NPDES UTRL00257 · Clean Water Act
TAXIWAY E RECONSTRUCTION, North Salt Lake, UT: NPDES UTRL00257 discharge permit, effluent exceedances, inspections, penalties
TAXIWAY E RECONSTRUCTION, North Salt Lake, Utah: General permit coverage UTRL00257, held by Ames Construction, Inc.; Construction stormwater; Not needed.
Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file. Ames Construction, Inc. holds 11 permits in Utah.
Other permits held by Ames Construction, Inc.
- I-15 TECH CORRIDOR, Lehi: UTR384875, issued 2020-01-31
- DFCM 18\ FORCE MAIN SEWER PIPELINE INSTALLATION, Salt Lake City: UTR393497, issued 2019-05-22
- NORTH CARGO APRON SITE DEVELOPMENT, Salt Lake City: UTRC03339, issued 2022-08-16
- SALEM REACH 1, Salem: UTRC04731, issued 2023-03-23
- SEVIER BRIDGE DAM REHAB, Levan: UTRC05736, issued 2022-08-30
- PAROWAN BRIDGE REHABILITATION, Parowan: UTRC12644, issued 2026-04-16
- LAKE POINT QUARRY, Provo: UTRI00017, issued 2020-05-06
- ERDA PIT, Erda: UTRI00018, issued 2020-05-06
- AMES SLC AIRPORT BATCH PLANT, Salt Lake City: UTRI00165, issued 2022-11-07
- GA Z3 HANGER, Salt Lake City: UTRL00418
TAXIWAY E RECONSTRUCTION among its neighbors
465 discharge permits are in the Outlet Jordan River-Frontal Great Salt Lake subwatershed (HUC 160202040405); UTRL00257 is one.
Other permits in the Outlet Jordan River-Frontal Great Salt Lake subwatershed (HUC 160202040405)
- 1100 WEST WATER LINE: 2100 SOUTH TO 2600 SOUTH, Woods Cross: UTRL00668
- 1800 N SEWER REALIGNMENT PHASE 1, Salt Lake City: UTRC04958, minor, term to 2023-05-01
- 1800 N SEWER REALIGNMENT PHASE 2, Salt Lake City: UTRC07580, minor, term to 2024-09-13
- 1800 N SEWER REALIGNMENT PHASE 3, Salt Lake City: UTRC11635, minor, term to 2026-09-21
- 1800 NORTH, Salt Lake City: UTRC05182, minor, term to 2023-06-01
- 1800 NORTH SEWER LINE REHAB PROJECT (SLRP), Salt Lake City: UT0026271, minor, term to 2028-10-31
- 200 NORTH APARTMENTS, Salt Lake City: UTRC04821, minor, term to 2024-04-13
- 200 SOUTH RECONSTRUCTION, PHASE 2, Salt Lake City: UTRC06478, minor, term to 2024-02-29
- 2025 STREET REBUILD PROJECTS, North Salt Lake: UTRL00624
- 2026 STREET REBUILD PROJECTS, North Salt Lake: UTRC12896, minor, term to 2027-05-26
Identity
| Facility | TAXIWAY E RECONSTRUCTION |
|---|---|
| Permittee | Ames Construction, Inc. |
| NPDES ID | UTRL00257 |
| Status | Not needed |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Address | North Salt Lake, UT 84112 |
| Subwatershed | Outlet Jordan River-Frontal Great Salt Lake (HUC 160202040405) |
NPDES UTRL00257: effluent limits and exceedances
TAXIWAY E RECONSTRUCTION (NPDES UTRL00257): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES UTRL00257: no pollutant row on file.
NPDES UTRL00257: inspections, violations and enforcement
NPDES UTRL00257 (TAXIWAY E RECONSTRUCTION): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES UTRL00257
NPDES UTRL00257: one email when its EPA record changes — $99/month.
Permits near NPDES UTRL00257
NPDES UTRL00257: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.