NPDES UTRI00184 · Clean Water Act
RLW AIRPORT BATCH PLANT WEST, Salt Lake City, UT: NPDES UTRI00184 discharge permit, effluent exceedances, inspections, penalties
RLW AIRPORT BATCH PLANT WEST, Salt Lake City, Utah: General permit coverage UTRI00184, held by Ralph L. Wadsworth Construction; Administratively continued; issued March 13, 2023, term to December 31, 2023, by UTDEQ.
- July 9, 2026: Reconnaissance without Sampling (S).
Other permits held by Ralph L. Wadsworth Construction
- U OF U MED X ROADWAY, Salt Lake City: UTRC00832, issued 2020-07-15
- I-15; SR-232 TO I-84, Layton: UTRC00907, issued 2021-07-29
- PORTER ROCKWELL BRIDGE, Bluffdale: UTRC01642, issued 2020-11-17
- US-89; MP 334.56 - 336.10 - BULLDOG, Provo: UTRC01981, issued 2021-01-26
- SLC TRP, Salt Lake City: UTRC06045, issued 2023-12-07
- COTTONWOOD WASH BRIDGE REPLACEMENT, Blanding: UTRC08726, issued 2024-04-29
RLW AIRPORT BATCH PLANT WEST among its neighbors
186 discharge permits are in the Crystal Creek-Frontal Great Salt Lake subwatershed (HUC 160202040404); UTRI00184 is one.
Other permits in the Crystal Creek-Frontal Great Salt Lake subwatershed (HUC 160202040404)
- 3253 N COMMON, Salt Lake City: UTRH07704, minor, term to 2025-03-11
- 3891 W IRON ROSE PL, Salt Lake City: UTRL00701
- 3FORM, Salt Lake City: UTNX00207, minor, term to 2024-09-05
- 5300 WEST LIFT STATION (SS17) CAPACITY UPGRADES, Salt Lake City: UTG071916, minor, term to 2025-11-05
- 6880 ROAD EXTENSION PROJECT (QUADRANT 2 INFRASTRUCTURE), Salt Lake City: UTRC05573, minor, term to 2023-08-03
- 700 S RECONSTRUCTION PHASE 7, Salt Lake City: UTRC12324, minor, term to 2027-02-22
- 80TH WEST INDUSTRIAL BUILDING 3, Salt Lake City: UTRC05085, minor, term to 2023-06-07
- 80TH WEST INDUSTRIAL BUILDINGS 1 & 2, Salt Lake City: UTRC05084, minor, term to 2023-06-07
- 855 GLADIOLA OFFICE & WAREHOUSE, Salt Lake City: UTRC04596, minor, term to 2023-03-13
- AC MITIGATION INSTALL MP 130-131, Salt Lake City: UTRC13356, minor, term to 2027-08-09
What stands out
- Its term runs 293 days, March 13, 2023 to December 31, 2023; the term ended 989 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- Its newest dated event on file is an inspection on July 9, 2026, 68 days before EPA's file was loaded.
- In the 365 days to September 15, 2026, it was dated 1 inspection.
- EPA's file dates 1 event for it, all in 2026.
- It is one of 17,184 discharge permits on the register in Utah; the file names no program for it, and it is a minor discharger.
Identity
| Facility | RLW AIRPORT BATCH PLANT WEST |
|---|---|
| Permittee | Ralph L. Wadsworth Construction |
| NPDES ID | UTRI00184 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Issued | March 13, 2023 |
| Expires | December 31, 2023 |
| Agency | UTDEQ |
| Address | Salt Lake City, UT 84116 |
| Subwatershed | Crystal Creek-Frontal Great Salt Lake (HUC 160202040404) |
NPDES UTRI00184: effluent limits and exceedances
RLW AIRPORT BATCH PLANT WEST (NPDES UTRI00184): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES UTRI00184: no pollutant row on file.
NPDES UTRI00184: inspections, violations and enforcement
NPDES UTRI00184: 1 inspection
| Date | What EPA recorded | Agency |
|---|---|---|
| July 9, 2026 | Reconnaissance without Sampling | S |
NPDES UTRI00184 (RLW AIRPORT BATCH PLANT WEST): no single-event violation, formal enforcement action and informal enforcement action on file.
Watch NPDES UTRI00184
NPDES UTRI00184: one email when its EPA record changes — $99/month.
Permits near NPDES UTRI00184
NPDES UTRI00184: 0 pollutant rows, 1 dated events; ICIS-NPDES download, loaded September 15, 2026.