NPDES VA0093009 · Clean Water Act
CBBT-PARALLEL THIMBLE SHOAL TUNNEL PROJECT, Virginia Beach, VA: NPDES VA0093009 discharge permit, effluent exceedances, inspections, penalties
CBBT-PARALLEL THIMBLE SHOAL TUNNEL PROJECT, Virginia Beach, Virginia: Individual permit VA0093009, held by Dragados USA Inc; Administratively continued; issued November 1, 2019, term to October 31, 2024, by VA DEQ; discharges to Lower Chesapeake Bay.
4 of the 16 pollutants listed for NPDES VA0093009 have no violation or effluent exceedance.
- Solids, total suspended: 2 limits, 12 violations of any kind, 12 effluent exceedances, latest August 31, 2023, largest 285% over the limit.
- Petrol hydrocarbons, total recoverable: 2 limits, 3 violations of any kind, 3 effluent exceedances, latest March 31, 2023, largest 353% over the limit.
- Flow, in conduit or thru treatment plant: 4 limits, 1 violation of any kind, 1 effluent exceedance, latest July 31, 2024, largest 1% over the limit.
- Oxygen, dissolved [DO]: 3 limits, 1 violation of any kind, 1 effluent exceedance, latest July 31, 2022, largest 62% over the limit.
- pH: 2 limits, 1 violation of any kind, 1 effluent exceedance, latest January 31, 2022.
- Toxicity, final conc toxicity units: 2 limits, 1 violation of any kind.
- Nitrogen, total [as N]: 1 limit, 1 violation of any kind.
- Nitrogen, Kjeldahl, total [as N]: 1 limit, 1 violation of any kind.
- Nitrite + Nitrate total [as N]: 1 limit, 1 violation of any kind.
- Phosphorus, total [as P]: 1 limit, 1 violation of any kind.
- Fluoride, total [as F]: 1 limit, 1 violation of any kind.
- Surfactants [MBAS]: 1 limit, 1 violation of any kind.
- Chlorine, total residual: 4 limits.
- Temperature, water deg. centigrade: 2 limits.
- Turbidity: 2 limits.
- Solids, settleable: 2 limits.
Other permits in Virginia Beach
- 17TH STREET IMPROVEMENTS PHASE I, Virginia Beach: VAR10W100, minor, term to 2029-06-30
- 17TH STREET PHASE 1 CAPITAL IMPROVEMENTS, Virginia Beach: VAG830646, minor, term to 2028-02-29
- 18TH STREET CORRIDOR IMPROVEMENTS, Virginia Beach: VAR10S928, minor, term to 2024-06-30
- 525 VIKING DRIVE, Virginia Beach: VAR10X076, minor, term to 2029-06-30
- 531 MEMORIAL, Virginia Beach: VAR10V012, minor, term to 2029-06-30
- ACOUSTICAL SHEETMETAL PHASE 4, Virginia Beach: VAR10W143, minor, term to 2029-06-30
- ADS WAREHOUSE EXPANSION, Virginia Beach: VAR10V417, minor, term to 2029-06-30
- ALLAN MYERS - LASKIN ROAD IMPROVEMENTS, Virginia Beach: VAG830561, minor, term to 2023-02-25
- AMAZON COM SERVICES LLC - DRC6, Virginia Beach: VAR052617, minor, term to 2029-06-30
- AMAZON COM SERVICES LLC – ORF4, Virginia Beach: VAR052664, minor, term to 2029-06-30
What stands out
- Its term runs 4 years and 365 days, November 1, 2019 to October 31, 2024; the term ended 684 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to September 15, 2026.
- 5 of its 16 pollutants on file have an effluent exceedance (31%); 16 are under a numeric limit; the largest exceedance is Petrol hydrocarbons, total recoverable at 353% over its limit.
- It is one of 13,137 discharge permits on the register in Virginia; the file names no program for it, and it is a minor discharger.
Identity
| Facility | CBBT-PARALLEL THIMBLE SHOAL TUNNEL PROJECT |
|---|---|
| Permittee | Dragados USA Inc |
| NPDES ID | VA0093009 |
| Status | Administratively continued |
| Type | Individual permit |
| Class | Minor |
| Facility type | Non-POTW |
| Issued | November 1, 2019 |
| Expires | October 31, 2024 |
| Agency | VA DEQ |
| Address | Virginia Beach, VA 23455 |
| Receiving water | Lower Chesapeake Bay |
| Receiving water impaired | 303(D) Listed |
NPDES VA0093009: effluent limits and exceedances
CBBT-PARALLEL THIMBLE SHOAL TUNNEL PROJECT (NPDES VA0093009): 16 pollutants on file, 16 limited; 12 with a violation of any kind, 5 with an exceedance.
| Pollutant | Limits | Violations | Exceedances | Latest | Largest, as filed |
|---|---|---|---|---|---|
| Solids, total suspended | 2 | 12 | 12 | August 31, 2023 | 285% over the limit |
| Petrol hydrocarbons, total recoverable | 2 | 3 | 3 | March 31, 2023 | 353% over the limit |
| Flow, in conduit or thru treatment plant | 4 | 1 | 1 | July 31, 2024 | 1% over the limit |
| Oxygen, dissolved [DO] | 3 | 1 | 1 | July 31, 2022 | 62% over the limit |
| pH | 2 | 1 | 1 | January 31, 2022 | |
| Toxicity, final conc toxicity units | 2 | 1 | 0 | ||
| Nitrogen, total [as N] | 1 | 1 | 0 | ||
| Nitrogen, Kjeldahl, total [as N] | 1 | 1 | 0 | ||
| Nitrite + Nitrate total [as N] | 1 | 1 | 0 | ||
| Phosphorus, total [as P] | 1 | 1 | 0 | ||
| Fluoride, total [as F] | 1 | 1 | 0 | ||
| Surfactants [MBAS] | 1 | 1 | 0 | ||
| Chlorine, total residual | 4 | 0 | 0 | ||
| Temperature, water deg. centigrade | 2 | 0 | 0 | ||
| Turbidity | 2 | 0 | 0 | ||
| Solids, settleable | 2 | 0 | 0 |
NPDES VA0093009: inspections, violations and enforcement
NPDES VA0093009 (CBBT-PARALLEL THIMBLE SHOAL TUNNEL PROJECT): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES VA0093009
NPDES VA0093009: one email when its EPA record changes — $99/month.
Permits near NPDES VA0093009
NPDES VA0093009: 16 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.