NPDES VAG250157 · Clean Water Act
FRIES HYDROELECTRIC PROJECT, Fries, VA: NPDES VAG250157 discharge permit, effluent exceedances, inspections, penalties
FRIES HYDROELECTRIC PROJECT, Fries, Virginia: General permit coverage VAG250157, held by Consolidated Hydro Southeast Incorporated; Administratively continued; issued March 2, 2018, term to March 1, 2023, by Virginia; discharges to New River-Eagle Bottom Creek; Hydroelectric Power Generation.
- Copper, total recoverable: 1 limit, 4 violations of any kind, 1 effluent exceedance, latest June 30, 2023, largest 28% over the limit.
- pH: 2 limits, 6 violations of any kind.
- Chlorine, total residual: 1 limit, 4 violations of any kind.
- Temperature, water deg. centigrade: 1 limit, 3 violations of any kind.
- Nitrogen, ammonia total [as N]: 1 limit, 3 violations of any kind.
- Phosphorus, total [as P]: 1 limit, 3 violations of any kind.
- Silver total recoverable: 1 limit, 3 violations of any kind.
- Zinc, total recoverable: 1 limit, 3 violations of any kind.
- Flow, in conduit or thru treatment plant: 1 limit, 3 violations of any kind.
- October 30, 2026: Letter of Violation/ Warning Letter (State).
- September 21, 2026: Reconnaissance without Sampling (S).
FRIES HYDROELECTRIC PROJECT among its neighbors
8 discharge permits are in the Eagle Bottom Creek-New River subwatershed (HUC 050500010602); VAG250157 is one. Its county: 10, 0 major; VAG250157 is minor permit.
Other permits in the Eagle Bottom Creek-New River subwatershed (HUC 050500010602)
- C AND B LUMBER INC, Fries: VAR051930, minor, term to 2024-06-30
- FRIES HYDROPOWER DAM POWER CANAL REHABILITATION, Fries: VAR10W188, minor, term to 2029-06-30
- GALAX WWTP, Galax: VA0078484, major, term to 2024-06-30
- JUBAL EARLY - POINT LOOKOUT 69KV LINE, Grayson: VAR10W050, minor, term to 2029-06-30
- PATTON SAND AND CONCRETE LLC, Galax: VAG840010, minor, term to 2024-06-30
- TOWN OF FRIES WWTP, Fries: VA0067881, minor, term to 2024-03-31
- TURMAN HARDWOOD FLOORING, Galax: VAR050016, minor, term to 2024-06-30
What stands out
- Its term runs 4 years and 364 days, March 2, 2018 to March 1, 2023; the term ended 1,323 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as administratively continued.
- Its newest dated event on file is an informal enforcement action on October 30, 2026.
- In the 365 days to October 14, 2026, it was dated 1 inspection.
- EPA's file dates 2 events for it, all in 2026.
- 1 of its 9 pollutants on file has an effluent exceedance (11%); 9 are under a numeric limit; the largest exceedance is Copper, total recoverable at 28% over its limit.
- It is one of 13,137 discharge permits on the register in Virginia; the file names no program for it, and it is a minor discharger.
Identity
| Facility | FRIES HYDROELECTRIC PROJECT |
|---|---|
| Permittee | Consolidated Hydro Southeast Incorporated |
| NPDES ID | VAG250157 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Issued | March 2, 2018 |
| Expires | March 1, 2023 |
| Agency | Virginia |
| Address | Fries, VA 24330 |
| Receiving water | New River-Eagle Bottom Creek |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Eagle Bottom Creek-New River (HUC 050500010602) |
| NAICS | 221111 – Hydroelectric Power Generation |
| SIC | 4911 – Electric Services |
| Other EPA IDs (FRS) | RCRA handler VAP111202011 |
NPDES VAG250157: effluent limits and exceedances
FRIES HYDROELECTRIC PROJECT (NPDES VAG250157): 9 pollutants on file, 9 limited; 9 with a violation of any kind, 1 with an exceedance.
| Pollutant | Limits | Violations | Exceedances | Latest | Largest, as filed |
|---|---|---|---|---|---|
| Copper, total recoverable | 1 | 4 | 1 | June 30, 2023 | 28% over the limit |
| pH | 2 | 6 | 0 | ||
| Chlorine, total residual | 1 | 4 | 0 | ||
| Temperature, water deg. centigrade | 1 | 3 | 0 | ||
| Nitrogen, ammonia total [as N] | 1 | 3 | 0 | ||
| Phosphorus, total [as P] | 1 | 3 | 0 | ||
| Silver total recoverable | 1 | 3 | 0 | ||
| Zinc, total recoverable | 1 | 3 | 0 | ||
| Flow, in conduit or thru treatment plant | 1 | 3 | 0 |
NPDES VAG250157: inspections, violations and enforcement
NPDES VAG250157: 1 inspection
| Date | What EPA recorded | Agency |
|---|---|---|
| September 21, 2026 | Reconnaissance without Sampling | S |
NPDES VAG250157: 1 informal enforcement action
| Date | What EPA recorded | Agency |
|---|---|---|
| October 30, 2026 | Letter of Violation/ Warning Letter | State |
NPDES VAG250157 (FRIES HYDROELECTRIC PROJECT): no single-event violation and formal enforcement action on file.
Watch NPDES VAG250157
NPDES VAG250157: one email when its EPA record changes — $99/month.
Permits near NPDES VAG250157
NPDES VAG250157: 9 pollutant rows, 2 dated events; ICIS-NPDES download, loaded October 14, 2026.