NPDES UTRL00525 · Clean Water Act
TAXIWAY E RECONSTRUCTION F1-F2, Salt Lake City, UT: NPDES UTRL00525 discharge permit, effluent exceedances, inspections, penalties
TAXIWAY E RECONSTRUCTION F1-F2, Salt Lake City, Utah: General permit coverage UTRL00525, held by Ames Construction; Construction stormwater; Not needed.
Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file. Ames Construction holds 9 permits in Utah.
Other permits held by Ames Construction
- 1900 WEST PIPELINE UPGRADE, West Haven: UTG072004, issued 2025-06-17
- SLC AIRPORT TAXIWAYS U AND V, Salt Lake City: UTG072038, issued 2025-09-29
- SR-201 OVER 3200W BRIDGE DECK REPLACEMENT, Salt Lake City: UTRC09086, issued 2024-06-26
- 1900 W. PIPELINE UPGRADE PROJECT, West Haven: UTRC11039, issued 2025-06-09
- US-189: WALLSBURG TO CHARLESTON, Wallsburg: UTRC11329, issued 2025-07-25
- TAXIWAYS U AND V, Salt Lake City: UTRC11486, issued 2025-08-20
- SOUTH TOOELE PIT, Tooele: UTRI00142, issued 2022-06-07
- DMAD DAM TOE DRAIN REHABILITATION PROJECT, Delta: UTRL00546
TAXIWAY E RECONSTRUCTION F1-F2 among its neighbors
465 discharge permits are in the Outlet Jordan River-Frontal Great Salt Lake subwatershed (HUC 160202040405); UTRL00525 is one.
Other permits in the Outlet Jordan River-Frontal Great Salt Lake subwatershed (HUC 160202040405)
- 1100 WEST WATER LINE: 2100 SOUTH TO 2600 SOUTH, Woods Cross: UTRL00668
- 1800 N SEWER REALIGNMENT PHASE 1, Salt Lake City: UTRC04958, minor, term to 2023-05-01
- 1800 N SEWER REALIGNMENT PHASE 2, Salt Lake City: UTRC07580, minor, term to 2024-09-13
- 1800 N SEWER REALIGNMENT PHASE 3, Salt Lake City: UTRC11635, minor, term to 2026-09-21
- 1800 NORTH, Salt Lake City: UTRC05182, minor, term to 2023-06-01
- 1800 NORTH SEWER LINE REHAB PROJECT (SLRP), Salt Lake City: UT0026271, minor, term to 2028-10-31
- 200 NORTH APARTMENTS, Salt Lake City: UTRC04821, minor, term to 2024-04-13
- 200 SOUTH RECONSTRUCTION, PHASE 2, Salt Lake City: UTRC06478, minor, term to 2024-02-29
- 2025 STREET REBUILD PROJECTS, North Salt Lake: UTRL00624
- 2026 STREET REBUILD PROJECTS, North Salt Lake: UTRC12896, minor, term to 2027-05-26
What stands out
- No dated event in the 365 days to September 15, 2026.
- It is one of 17,184 discharge permits on the register in Utah; 14,166 of them (82%) are in its program, Construction stormwater.
Identity
| Facility | TAXIWAY E RECONSTRUCTION F1-F2 |
|---|---|
| Permittee | Ames Construction |
| NPDES ID | UTRL00525 |
| Status | Not needed |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Address | Salt Lake City, UT 84122 |
| Subwatershed | Outlet Jordan River-Frontal Great Salt Lake (HUC 160202040405) |
NPDES UTRL00525: effluent limits and exceedances
TAXIWAY E RECONSTRUCTION F1-F2 (NPDES UTRL00525): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES UTRL00525: no pollutant row on file.
NPDES UTRL00525: inspections, violations and enforcement
NPDES UTRL00525 (TAXIWAY E RECONSTRUCTION F1-F2): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES UTRL00525
NPDES UTRL00525: one email when its EPA record changes — $99/month.
Permits near NPDES UTRL00525
NPDES UTRL00525: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.