NPDES UTRH11563 · Clean Water Act
FINLEY FARMS SUBDIVISION PHASE 2 LOT 122, Washington, UT: NPDES UTRH11563 discharge permit, effluent exceedances, inspections, penalties
FINLEY FARMS SUBDIVISION PHASE 2 LOT 122, Washington, Utah: General permit coverage UTRH11563, held by Dustin Moore; Construction stormwater; Effective; issued June 11, 2026, term to June 10, 2027, by UTDEQ.
Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 12,704 were issued before UTRH11563.
Coverages issued nearest UTRH11563
- 2026-06-11: SKYRIDGE LOT 142, Heber City: UTRH11558, held by Brad Garrett
- 2026-06-11: LOT 216 WINSTON PARK, Ogden: UTRH11559, held by Marquee Homes Inc
- 2026-06-11: WASHINMGTON ESTATES #43, Washington: UTRH11560, held by Eastridge Construction
- 2026-06-11: LOT 7 MARSH MOUNTAIN VIEW, Plain City: UTRH11561, held by Paradox Construction
- 2026-06-11: LOT 6 MARSH MOUNTAIN VIEW, Plain City: UTRH11562, held by Cody Wilder & Brett Nielson
- 2026-06-11: SKYRIDGE 168, Daniel: UTRH11564, held by Wardley Homes LLC
- 2026-06-12: SMITHFIELD SPRINGLINE, Smithfield: UTRC12990, held by Smithfield City
- 2026-06-12: CHICANE TUNNEL PROJECT, Park City: UTRC13002, held by Park City Mountain Resort
- 2026-06-12: HOYTSVILLE BRIDGE CONSTRUCTION, Coalville: UTRC13004, held by Geneva Rock Products
- 2026-06-12: WEBER CANYON BRIDGE CONSTRUCTION, Kamas: UTRC13006, held by Geneva Rock Products
FINLEY FARMS SUBDIVISION PHASE 2 LOT 122 among its neighbors
636 discharge permits are in the Middleton Wash-Virgin River subwatershed (HUC 150100080910); UTRH11563 is one.
Other permits in the Middleton Wash-Virgin River subwatershed (HUC 150100080910)
- 1103 ST GEORGE (SG-5-3-10-1103), St. George: UTRH06625, minor, term to 2024-05-17
- 123 CRIMSON VISTA, St. George: UTRH03262, minor, term to 2022-06-17
- 1236 S SIERRA VISTA CIRCLE, St. George: UTRL00265
- 1358 E PONY TRAIL WAY WASHINGTON, UTAH 84780, Washington: UTRH10276, minor, term to 2026-09-04
- 1450 EAST ROADWAY EXTENSION, St. George: UTRC03020, minor, term to 2022-06-20
- 1450 EAST ROADWAY EXTENSION, St. George: UTRC03088, minor, term to 2022-07-05
- 29 BOULDERS, St. George: UTRH03475, minor, term to 2022-07-26
- 30 GRAND HEIGHTS, St. George: UTRH03266, minor, term to 2022-06-17
- 34 WESTGATE HILLS, Washington: UTRH05029, minor, term to 2023-04-10
- 3430 E/EZRA LN IMPROVMENTS, St. George: UTRL00727
Identity
| Facility | FINLEY FARMS SUBDIVISION PHASE 2 LOT 122 |
|---|---|
| Permittee | Dustin Moore |
| NPDES ID | UTRH11563 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | June 11, 2026 |
| Expires | June 10, 2027 |
| Agency | UTDEQ |
| Address | Washington, UT 84780 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Middleton Wash-Virgin River (HUC 150100080910) |
NPDES UTRH11563: effluent limits and exceedances
FINLEY FARMS SUBDIVISION PHASE 2 LOT 122 (NPDES UTRH11563): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES UTRH11563: no pollutant row on file.
NPDES UTRH11563: inspections, violations and enforcement
NPDES UTRH11563 (FINLEY FARMS SUBDIVISION PHASE 2 LOT 122): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES UTRH11563
NPDES UTRH11563: one email when its EPA record changes — $99/month.
Permits near NPDES UTRH11563
NPDES UTRH11563: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.