11315

OLD FARM PHASE 3 LOT 27 among its neighbors

636 discharge permits are in the Middleton Wash-Virgin River subwatershed (HUC 150100080910); UTRH11315 is one.

Other permits in the Middleton Wash-Virgin River subwatershed (HUC 150100080910)

Identity

FacilityOLD FARM PHASE 3 LOT 27
PermitteeRed Ridge Contracting LLC
NPDES IDUTRH11315
StatusEffective
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramConstruction stormwater
IssuedApril 27, 2026
ExpiresApril 26, 2027
AgencyUTDEQ
AddressWashington, UT 84780
Receiving water impaired303(D) Listed
SubwatershedMiddleton Wash-Virgin River (HUC 150100080910)

NPDES UTRH11315: effluent limits and exceedances

OLD FARM PHASE 3 LOT 27 (NPDES UTRH11315): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.

NPDES UTRH11315: no pollutant row on file.

NPDES UTRH11315: inspections, violations and enforcement

NPDES UTRH11315 (OLD FARM PHASE 3 LOT 27): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.

Watch NPDES UTRH11315

NPDES UTRH11315: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES UTRH11315

NPDES UTRH11315: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.