NPDES UTRH11413 · Clean Water Act
JM06, Nibley, UT: NPDES UTRH11413 discharge permit, effluent exceedances, inspections, penalties
JM06, Nibley, Utah: General permit coverage UTRH11413, held by Red Clover Homes; Construction stormwater; Effective; issued May 14, 2026, term to May 13, 2027, by UTDEQ.
Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 12,408 were issued before UTRH11413.
Coverages issued nearest UTRH11413
- 2026-05-14: SUNCREST MEADOWS PHASE 4, West Haven: UTRC12831, held by Suncrest Meadows Weber LLC
- 2026-05-14: ALLEN COMMERCIAL BUILDING, Richfield: UTRC12832, held by Donavan & Tyson
- 2026-05-14: POLISTINA RESIDENCE, Heber City: UTRH11410, held by 4C Group LLC
- 2026-05-14: CINDER BLUFFS LOT 106, St. George: UTRH11411, held by FireRock Homes
- 2026-05-14: 5 MOUNTAIN VIEW ESTATES, Hurricane: UTRH11412, held by Robin Vaughn
- 2026-05-14: EATROS RESIDENCE (221), Heber City: UTRH11414, held by Mayflower Luxury Homes
- 2026-05-14: IVINS VISTA LOT 1, Ivins: UTRH11415, held by Keaton Roberts
- 2026-05-15: BENNETT RESIDENCE - BOX ELDER LOT 39, Alpine: UTRC12833, held by Raykon Construction
- 2026-05-15: SLATERVILLE PARK RAMP PROJECT, Marriott-Slaterville: UTRC12834, held by Asphalt Construction & Excavating Company
- 2026-05-15: VERK DRIVE, Spanish Fork: UTRC12835, held by Rino Excavating
JM06 among its neighbors
72 discharge permits are in the Millville Canyon-Blacksmith Fork subwatershed (HUC 160102030209); UTRH11413 is one.
Other permits in the Millville Canyon-Blacksmith Fork subwatershed (HUC 160102030209)
- 542 E. 1080 S. PROVIDENCE UT., Providence: UTRH00730, minor, term to 2021-06-30
- ALTITUDE TOWNHOUSE IRRRIGATIONS, Logan: UTRL00679
- APPLE CREEK SUBDIVISION, Nibley: UTR386851, minor, term to 2020-05-30
- BASSETT HOME, Providence: UTRH03348, minor, term to 2022-06-29
- BASSETT RETAINING WALL, Providence: UTRH08500, minor, term to 2025-08-21
- BENTLEY ESTATES, Providence: UTRL00399
- BENTLEY ESTATES, Providence: UTRL00401
- BINGHAM RESIDENCE - LOT 7, JOHNSON POINT MEADOWS, Nibley: UTRH11442, minor, term to 2027-05-19
- BLACKSMITH FORK VILLAS INTERSTATE COMMERCIAL PROPERTIES, Hyrum: UTG070739, minor, term to 2016-02-03
- BLACKSTONE HEADQUARTERS, Providence: UTRC07581, minor, term to 2025-09-13
What stands out
- Its term runs 364 days, May 14, 2026 to May 13, 2027.
- No dated event in the 365 days to September 15, 2026.
- It is one of 17,184 discharge permits on the register in Utah; 14,166 of them (82%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | JM06 |
|---|---|
| Permittee | Red Clover Homes |
| NPDES ID | UTRH11413 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | May 14, 2026 |
| Expires | May 13, 2027 |
| Agency | UTDEQ |
| Address | Nibley, UT 84321 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Millville Canyon-Blacksmith Fork (HUC 160102030209) |
NPDES UTRH11413: effluent limits and exceedances
JM06 (NPDES UTRH11413): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES UTRH11413: no pollutant row on file.
NPDES UTRH11413: inspections, violations and enforcement
NPDES UTRH11413 (JM06): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES UTRH11413
NPDES UTRH11413: one email when its EPA record changes — $99/month.
Permits near NPDES UTRH11413
NPDES UTRH11413: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.