Clean Water Act discharge permit · NPDES UTRL00721
CROSS COUNTRY EQUITY, Perry, UT: NPDES UTRL00721 discharge permit, effluent exceedances, inspections, penalties
- Not neededPermit status
- MinorDischarger class
- 0Pollutants under a numeric limit
- 0Pollutants with an effluent exceedance
- 0Inspections on file
- 0Formal enforcement actions
CROSS COUNTRY EQUITY, held by Triple H Excavating, holds NPDES permit UTRL00721. The status and dates are as EPA’s permit file stood when Velarion loaded it (September 15, 2026); EPA’s free Detailed Facility Report on ECHO carries the permit’s current standing.
What the register holds for CROSS COUNTRY EQUITY: its NPDES ID, its permit type and status, its its address in Perry, Utah. EPA’s effluent violation file and its single-event violation file hold no violation for NPDES UTRL00721.
What stands out
- No dated event in the 365 days to September 15, 2026.
- It is one of 17,184 discharge permits on the register in Utah; 14,166 of them (82%) are in its program, Construction stormwater.
Identity
| Facility as filed | CROSS COUNTRY EQUITY |
|---|---|
| Permittee as filed | Triple H Excavating |
| NPDES ID | UTRL00721 |
| Permit status | Not needed |
| Permit type | Coverage under a general permit |
| Discharger class | Minor discharger |
| Facility type | Not a publicly owned treatment works |
| Program | Construction stormwater |
| Address | Perry, UT 84302 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Box Elder Creek-Black Slough (HUC 160102040503) |
Cited to the EPA ICIS-NPDES permit file (ECHO download).
Effluent limits and exceedances
- 0Pollutants on file
- 0Under a numeric limit
- 0With a violation of any kind
- 0With an effluent exceedance
EPA’s limits and effluent violation files hold no pollutant row for NPDES UTRL00721.
Cited to the EPA ICIS-NPDES limits and effluent violations files (ECHO download); up to 60 rows shown, most exceedances first.
Inspections, violations and enforcement
- 0Single-event violations
EPA’s single-event violation file, as loaded, holds no violation for NPDES UTRL00721.
Inspections
EPA’s inspection file holds no inspection for NPDES UTRL00721.
Formal enforcement and penalties
0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.
Informal enforcement
EPA’s informal enforcement file holds no action for NPDES UTRL00721.
Cited to the EPA ICIS-NPDES violation, inspection and enforcement files (ECHO download); up to 50 rows of each shown, newest first.
Watch this permit
One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, UTRL00721.
Start the watch
- One permit holder — $99/month
- One watershed — $2,990/year
- One state — $4,990/year
- The whole register — $18,000/year
How we handle your data → Privacy
EPA publishes a free Detailed Facility Report for every permit on ECHO: its compliance status quarter by quarter, its inspections, and its enforcement actions and penalties. EPA also sends free notices of new inspections and enforcement actions through ECHO Notify; enter NPDES ID UTRL00721 there.
CROSS COUNTRY EQUITY, Perry, Utah: Coverage under a general permit UTRL00721, held by Triple H Excavating; Construction stormwater; Not needed.
Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file.
CROSS COUNTRY EQUITY among its neighbors
124 discharge permits are in the Box Elder Creek-Black Slough subwatershed (HUC 160102040503); UTRL00721 is one.
Other permits in the Box Elder Creek-Black Slough subwatershed (HUC 160102040503)
- 1200 W ROAD EXPANSION, Brigham City: UTRC12643, minor, term to 2027-04-15
- AIRMOTIVE SERVICE, Brigham City: UTG170074, minor, term to 2016-10-30
- AUTOLIV BRIGHAM, Brigham City: UTR000026, minor, term to 2023-12-31
- BACKUS PIT, Honeyville: UTR000989, minor, term to 2023-12-31
- BAKER SPRING REDEVELOPMENT, Brigham City: UTRC00935, minor, term to 2021-07-30
- BARBER RESIDENCE - 24-R SUNCREST PHASE 4, Perry: UTRH00488, minor, term to 2021-05-19
- BC AIRPORT, Brigham City: UTRC03822, minor, term to 2022-11-08
- BC FUEL CENTER, Brigham City: UTRC12963, minor, term to 2027-06-04
- BEAR RIVER BUNKHOUSE, Brigham City: UTRC11639, minor, term to 2026-09-21
- BEAR RIVER LANDING, Perry: UTRC02864, minor, term to 2022-05-23
Nearby on the register
- Discharge permits in Perry
- Every permit record in Perry, A to Z
- Discharge permits in Utah
- Every permit record in Utah, A to Z
Figures from EPA’s ICIS-NPDES download, loaded September 15, 2026.
What this page shows
The permit filed as CROSS COUNTRY EQUITY, held by Triple H Excavating in Perry, Utah under NPDES ID UTRL00721, is one of 39 storm water construction permits on EPA's NPDES register in Perry, this one included. Among those 39 Perry storm water construction permits, 0.0% carry a violation on file, and this permit has no pollutants under a numeric limit and no pollutants with an effluent exceedance. The permit sits within the Box Elder Creek-Black Slough subwatershed, where 124 NPDES permits are listed, this one included.