NPDES UTRI00349 · Clean Water Act
HURRICANE PIT, Hurricane, UT: NPDES UTRI00349 discharge permit, effluent exceedances, inspections, penalties
HURRICANE PIT, Hurricane, Utah: General permit coverage UTRI00349, held by JP Excavating; Effective; issued March 18, 2025, term to December 31, 2028, by UTDEQ.
Other permits held by JP Excavating
- NICHOLS LANDING COMMERCIAL, St. George: UTRC03555, issued 2023-09-20
- HURRICANE CITY 2800 W, Hurricane: UTRC05268, issued 2022-06-14
- SYCAMORE VILLAGE PHASE 1, Hurricane: UTRC05323, issued 2022-06-22
- SAND HOLLOW TOWNHOMES PH 2, Hurricane: UTRC05924, issued 2022-10-07
- TOQUERVILLE PARKWAY PCKG B, Toquerville: UTRC06980, issued 2023-05-31
- OLD FARM, St. George: UTRC07233, issued 2025-07-09
- SUN RIVER FIRELIGHT - PHASE 1 & 2, Toquerville: UTRC07361, issued 2023-08-07
- ARA SOUTHWEST LOGISTICS CENTER, Washington: UTRC07976, issued 2024-12-21
- EAST VALLEY INDUSTRIAL, Washington: UTRC08388, issued 2025-03-04
- PARAISO SUBDIVISION, Hurricane: UTRC08521, issued 2025-05-12
HURRICANE PIT among its neighbors
85 discharge permits are in the Workman Wash subwatershed (HUC 150100080907); UTRI00349 is one.
Other permits in the Workman Wash subwatershed (HUC 150100080907)
- 105 KNOLLS AT LITTLE VALLEY, St. George: UTRH01968, minor, term to 2022-01-04
- 1355 E PONY WAY WASHINGTON, UT 84780, Washington: UTRH07535, minor, term to 2026-01-31
- ARANCIO POINT, St. George: UTRC03399, minor, term to 2024-08-25
- BALANCE OF NATURE PHASE 1A1 AND 1A2, Hurricane: UTRC08463, minor, term to 2025-03-12
- BUTTERWORTH CUSTOM - VERTICAL, Hurricane: UTRH10788, minor, term to 2027-01-01
- CHACO SOUTH #78, St. George: UTRH07767, minor, term to 2025-03-19
- CLIFF DWELLERS RANCH PHASE 1 LOT 28, Hurricane: UTRC12604, minor, term to 2027-04-08
- COPPER MEADOWS PH 1, Hurricane: UTRC12864, minor, term to 2027-05-19
- COPPER MEADOWS/VISTA - ORCHARDS, Hurricane: UTRC11257, minor, term to 2026-07-14
- COPPER ROCK #5, Hurricane: UTRH03171, minor, term to 2022-06-02
What stands out
- Its term runs 3 years and 288 days, March 18, 2025 to December 31, 2028.
- No dated event in the 365 days to October 14, 2026.
- It is one of 17,184 discharge permits on the register in Utah; the file names no program for it, and it is a minor discharger.
Identity
| Facility | HURRICANE PIT |
|---|---|
| Permittee | JP Excavating |
| NPDES ID | UTRI00349 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Issued | March 18, 2025 |
| Expires | December 31, 2028 |
| Agency | UTDEQ |
| Address | Hurricane, UT 84737 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Workman Wash (HUC 150100080907) |
| SIC | 1442 – Construction Sand And Gravel |
NPDES UTRI00349: effluent limits and exceedances
HURRICANE PIT (NPDES UTRI00349): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES UTRI00349: no pollutant row on file.
NPDES UTRI00349: inspections, violations and enforcement
NPDES UTRI00349 (HURRICANE PIT): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES UTRI00349
NPDES UTRI00349: one email when its EPA record changes — $99/month.
Permits near NPDES UTRI00349
NPDES UTRI00349: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.