NPDES VA0088765 · Clean Water Act
AMERICAN ELECTRIC POWER-SMITH MOUNTAIN HYDRO PLANT, Sandy Level, VA: NPDES VA0088765 discharge permit, effluent exceedances, inspections, penalties
AMERICAN ELECTRIC POWER-SMITH MOUNTAIN HYDRO PLANT, Sandy Level, Virginia: Individual permit VA0088765, held by Appalachian Power Company; Administratively continued; issued June 13, 2016, term to June 30, 2020, by VA DEQ; discharges to Roanoke River/Leesville Lake-Clay Branch; Hydroelectric Power Generation.
No violation or effluent exceedance is on file for any of the 3 pollutants listed for NPDES VA0088765.
- Flow, in conduit or thru treatment plant: 14 limits.
- Temperature, water deg. centigrade: 6 limits.
- pH: 4 limits.
Other permits held by Appalachian Power Company
- APCO - GLEN LYN, Glen Lyn: VA0000370, issued 2009-07-10
- AMERICAN ELECTRIC POWER - CLINCH RIVER PLANT, Cleveland: VA0001015, issued 2016-07-01
- CLAYTOR HYDROELECTRIC PLANT, Radford: VA0087084, issued 2014-06-02
- AMERICAN ELECTRIC POWER - NIAGARA HYDRO PLANT, Vinton: VA0087092, issued 2013-08-28
- AMERICAN ELECTRIC POWER - LEESVILLE HYDRO PLANT, Hurt: VA0087106, issued 2014-05-28
- CLAYTOR HYDROELECTRIC PLANT, Radford: VAG402028, issued 2021-08-02
- AMHERST MONROE 69KV TRANSMISSION LINE, Monroe: VAR10S083, issued 2019-07-01
- JOSHUA FALLS RIVERVILLE 138KV TRANSMISSION LINE, Lynchburg: VAR10S084, issued 2019-07-01
- SOAPSTONE 138KV LINE EXTENSION, Nelson: VAR10S402, issued 2019-07-01
- WILDWOOD 138KV STATION, Carroll County: VAR10T281, issued 2019-07-01
AMERICAN ELECTRIC POWER-SMITH MOUNTAIN HYDRO PLANT among its neighbors
3 discharge permits are in the Craddock Creek-Smith Mountain Lake subwatershed (HUC 030101010705); VA0088765 is one. Its county: 22, 0 major; VA0088765 is minor permit.
Other permits in the Craddock Creek-Smith Mountain Lake subwatershed (HUC 030101010705)
- D3 ROAD., Rocky Mount: VAR10Q163, minor, term to 2024-06-30
- MARINERS GRANDE SUBDIVISION, Huddleston: VAR10W366, minor, term to 2029-06-30
What stands out
- Its term runs 4 years and 17 days, June 13, 2016 to June 30, 2020; the term ended 2,297 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to October 14, 2026.
- It is one of 13,137 discharge permits on the register in Virginia; the file names no program for it, and it is a minor discharger.
Identity
| Facility | AMERICAN ELECTRIC POWER-SMITH MOUNTAIN HYDRO PLANT |
|---|---|
| Permittee | Appalachian Power Company |
| NPDES ID | VA0088765 |
| Status | Administratively continued |
| Type | Individual permit |
| Class | Minor |
| Facility type | Non-POTW |
| Issued | June 13, 2016 |
| Expires | June 30, 2020 |
| Agency | VA DEQ |
| Address | Sandy Level, VA 24161 |
| Receiving water | Roanoke River/Leesville Lake-Clay Branch |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Craddock Creek-Smith Mountain Lake (HUC 030101010705) |
| NAICS | 221111 – Hydroelectric Power Generation |
| SIC | 4911 – Electric Services |
NPDES VA0088765: effluent limits and exceedances
AMERICAN ELECTRIC POWER-SMITH MOUNTAIN HYDRO PLANT (NPDES VA0088765): 3 pollutants on file, 3 limited; 0 with a violation of any kind, 0 with an exceedance.
| Pollutant | Limits | Violations | Exceedances | Latest | Largest, as filed |
|---|---|---|---|---|---|
| Flow, in conduit or thru treatment plant | 14 | 0 | 0 | ||
| Temperature, water deg. centigrade | 6 | 0 | 0 | ||
| pH | 4 | 0 | 0 |
NPDES VA0088765: inspections, violations and enforcement
NPDES VA0088765 (AMERICAN ELECTRIC POWER-SMITH MOUNTAIN HYDRO PLANT): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES VA0088765
NPDES VA0088765: one email when its EPA record changes — $99/month.
Permits near NPDES VA0088765
NPDES VA0088765: 3 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.