Velarion Records
Free: one email when NPDES UTRH11962 changes. Unsubscribe any time.

NPDES UTRH11962 · Clean Water Act

ROCKY MEADOWS PHASE 2, Pleasant View, UT: NPDES UTRH11962 discharge permit, effluent exceedances, inspections, penalties

ROCKY MEADOWS PHASE 2, Pleasant View, Utah: General permit coverage UTRH11962, held by Cody and Katie Thompson; Construction stormwater; Effective; issued September 1, 2026, term to August 31, 2027, by UTDEQ.

Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 13,558 were issued before UTRH11962.

Coverages issued nearest UTRH11962

Other permits in Pleasant View

What stands out

  • Its term runs 364 days, September 1, 2026 to August 31, 2027.
  • No dated event in the 365 days to September 15, 2026.
  • It is one of 17,184 discharge permits on the register in Utah; 14,166 of them (82%) are in its program, Construction stormwater, and it is a minor discharger.

Identity

FacilityROCKY MEADOWS PHASE 2
PermitteeCody and Katie Thompson
NPDES IDUTRH11962
StatusEffective
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramConstruction stormwater
IssuedSeptember 1, 2026
ExpiresAugust 31, 2027
AgencyUTDEQ
AddressPleasant View, UT 84414

NPDES UTRH11962: effluent limits and exceedances

ROCKY MEADOWS PHASE 2 (NPDES UTRH11962): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.

NPDES UTRH11962: no pollutant row on file.

NPDES UTRH11962: inspections, violations and enforcement

NPDES UTRH11962 (ROCKY MEADOWS PHASE 2): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.

Watch NPDES UTRH11962

NPDES UTRH11962: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES UTRH11962

NPDES UTRH11962: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.